Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Report on the Causes of, and circumstances attending, the explosion which occurred at Hapton Valley Colliery, Lancashire, on 22nd March, 1962

24th September, 1962

The Right Honourable Richard Wood, M.P.,

Minister of Power.

Sir,

In accordance with your direction, I held a public inquiry with respect to the accident which occurred at Hapton Valley Colliery in the County of Lancaster on 22nd March, 1962, in which sixteen persons were killed, three died in hospital from injuries received, and thirteen persons were seriously injured. The names, ages and occupations of the killed and injured are given in Appendix I.

2. I opened the inquiry in the Borough Police Headquarters, Burnley, on 18th June, 1962; it lasted for five days during which sixty-one persons gave evidence. Their names and occupations are given in Appendix II.

3. The representation of the interested parties was as follows :—

The Ministry of Power, by Mr. R. H. Clough, O.B.E., H.M. Divisional Inspector of Mines and Quarries, North Western Division, with Dr. E. M. Guenault, Deputy Director of the Safety in Mines Research Establishment.
The National Coal Board, by Dr. H. L. Willett, Deputy Director-General of Production (Safety and Techniques) with Mr. E. J. Kimmins, Production Director, North Western Division, and Mr. R. Lowe, lately Area General Manager, Burnley Area.
The National Union of Mineworkers, by Mr. J. Gormley, J.P., General Secretary of the Lancashire Area, with Mr. L. K. Crossley, President of the Lancashire Area, Mr. K. Saunders, Mining Adviser to the Union, and Mr. T. Sharples, Secretary, Hapton Valley Branch.
The National Association of Colliery Overmen, Deputies and Shotfirers, by Mr. L. C. A. Benson, O.B.E., Mining Engineer, with Mr. J. Crawford, General Secretary, Mr. W. Grundy, General Secretary, North Western Area and Mr. J. Ashurst, Treasurer, North Western Area.
The National Association of Colliery Managers and the British Association of Colliery Management, by Sir Andrew Bryan, D.Sc., LL.D., F.R.S.E., Mining Engineer, with Mr. W. Oldroyd, Manager of Huncoat and Scaitcliffe Collieries, and Mr. J. M. Broadie-Griffiths, LL.B., Secretary, North Western Branch, British Association of Colliery Management.

4. I find that the casualties resulted from an explosion which occurred at about 9.45 a.m. in the No. 2 District of the Union Seam. Although coal dust played some part, the explosion was predominantly one of firedamp and affected about 680 yards of roadway and face. The evidence suggests that the explosion originated either in the return gate stable, as a result of shotfiring, or at a point in the return gate between 180 to 280 yards outbye of the face ripping, from a flash produced by friction involving metallic foil (a thermite reaction). I am, however, unable to say which of those alternatives was the more probable. Equally inconclusive was the evidence as to the source of the firedamp involved.

General Description

The Colliery

5. Hapton Valley Colliery is in the National Coal Board's North Western Division and is situated on the boundary of the County Borough of Burnley. The line of management was R. Lowe, Area General Manager; J. Whittaker, Area Production Manager; W. E. Rawstron, Group Manager; A. L. Weir, Manager; and R. O'Hara, Under-manager. On the day of the explosion, B. Kennedy, a certificated colliery manager, was exercising supervision in the absence of Mr. Weir. The colliery, which employed 386 men below ground and 67 on the surface, had a daily output of about 700 tons of saleable coal, all got from two faces, Nos. 2 and 5, in the Union Seam. The general layout of the underground workings and the ventilation system are shown on Plan No. 1.

6. The colliery has three shafts: No. 3, the downcast, used for winding men, coal and materials; No. 4, the upcast, used for winding men only; No. 2 was used for pumping only but, although it was downcasting, it did not contribute to the ventilation of the mine workings. No. 4 shaft was equipped with an electrically driven exhausting fan producing 112,000 cubic feet of air per minute at 4.3 inches of water gauge. Following its completion in January, 1962, a surface drift, 1,260 yards long and dipping at a gradient of 1 in 4. 16, was brought into use as a second intake. Before this drift connected with the mine workings, the ventilation of the mine had been assisted by a booster fan situated in the main return airway about half a mile from the bottom of the upcast shaft. Because it no longer made any significant contribution to the ventilation of the mine, the booster fan was taken out of commission and put on a care and maintenance basis in March, 1962.

7. The colliery has always been a safety lamp mine and, in addition to electric cap lamps in general use, flame safety lamps were issued to officials and selected workmen as firedamp detectors; those carried by the former were of the internal relighter type.

The Union Seam

8. The Union Seam which is 171 yards deep at the shafts and the only one worked at the colliery, is from 3 feet 4 inches to 3 feet 9 inches thick with a hard fireclay floor and an immediate roof of medium strong shale. As a result of faulting, the cover at the face of No. 2 District was 242 yards. The seam is gassy and in the recent past there have been three ignitions of firedamp at the colliery. On No. 1 face, now discontinued, there was an ignition during shotfiring on 23rd June, 1960, and another in the undercut, attributed to frictional sparking, on 28th July, 1960. The third ignition, also ascribed to frictional sparking in the undercut, occurred in No. 2 return gate stable on 4th April, 1961. To reduce the risk of ignition in the undercut, the management installed cutting jibs with internal water feed. The cutting machine on the main face line was also fitted with a compressed air/water ejector for ventilating the undercut, but this additional safeguard could not be applied to the machines undercutting in the stables.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z