Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

II. — The Panzer Face

This was a single-unit conveyor face, about 120 yards long, advancing to the rise at half-course to the full rise of 1 in 12, with the intake loading gate at the right end and the return supply gate at the left. The ventilation was ascensional. Roof rippings were taken in both gates which were supported with steel arches and roadside packs. The gates had been driven narrow for the first 50 yards so as to leave a pillar of coal for the protection of the road leading to the main development face. The Panzer Face started as a normal production unit in December, 1952. It had advanced about 190 yards up to the time of the explosion.

Method of Work and Organisation

The face was equipped with an armoured scraper-chain conveyor on which was mounted a coal-cutting machine fitted with two jibs. The lower jib made a horizontal cut to a depth of about 3 feet, some 15 inches above floor level, and the upper jib was curved upwards so as to make a vertical shear at the back of a horizontal cut of similar depth about 2 feet 9 inches above the floor. Explosives were never used in the coal or in the supply gate rippings and only occasionally in the loading gate rippings. All machinery was driven by compressed-air.

The face was worked on three shifts and the normal advance was one cut every 24 hours. The coal, which fell freely behind the cutting machine, had to be filled away as cutting proceeded and the conveyor had to be snaked forward so that the permanent roof supports could be advanced as soon as practicable after filling had been completed on any part of the face. Conditions were thus nearer to a system of continuous mining than to a set cycle of operations, but the work usually proceeding on each of the three shifts was as follows —

Morning Shift
  7.0 a.m. to 2.30 p.m.  Coal cutting and filling. Moving forward conveyor. Strip packing.
Afternoon Shift
  3.0 p.m. to 10.30 p.m.  Ripping of gates and advancing roadside packs. Withdrawal of supports from wastes.
Night Shift
  11.0 p.m. to 6.30 a.m.  As on morning shift plus water infusion of face.

For the suppression of airborne dust, the face was infused once every 24 hours, all cutting was done wet, and water sprays were used at transfer and loading points in the loading gate. These measures were effective.

There was a deputy in charge of each shift. Except at week-ends, each deputy made the pre-shift inspection for the succeeding shift. An overman was regularly employed on this face on the morning shift.

Support and Control of the Roof

Due to the type of machinery used on this face, the roof was supported on the prop-free front method. The roof supports consisted of hydraulic steel props supporting Schloms light alloy roofing bars linked together in lines at right angles to the face and set at intervals of 2 feet. The length of the bars corresponded to the depth of the cut and a fresh bar was added to each line as filling proceeded. Each fresh bar, acting as a cantilever, was held rigid by means of the steel wedge provided for driving into a slot at the linked ends of the bars until such time as a prop could be set beneath it. The management's instructions were that these wedges were to be withdrawn as soon as the prop was set, but the evidence suggests that the wedges were usually left in position until the bars were being withdrawn at the waste edge.

Considerable trouble had been experienced due to props sinking into the soft floor under comparatively light loads. In an endeavour to overcome this difficulty, all props were fitted with welded bases one foot square. This reduced the trouble but did not altogether eliminate it.

Strip packs, 6 to 7 yards wide, were built with the stone falling in wastes 5 to 9 yards wide between them. The packs, including the gateside packs, and the wastes were numbered consecutively from right to left; there were nine packs and eight wastes. A row of chocks consisting of steel girders and wood blocks built on steel frame bases was maintained along the edge of each waste.

When the face first started, the depth of cut was about 4 feet and the Schlom bars used were the same length. In November, 1953, the depth of cut was reduced to about 3 feet and a supply of Schlom bars of this length was obtained from another colliery where they were no longer required. These were the bars in use when the explosion occurred.

Ventilation and the Occurrence of Firedamp

The face was ventilated by a current of approximately 19,000 cubic feet per minute of fresh intake air which afterwards ventilated the development face, standing at a fault, before returning to the upcast shaft. The seam is known to be gassy but, according to the deputies' reports and the results of air samples taken by the management, it would appear that the only place where inflammable gas was at all troublesome was in the supply gate at the return end of the face. According to the evidence of deputies and other officials, an issue of methane could frequently be detected at the top of the ripping lip in this gate, but by means of a hurdle sheet this could usually be diluted to about one per cent. at the point of issue; it was only on rare occasions that methane was detected at the edges of the wastes and it could always be cleared by the erection of brattice sheets so as to deflect the face air current towards the waste.

With a view to reducing the quantity of methane issuing into the air current, a system of methane drainage from the strata by means of long holes drilled from the return gate into the roof strata overlying the goaf had been started but was not in full operation up to the time of the explosion.

The Morning Shift on 13th January

The morning shift on 13th January commenced at the usual time and work proceeded normally for the first two hours or so.

The cutting of the face from right to left had been commenced during the preceding night shift and was continued. Eighteen men were filling the cut coal and extending the lines of roof bars. Twelve packers were advancing the packs, and four waste repairers were moving forward the chocks at the edges of wastes Nos. 6 and 8. Two repairers were at the rippings in the supply gate. Two men were engaged with the boring machine for methane drainage at a point in this gate some 45 yards from the face, and two other men in this gate were dealing with supplies for the face. The regular morning shift deputy, H. Williams, was in charge, and overman G. Thomas and strata control officer R. Hill were on the face.

Difficulty had been experienced in determining the most suitable width for some of the wastes, particularly near the return end of the face; if the wastes were not wide enough the roof did not cave regularly, and if too wide the props at the waste edge were forced into the soft floor so as to make withdrawal difficult. For some days before the 13th January, great difficulty had been experienced in withdrawing supports at No. 8 waste, with the result that the waste edge was two tracks behind and No. 8 pack was also behind due to lack of packing material. On the morning of the 13th, a roof weighting had occurred on the face in the vicinity of No. 6 pack and was being dealt with by the erection of additional supports. There were also signs of roof weighting at the ripping lip in the supply gate and additional supports were being set. In all other respects conditions on the face appeared to be normal.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z