Tweet
Table Of Contents
I.
Introductory
II.
Particulars Of The Colliery And Its Background
(a)
General
(b)
Method of Working
(c)
Ventilation
(d)
Fire-Fighting Arrangements
(e)
Man-riding Trains
(f)
Telephones
III.
The Fire
IV.
Sealing-Off And Subsequent Recovery Operations
V.
Examination Of The Fire Area
VI.
Cause Of Cut Belt
VII.
The Fire Place Of Origin, Extension And Cause
VIII.
Withdrawal Of Workmen From The Inbye Side Of Fire
(a)
Warning Arrangements
(b)
Ways and Means of Escape
(c)
Provision of Two Intake Airways
IX.
Supervision Of Trunk Conveyor System And Of Transfer Points
X.
Conclusions And Recommendations
(1)
Prevention of Conveyor Fires
(2)
Fighting of Conveyor Fires
(3)
Warning to Men Inbye
(4)
Means of Escape
XI.
Acknowledgements
Appendix I
List of Victims
Appendix II
List of Witnesses
Appendix III
National Coal Board Directive on Provision of Two Intake Airways
Appendix IV
Programme of Investigation Work on Fire Hazards at Mines
Plan No. 1. — Rescue and Fire-fighting Plan, etc.
Plan No. 2. — Plan showing estimated Time Intervals indicating Spread of Fumes and Disposition of Personnel. 25th to 26th September. 1950.
Mail:
Webmaster
Back
Home
Contains public sector information licensed under the
Open Government Licence v3.0
.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022
Privacy Policy
Terms & Conditions
Search
Print