Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

The Day Before The Explosion

The Afternoon Shift of 21st March

20. On the afternoon shift, the face conveyor was moved over, the waste drawn off, the face and stables drilled, the coal in both stables cut, and the intake gate ripped. J. McKillop, deputy in charge of the district, fired the ripping. in his report for the shift, he noted that there was broken roof in the intake gate stable and his recollection was that the waste behaved quite normally in that, as the supports were withdrawn, it hung for the first 10 yards and then started to cave progressively throughout its full length.

The Night Shift of 21st-22nd March

21. On the night shift, the district was in charge of R. Jackson, a deputy, and the main operations in progress were the cutting and firing of the coal on the main face line and the ripping of the return gate. Work proceeded normally and, in spite of a late start, cutting was completed before the end of the shift, the jib of the machine drawn out of the cut, and the electric cable detached and taken into the return gate. Jackson, who examined the district twice during the shift, observed nothing unusual, but did notice a slight roof break of about 2 to 3 inches throughout most of the face. He last visited the return gate stable soon after 6.30 a.m. and, although the stable had been cut on the previous shift, he found no firedamp there. In his opinion, the ventilation was very strong. He travelled the return gate twice and, on both occasions, observed three empty tubs and two bogies near to the direct rope hauler and attached to the rope. There were a few small roof cavities in this gate, apparently caused by the deterioration of the backing boards, which had allowed roof dirt to fall through.

22. Two shotfirers, R. Latham and R. Hutchinson, started at normal shift time, and a third, R. Ridge, came on an intermediate shift starting after midnight. Each fired 40 shots distributed between the intake gate stable and the main face line; no shots were fired in the return gate stable, although nine holes had already been drilled there. None of the shotfirers found any firedamp during the shift. In addition to the shots in the coal, the deputy himself fired a few in the return gate ripping.

23. To facilitate packing the material from the return gate ripping, G. Rimaldi, who was in charge of the rippers, took down a brattice sheet which had been erected to deflect air into the return gate stable. This sheet was not re-erected because Rimaldi and his team failed to complete the building of the pack. The unpacked ripping debris was retained in the highly inclined gate behind a wooden barrier about 3 feet high. It is worthy of note that Rimaldi confirmed the deputy's statement that there were three or four empty tubs at the head of the return gate.

24. At about 10.15 p.m., J. Feltell, attendant, started up the booster fan and ran it for about an hour. This had no significance in relation to the ventilation of the district; it was merely part of the care and maintenance routine of the fan.

25. Jackson left the return end of the face just after 7.0 a.m. and at about 7.30 a.m. he met J. Halstead, one of the oncoming day shift shotfirers, at the junction of No. 2 return with old No. 1 return. He told Halstead about the holes which were drilled and ready for firing in the return gate stable. At the Deputies Meeting Station at the Cut-back, Jackson discussed the condition of the district with S. Bullen, the oncoming day shift deputy.

The Day Shift of 22nd March

26. The workmen on the day shift reached the face at about 8.0 a.m., some by the return and others by the intake gate. With one exception, none of those who went on to the face from the return gate recalled seeing a brattice sheet in position near the return gate stable. In addition to the deputy in charge of the district, there were on the face two shotfirers, J. Halstead at the return end and K. Clarkson at the intake end; 19 fillers with J. Murray as captain; two conveyor attendants, T. Isherwood at the return end and P. Ince at the intake end; a conveyor maintenance man, J. Allen; and a mechanic of the mine, G. Hartley. In the intake gate, J. Pollard, W. Bradshaw and T. Chapman were working at a floor dinting about 500 yards from the face ripping.

27. Two men, D. Rushton and R. Dunston, were completing the building of the return gate waste side pack with ripping debris left by the previous shift. In the return gate was D. McGoogan, a mechanic, who had been instructed to make an extension piece for the rope of the direct electric hauler. This machine had recently been moved nearer the face and the existing rope was not long enough to reach the return wheel of the endless haulage. Also in the gate were four electricians, G. Pickles, R. Howarth, and P. Tinsley, who were engaged in hanging a new length of armoured cable and extending the signalling system for the newly positioned electric hauler, and J. Barritt, who was responsible for supervising their work and for the routine maintenance of the electrical equipment in the district. According to J. Holden, driver of the endless rope haulage engine, three supplies lads, R. Taylor, J. Cummings and J. Forrest, left the Cut-back early in the shift to collect empty tubs which had been left up No. 2 return gate.

28. The evidence suggests that conditions on the face in the early part of the shift were quite normal. There was no evidence of roof weighting, of floor movement, or of broken coal other than that consistent with the firing of shots on the previous shift. The fillers who gave evidence said that on the face line the ventilation was normal and, indeed, many were wearing jackets and pullovers. With the exception of J. Madden and A. Fisk, to whose evidence I will refer later, none of the fillers heard any shots fired that morning.

29. The colliery records show that flame safety lamps, of the relighter type, had been issued to the deputy and two shotfirers and, of the non-relighter type, to Murray and Fisk. Automatic firedamp detectors had been provided and used at the colliery but were not available on the day of the explosion because some had become defective and all had been sent from the colliery for repair or overhaul.

30. When the day shift overman, H. Lister, reached the intake end of the face at about 9.0 a.m., he found that there had been difficulties with the running of the face conveyor. Apart from a visit to the return gate ripping, where he tested for firedamp, he appears to have been entirely preoccupied with these difficulties. While at the return end of the face, Lister spoke to Halstead, the shotfirer, who, in the course of some jocular conversation, said that he had already made a start by firing three shots. Lister did not go over the conveyor to the face of the stable, but he gained the impression that some of the coal was down because he saw it being turned back into the stable by men who were working there. He left the return end just before 9.45 a.m. to travel down the face.

31. Madden, who was the last filler at the return end of the face line, said that he was told by Rushton and Dunston, as they were passing props to him over the conveyor, that shots were about to be fired and that they were going down the return gate to take shelter. Madden assumed that he was expected to act as sentry and, regarding himself as being in a safe position, continued to pull down some coal. Fisk, who was working with J. Robinson in the return gate stable, said that he did not find firedamp when he tested there at the beginning of the shift. He helped Halstead to stem 'nine or ten shotholes' in the stable and thought that the shotfirer coupled up the leads from two shotholes in series to the shotfiring cable. Fisk went about 50 yards down the return gate to what he regarded as a safe place and he believed Halstead stopped some 10 yards short of this point.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z