Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mine & Quarry Engineering - Main Index
Mine & Quarry Engineering - Subject Index
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
October, 1954

Electric rotary drilling in anhydrite

In keeping with the I.C.I. policy of improving efficiency throughout every department of its many works and divisions, the anhydrite mine at Billingham, near Stockton-on-Tees, County Durham, has implemented in recent years a large modernisation scheme affecting all aspects of its underground operations. A full description of the mine and the machines employed in both the old and new mining areas was recently given in this journal in a series of three articles.* It will be recalled that a pillar-and-stall method of mining the 15-20 ft. main anhydrite seam is employed. In the old-type mining panels column mounted pneumatic drifters, scraper-loaders and tub haulage are used but this equipment is being replaced in the new-type working areas by trackless mining machines. Basically, these comprise diesel haulage trucks, Joy loaders and, at the present time, an assortment of various improvised and temporary drill carriages mounting percussive drifters.

For many years, research has been proceeding with drilling techniques, and the advantages of electric rotary methods over percussive indicated at an early stage that the method should be finally adopted for production drilling. Apart from the more obvious economic advantages that would be obtained by the employment of this type of drilling, two of the reasons affecting this decision were :—

(a) The dust problem. Much of the dust created by dry drilling with percussive machines would be eliminated by rotary drills as they tend to produce a greater percentage of chippings. Due to the after-treatment in the chemical works, the mined anhydrite has to be kept completely dry, with the consequence that no water-flushing can be permitted in the drilling operation ; the dust, although in no way injurious to the lungs, does tend to create unpleasant working atmospheres at the face, and the introduction of rotary drills would contribute greatly to a considerable improvement in conditions for the drill operators.

(b) Electric power. The mine is responsible for providing compressed air from the two surface air stations not only for its own operations but also for the whole of the surface factory area. Any saving underground would allow a larger proportion to be available for the chemical and fertiliser works.

Development

One requirement visualised for the underground modernisation programme was the introduction of electric rotary drilling equipment capable of drilling 10 ft. long 1 in. dia. shotholes at any position in a face averaging 24 ft. wide and 18 ft. high at a rate in excess of 3,000 ft. per shift.

This objective intensified previous efforts devoted to the development of electric rotary drilling and culminated in the delivery of a 3½ h.p. electric rotary drill which was a scaled-up version of the Jeffrey A6 coal drill employing the conventional manually operated saucer clamp mounting. Experience with this drill in 1949 confirmed that the previously developed bits, rods, feeds and speeds could successfully drill anhydrite, but it also showed that the drill was not suitable for production use at Billingham Mine, due to the following limitations (a) the exposed drill rod and feed screw constituted a danger to the operator, (b) considerable manual effort to position was required, (c) it could not start a hole unaided, and (d) rod changes were required in drilling a 10 ft. hole. These limitations were overcome in an experimental mock-up drill which successfully self started and drilled 10 ft. holes without rod changes and which was completely safe to operate. Having thus established the design data necessary for a drill which could be remotely controlled, attention was devoted to the type of mounting which could make use of this potentially productive drill. It cannot be too strongly emphasised that the development of the entire drilling equipment was conditional on the establishment of this design data, later embodied in the TSD drill.

These experiments culminated at the time of the 1949 Earls Court Mining Exhibition, where discussion with drilling machinery manufacturers showed that no drill was available or projected which was basically different from the scaled-up Jeffrey drill. The Exhibition did, however, inspire a solution to the drill mounting problem in that the prototype Hardypick 5 h.p. drifter rig mounting exhibited, though quite unsuitable for production use at Billingham, was capable of being developed in accordance with the mine's ideas for multi-drill operation by one driller. Efficiency studies were carried out on the Hardypick drifter rig and the results obtained enabled the various factors affecting drilling economics to be surveyed. This was later published** in three articles in our associated journal, Colliery Engineering, under the title "Economics of Electric Rotary Drilling."

