Tweet
Table of Contents
Introductory
I.
Description Of The Colliery
General
Management
Seams worked and lamps used
The Six Feet Seam
II.
The Panzer Face
Method of work and organisation
Support and control of the roof
Ventilation and the occurrence of firedamp
The morning shift on 13th January
III.
Narrative Of The Explosion And Subsequent Events
The first explosion
The second explosion
The sealing of the district
The re-opening of the district on 22nd January
The investigation after re-opening
IV.
The Cause Of The Explosion
The igniting medium
The explosive mixture of methane and air
V.
Matters Arising From The Explosion
Frictional sparking from light-alloy roof bars
Firedamp detectors
Firedamp in wastes behind longwall faces
VI.
First Aid And Subsequent Treatment Of The Injured Persons
VII.
Recommendations
VIII.
Acknowledgments
Appendix — List Of Casualties
Plans:
No. 1 — System Of Ventilation In Six Feet Seam
No. 2 — Position Of Men In And About The Panzer Face At The Time Of The Explosion
Mail:
Webmaster
Back
Home
Contains public sector information licensed under the
Open Government Licence v3.0
.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022
Privacy Policy
Terms & Conditions
Search
Print