General Description
The Colliery
The Union Seam
No. 2 District
General
Ventilation
Shotfiring
Precautions against coal dust
Automatic firedamp detectors
General experience
The Day Before The Explosion
The Afternoon Shift of 21st March
The Night Shift of 21st — 22nd March
The Day Shift of 22nd March
The Explosion
The Investigation
General
The Extent of Flame and Blast
The intake gate
The face and stables
The return gate
Summary
Ventilation
Explosives
Safety Lamps
Contraband
Road Dust Samples
Electrical Apparatus
Mechanical Apparatus
Frictional Heat
Strata Control
The Cause Of The Explosion
Point of ignition and Spread of Explosion
Source of the Firedamp
Means of Ignition
Frictional Heat
Explosives
Conclusions
General Remarks
Firedamp Drainage and Caving
Stables
Automatic Firedamp Alarms
The Use of Explosives
Aluminium Alloys and Wrapping Foil
Recommendations
Acknowledgments
Appendix I — Names of Casualties
Appendix II — Names of Witnesses
Mail:
Webmaster
Back
Home
Contains public sector information licensed under the
Open Government Licence v3.0
.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022
Privacy Policy
Terms & Conditions
Search
Print