A specification covering a crawler-tracked twin-jib carriage was compiled and early in 1950 Hardypick Limited agreed to manufacture a prototype which was completed in January 1952. Initial trials with the carriage (mounting adapted Hardypick 5 h.p. drifter drills) were undertaken in a quarry near Hathersage and the carriage delivered to Billingham in June 1952 to await suitable drills.

Drills were not ordered when the carriage order was placed as the exact penetration rate and bit speed to be used awaited the results of further experimental drilling work in the mine. It was not until November 1951 that the specification of the TSD drill was compiled and Hardypick instructed to proceed with manufacture. In view of the urgent necessity for completing a workable drill, a conservative compromise specification was adopted which made use of the well-tried feed nut and screw feed mechanism and which, of course, incorporated the Billingham-developed self-starting, long-feed principles. The ideal drill was left for the later development which is at present in hand.

The first TSD.1 type drill was delivered in August 1952 but, for various reasons, was without automatic control gear. It was, however, fitted with the basic elements of the "feeler ram" pre-load system necessary for the successful drilling of anhydrite. It should be mentioned, at this point, that the conventional electric rotary drill of the Hardypick drifter type relies on the considerable flexibility of the drill rod to avoid the ill effects of mal-alignment of the drill feed mechanism and the hole line occasioned by the drilling thrust exerted. The self-starting drill principle developed in the mine substantially precluded the use of drill rod flexibility as a means for accommodating mal-alignment of hole and feed mechanism. It will be appreciated that the design of an 18 ft. cantilever jib, capable of sustaining without deflection drill thrusts of the order of 1 ton and more, and incorporating at least 5 separate bearing surfaces with working clearances, was a virtual impossibility. The effect of such deflection, particularly when coupled with the chassis movement and a second drill mounting, received careful consideration when the specification was compiled. Simulated drill thrust loading tests undertaken on completion of the carriage confirmed the need for eliminating these deflection effects. The initial equipment devised to solve the problem was not successful, but was capable of development to the present successful system.

Development of carriage and drill proceeded in 1952 and the requirements of the automatic control system determined. The modifications required to complete No. 2 drill were put in hand at the end of 1952 and the complete drill delivered in February 1954. Meantime, development work had shown that drilling with two drills could successfully be undertaken on the tracked chassis and there were indications that the more desirable pneumatic-tyred chassis might make a suitable mounting. As the mine was standardising for its underground haulage fleet on the A.E.C. Mammoth Major chassis (with a special low and wide body), there could be many maintenance advantages if the same chassis could be used as a drilling carriage. The transfer was completed in December 1953 and successful drilling carried out with one drill. On receipt of the second drill, further drilling experiments were put in hand which showed that drilling with two drills using thrusts up to 3,000 lb. per drill could be carried out without the use of stabilising chassis jacks.

We were recently invited to the mine to see a demonstration underground of this prototype carriage one of the two drills fitted has yet to be modified to the full standard before the equipment is put into production use later in the year. The transfer of the drilling equipment designed for use on a wide, low, tracked chassis on to a relatively high, narrow, tyred chassis has increased the overall height by 18 in. over that which will be standard for future carriages. The existing carriage can be operated entirely by one man and can drill holes anywhere on a 24 ft. wide 18 ft. high face from one setting of the chassis. Horizontal holes at up to 22 ft. in height can be drilled. When starting off X-cuts, the first rounds can be drilled off by operating the drills approximately at 90 deg. to the jibs.

The titleblock shows No. 1 drill putting in a top hole whilst No. 2 drill is seen drilling a lower hole. The operation of manoeuvring the drill into the required position is controlled from the portable switch box held by the operator. This allows the operator to observe and control the alignment of the drill from the most advantageous position. The time taken to move any one drill from hole to hole averages, over the whole face, a minimum of 18 seconds, dependent on the skill of the operator. Fig. 2 shows the complete set of controls necessary for positioning and operating the drills. The portable push-button box, seen on the left of the illustration is carried by the driller when positioning the drill it is on a trailing cable which may be plugged in to control either drill mounting as required. Ten push-buttons are employed for controlling the five positioning motions, these being the turntable rotation, jib elevation, jib-rolling action, jib-extension and drill frame elevation. There is also a master on-off switch which isolates all buttons to prevent accidental operation.

