Tweet
Table Of Contents
CONDUCT OF THE INQUIRY
GENERAL DESCRIPTION OF THE COLLIERY
No. 2 PIT WORKINGS
Main Roadways
System of Ventilation
The Booster Fan
The Man-riding Haulage
Fire-fighting Equipment
Colliery Telephones
EVENTS ON THE DAY OF THE FIRE
Appearance of Haze
Discovery of the Fire
At the Shafts
The Second Train Journey
Rescues at the Shaft Bottom
At the Fire
Action on the Surface
Rescue Brigade Operations
Later at the Fire
THE BOOSTER FAN
Installation and General Experience
Speeding up the Fan
The Fan Belts
The new belt after speeding up
The belt which caught fire
Mechanics’ Examinations
General Maintenance
Supervision
GENERAL DISCUSSION
The Indication of Danger
The Development of the Fire and Smoke
Rescue
The Provision and Maintenance of Fire-fighting Equipment Underground
WIDER CONSIDERATIONS
Fire Hazards at Fans
Power Transmission Belts Generally
Man-riding Arrangements
Telephone Communications
General Consideration of Fire Hazards by Colliery Managements
Committee of Experts to Review Fire Hazards Generally
CONCLUSIONS
RECOMMENDATIONS
ACKNOWLEDGMENTS
APPENDIX — Names of men killed in the fire
PLAN Nos. 1-5 (in Pocket at back).
Mail:
Webmaster
Back
Home
Contains public sector information licensed under the
Open Government Licence v3.0
.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022
Privacy Policy
Terms & Conditions
Search
Print