IV. — Sealing-Off And Subsequent Recovery Operations
The site chosen for the two initial seals was a short distance inbye the stable slit and fully 1,000 yards from the pit-bottom. The stoppings were built with sand-bags. The intake stopping was 8 yards long and the return stopping, which had to be built under difficult and very trying conditions by men wearing self-contained breathing apparatus, was 7 yards long. Each stopping was fitted with a 2 inches diameter steel sampling tube and a 10 inches diameter steel ventilation pipe. During the building of each stopping, a tunnel, 3 feet square, was formed to maintain ventilation as long as possible. At one period during the building of the stopping in the return airway the rescue teams were man-handling sand-bags at the rate of 800 per hour. Two teams worked in the return, each for two-hour spells, but the work was so arranged that one team was being relieved every hour. The fresh incoming team carried the sand-bags to the site while the team previously transporting material for an hour, spent the second hour in actual building of the stopping. Sufficient sand-bags were taken close to the stoppings before commencing to fill in the "tunnels". This operation was timed to take place simultaneously in both stoppings. Similarly, when the tunnels were filled, the final sealing was completed simultaneously by bolting plates on the ends of the 10 inches diameter steel pipes. During these sealing operations, only the minimum number of men required to do the work and supervise it were permitted underground. After sealing, all persons were withdrawn from the mine and no one was allowed underground for 48 hours. Two days later, a careful inspection of the seals showed that they were in good order, and steps were taken to ensure that the air pressures on both stoppings were reasonably balanced. The outbye ends of the stoppings were then strengthened by the erection of brick walls, 3 feet thick.
Thereafter, systematic sampling of the atmosphere behind the stoppings was carried out continuously. In time, the results of analyses of samples indicated that all combustion within the sealed-off area had ceased. A meeting of all the interested parties was held on 18th December, 1950, when it was decided to set up a panel of experts to plan a scheme for reopening the district and have it ready so that work could begin during the Easter holidays, commencing the 22nd March, 1951. It was thought that this would allow ample time for the strata to cool and also minimize any tendency to a recrudescence of the fire when the ventilation was restored. The plan was duly prepared and was submitted to and approved by another meeting of representatives of all the interested parties held on 23rd February, 1951. With the coming of the Easter holidays, the work of reopening began.
Rescue teams were used for broaching both seals, for preliminary exploration and for the erection of temporary stoppings at selected points so that the noxious and inflammable gases could be removed in stages. It was realized that methane would bulk very largely in these gases. Careful control of the quantity of air passing into the affected area limited the final methane content of the atmosphere in the upcast shaft and kept it below the lower limit of inflammability. As a further precaution, however, the fan evasee was extended to a height of 70 feet, so as to minimize risk of ignition on the surface and the possibility of recirculation of gas-laden air through the downcast shaft.
Operations proceeded according to plan until the district was cleared as far as the bottom of the Elmton Fault drifts, but the quantity of air available here was very severely restricted by an extensive heavy fall on the conveyor road between 59's timber slit and the compressor slit at the top of the Elmton Drift. Unfortunately, at this time, there was also a sudden drop in the barometric pressure which liberated gas from the inbye panels and, because of the restriction due to falls in the conveyor road, the available ventilation was unable to cope with the new conditions. In these circumstances, it was decided to seal off the district once again, but before doing so, 27 bodies were recovered and two more located. This time the seals were built in both roadways at the top of the Elmton Drifts.
During the exploration of the roadways, it was established that the fire had extended from No. 2 transfer point to the outbye side of the compressor slit — a distance of 610 yards. The position of the new seals, therefore, allowed for a full inspection of all the fire area and enabled the conveyor road to be repaired so that full ventilation would be available for the final clearing of the working panels. This was effected on 10th August, 1951, and the remaining six bodies were recovered.
In all these operations, as in the earlier work, the rescue teams drawn from a wide area did a fine job, working with diligence and courage, and performing hard and hazardous tasks without any untoward incident. It is noteworthy that some teams travelled as much as 1,500 yards away from the fresh-air base, thus making a total journey of 3,000 yards.
The work of the Area Scientific Department of the National Coal Board in relation to air sampling and analysis during the rescue and recovery operations is worthy of record. The staff dealt with more than 1,000 samples. To begin with the analyses were made in the laboratory at Bolsover, some miles away. When for a period it was found desirable to take samples at intervals of 15 minutes throughout the day and night, it was decided to convert a room at the Creswell offices into a temporary laboratory. This arrangement proved highly satisfactory when the district was being sealed off, and especially during the building of the stopping in the main-return airway. As the tunnel in this stopping began to function, the flame-safety lamp tests made by the rescue men began to indicate increasing percentages of firedamp in the air, and at one time as high as 3 per cent. This was disturbing in an area where there was known to be an open fire in the vicinity. Laboratory analyses of samples never showed more than 0.5 to 0.6 per cent., and there is no doubt that the large number of samples taken and the early report of the results of analyses from the laboratory did much to create a feeling of confidence in the men in the danger zone. It would appear that the dust raised by the high-velocity air passing through the tunnel in the stopping had the effect of elongating the gas-cap of the flame-safety lamp.
By their systematic sampling and analysis and their interpretation of the results of analyses, the scientific staff greatly helped those in charge of underground operations not only to determine when to reopen the district but also how much air to circulate to ensure that, when the inbye workings were being cleared of inflammable and noxious gases, these gases were diluted to harmless proportions.