To the right in Fig. 2 may be seen the drill control box, permanently mounted on the vehicle chassis it contains duplicate controls, one to each drill. Having positioned the drill, the operator selects the desired hole length to be drilled and presses the "feed" button. No further action is normally required as the drill automatically pre-loads the jib, drills the selected length of hole, and retracts on completion of drilling in readiness for being repositioned for the next hole. Should the driller wish to retract the drill whilst drilling, the "non auto retract" button is pressed. The red light near the top of the box lights when the drill bit requires changing. The arrowed switch controls all electrical supply to the drill control circuits and acts as the drill motor starter.

Drill carriage

The design specification for the type DC.1 drill carriage was compiled towards the end of 1949 after development work had shown the feasibility of constructing a self-starting drill capable of drilling a 10 ft. hole without rod changes. The main points in the specification were :— (a) the carriage had to mount two drills each capable of exerting a 1 ton maximum drill thrust, (b) carriage and drills had to be suitable for operation by one man, (c) all holes on a 24 ft. wide 18 ft. high face should be accessible from one position of the carriage, (d) the carriage was to be capable of drilling holes parallel to the floor at a maximum height of 22 ft., (e) the carriage was to be diesel-driven, mounted on crawler tracks and have adequate manoeuvrability for travelling in 18 to 24 ft. wide drifts of 13 ft. minimum height, (f) the carriage had to operate on average gradients of 1 in 19 and maximum grades of 1 in 8, and (g) drilling operations were to be powered optionally either from a trailing cable supply or from a diesel-generator set on the carriage.

As completed and first used underground the carriage was in accordance with the above specification. Due to geological difficulties which arose after delivery of the carriage it was found necessary to revise the specification to suit 1 in 4 gradient operation. As mentioned before, the drilling equipment is now mounted on a tyred chassis and one drill mounting is being converted for operation on this steeper gradient.

The chassis is a 3-axle A.E.C. Mammoth Major type 3671 K, 8 ft. wide model with a wheelbase of 11 ft. 8½ in. It has a fully articulated rear bogie with drive to both axles and the rear springs have been replaced by solid balance beams. The 5-speed gear box in conjunction with a 10 1/3 : 1 differential and 11.00 x 20 x 14-ply tyres gives a maximum road speed of 21 m.p.h. at a gross loading of 24 tons. In use speeds are limited to a maximum of 10 m.p.h. An A.E.C. 11.3 litre D.I. diesel engine is fitted, downrated from 150 b.h.p. to 100 b.h.p. at 1,800 r.p.m. in order to ensure that the neat diesel exhaust does not contain greater than 1,000 parts per million of oxides of nitrogen or 2,000 parts per million of carbon monoxide under full load conditions. With the exception of the solid balance beams the chassis is identical with the A.E.C. trucks used for stone haulage from the working faces to the underground crusher station. Power assisted steering will be fitted later in the year. The turning circle, as measured at the outer front wheel, is approximately 50 ft. dia. and provides adequate manoeuvrability. Tests have verified that the fully loaded chassis has ample power and adhesion for negotiating normally-surfaced 1 in 4 gradients. A sub-chassis consisting of suitably braced 9 in. 3 in. channels and bolted to the A.E.C. chassis members carries the drilling equipment. The main electrical control box housing the supply cable switch and transformer and rectifier for the 25 volt d.c. lighting and control circuits is mounted on the sub-chassis. This control box also houses the voltage regulator, instruments and control gear associated with the 400 V, 3 phase, 40 cycle 20 kVA alternator which was originally fitted when the carriage was on tracks.

