No. 2 PIT WORKINGS
Main Roadways
8. Plan No. 1 shows that part of No. 2 Pit workings relevant to the accident. There were two main roads running generally parallel in a southerly direction to the workings in the Main Coal and Coking Coal Seams. The intake airway was used for the haulage of coal in tubs by endless rope and the first 925 yards of the return airway for a man-riding haulage system. Apart from the connections near the pit bottom, there was a crosscut with air separation doors, commonly known as Johnston's Crosscut, some 1,125 yards inbye. Two more crosscuts, each with doors, were provided farther inbye in the vicinity of No. 6 Bench, the branch haulage road leading to the Coking Coal Sections. The return airway from the Coking Coal Sections crossed the main intake airway by an overcast and then joined the main return airway between these connecting crosscuts. The booster fan at which the fire occurred was in the return airway, a little farther outbye.
9. The intake and main haulage road was supported by steel arched girders, twelve feet wide by nine feet high from the pit bottom to Johnston's Crosscut and twelve feet by eight feet from there to No. 6 Bench. The return and manriding road was steel arched also with timber lagging which had not been fire-proofed. The dimensions of the arches in the return were thirteen feet wide by nine feet high for the first 350 yards or so from the pit bottom, ten feet by eight feet for the next 200 yards, eleven feet by nine feet for another 500 yards to the bend in the road just beyond the inbye terminus of the manriding haulage and, finally, an average of twelve feet by eight feet beyond that point.
The System of Ventilation
10. Intake air ventilating the No. 2 Pit workings split at No. 6 Bench to provide separate intakes to the Main Coal and the Coking Coal Sections. The return air from these sections came together at No. 5 Bench and then passed through the booster fan situated about 40 yards outbye at a point some 570 yards from Johnston's Crosscut and about a mile from the pit bottom. The exhausting fan at the surface was electrically driven and produced 160,000 cubic feet per minute at 5.4 to 5.5 inches watergauge. A standby fan had a similar capacity. Plan No. 5 shows monthly air measurements taken over the year to August, 1959, at the points indicated.
The Booster Fan
11. The booster fan, as indicated by sketch plan and elevations in Plan No. 3, was of the double inlet, forward-bladed, centrifugal type with a 45-inch diameter rotor driven by a flat belt. Reference to the manufacturer's catalogue indicates that this type and size of fan is provided with 64 blades. The fan was not fitted with an evasee. The rotor shaft was carried on two white metal bearings, oil ring lubricated and each with an oil capacity of about six pints. The cambered or "crowned" fan pulley was 22½ inches in diameter, 12 inches wide, and overhung the bearing. It was driven at about 540 revolutions per minute by a 100 horse-power, flameproof, slip ring induction motor running at 730 revolutions per minute. The power supply was three-phase, 50-cycle, alternating current at 440 volts. The motor pulley, also "crowned", was 16¾ inches in diameter and 15 inches wide; the pulley centres were 15 feet apart. The fan drive was fenced on the near side with one inch aperture steel wire mesh supported on an angle iron frame secured to a sidewall of the fan house. A timber covering, or "catwalk", made from nine inch by two inch battens was placed over the belt to facilitate access to the nearest fan bearing.
12. The transmission belt was seven-ply and twelve inches wide. It was of a type known as balata belting, made of a folded high tensile cotton duck and balata gum, neither of which is fire-resistant. In the absence of slip the belt speed would have been about 3,200 feet per minute.
13. Plan No. 4 shows the fan in relation to its immediate surroundings. It was situated in a fan house in the main return airway, with the outlet casing mounted in a brick wall built across this roadway and with brick wall fairings to smooth the air flow into the two inlets of the fan. The motor was mounted on three slide rails which afforded a travel of about seven inches for tensioning the belt. The circuit breaker and rotor starter for the motor were in the crosscut adjacent to the motor. A U-tube water-gauge and an automatic indicator of the water gauge, situated near a haulage engine towards the intake end of this crosscut, indicated and recorded the ventilation pressure between the intake and the return airways. Three wooden doors in a by-pass roadway were designed to open automatically by change in ventilation pressure in the event of a fan stoppage.
14. The sides of the roadway inbye of the fan to its junction with the by-pass roadway were mainly of brickwork, and the roof was supported by steel girders. Looking outbye from the fan, the left-hand side of the road was a brick wall to the wiremesh safety fence, the position of which is indicated on Plan No. 4. On the right-hand side of the road, for a distance of about 12 feet from the fan, there was a brick wall six feet high on which some short wooden props were set to support roof girders; for the remainder of the distance to the safety fence, upright girders were used to support the roof girders. The girders on roof and sides were lagged with wood; none of the wood had been fire-proofed.
The Man-riding Haulage
15. The man-riding haulage was an endless under-rope system of modern design in which each car or bogie was attached to the rope by an integral screw clip. The train comprised four bogies, each seating 12 men in three compartments having seats for four, two facing each way. The electrically driven engine, housed in the return airway, was provided with protection against over-running at each end of the haulage and against excessive speed; the position of the bogies throughout the journey was shown on an indicator and, at each end, by a warning stop light.
Fire-fighting Equipment
16. The positions of the water mains, valves, hydrants and other fire-fighting equipment in the vicinity of the booster fan in the return road as described by witnesses are recorded on Plan No. 2. Fire hoses were kept only on the surface.
Colliery Telephones
17. The main telephone switchboard was in the lamp room on the surface, with lines to telephones in the colliery office, the engineer's surface workshop, the winding engine rooms, the pithead and down the shafts. The line from the surface to the upcast pit bottom terminated at a small switchboard, in a pump-house connected to instruments at Johnston's Crosscut, No. 6 Bench and various other points farther inbye. Conversations between any two points could be overheard on instruments situated elsewhere. There was no telephone communication on the man-riding haulage system.