The drilling equipment proper is mounted on a 10 ft. 10 in. x 5 ft. 4 in. soleplate which is suitably stiffened underneath and bolted to the sub-chassis. Two turntables are mounted on this soleplate. Each turntable comprises a in. thick 5 ft. 4 in. dia. top-plate to which are bolted 10 roller assemblies. The rollers are tapered in outline to ensure a true rolling action in the track ring which is welded to the soleplate. The track ring is formed by rolling a 6 in. x 3½ in. channel and finally machining the insides of the channel to the required taper. The rollers only take loadings due to tilting moments on the turntable and a plain, large diameter, white metalled centre post bearing locates the turntable and takes direct radial thrust loadings. The turntable is powered by an arrangement of two single-acting rams of 4¾ in. dia. which, in conjunction with a chain and sprockets, impart 220 deg. of rotation to the turntable. As the rams are hydraulically locked when not in use they also act as a brake, preventing rotation of the turntable under drilling loads. The man turntable brake is an internal expanding type in which the two (moving) Ferodo-lined brake shoes are pressed against a stationary brake drum attached to the inner diameter of the turntable track ring. The brake is applied by means of a leaf spring which is pre-loaded to apply the brake through a lever and cam system. The brake is automatically released by a hydraulic ram whenever the turntable operation is selected. This system was arranged in accordance with the general design principle that failure of power of any kind (hydraulic or electric) should result in "failure to safety," i.e. turntable locked in position.

The main jib plain bearings are carried on suitably gusseted plates welded to the turntable top plate. Also mounted on the turntable either in cabinets or as separate items are (a) the complete electro-hydraulic system (b) drill motor contactor (c) jib roll motor contactor. The jib trunnions are formed from massive steel castings to the underside of which are pivotally attached twin 4¾ in. dia. rams, their bases being pinned to the turntable top plate. These rams are double-acting, are used to raise the jib through approximately 90 deg. and are also hydraulically locked when not in use, in order to resist the tendency of jib movement from the drilling thrust. Four bronze bearings are housed within these castings and support a 6 in. dia., thick walled, 3 per cent, chromium jib centre tube which forms the base of the jib. A 2 h.p. jib rolling motor mounted on the trunnion casting drives through epicyclic gearing, chain reduction gear and finally an irreversible worm reduction gear to the worm wheel mounted on the jib centre tube. The final rotational speed imparted to the jib is r.p.m.

The jib centre tube is extended forward through the trunnion castings and carries two welded-on cast steel spiders to which the jib is bolted. The jib is telescopic and largely fabricated from aluminium sections by riveting. Each jib is in halves so that the drill may nest inside the jib for drilling holes on the jib centre line. Rectangular section steel wearing strips are bolted to the top and bottom sides of each front half jib. These wearing strips engage bronze support bearings in the main jib and thus ensure that the main jib structure is not subject to wear. The main jib is secured to the jib centre tube by steel cover straps and bolts. Each half-jib houses a 2 in. dia. double acting ram which serves to extend and contract the jib and which may be hydraulically locked to resist drilling thrust. The drill trunnion bearing block is bolted to the end of the front jib and extended side plates are used to carry the twin 2 in. dia. drill trunnion rams.

The system used for controlling the various motions required in positioning the drill may best be described by considering a single motion as a double-acting hydraulic ram. Each port of the ram is connected via a restrictor valve to a pressure port on a 3-position hydraulic valve. The restrictor valves are operative as restrictors only to oil leaving the appropriate ram port and do not in any way interfere with flow into the ram. The restrictors serve the purpose of limiting the maximum speed of operation of the ram under varying load conditions. Each restrictor is set to pass only a given portion of the total output of the hydraulic pump so that the remaining portion may be used to operate other rams simultaneously. The portioning of oil to each ram operated motion is allocated on the basis of ensuring that, when the drill is moved from one hole to the next, the simultaneous operation of the necessary motions will terminate at about the same moment. The 3-position hydraulic valve is operated by two 25 volt d.c. solenoids with a spring centre position which hydraulically locks the ram. By operation of either solenoid, pressure oil is directed to the appropriate side of the ram whilst the other side discharges oil back through the valve to the tank. Relays operating at 25 V are used to control the solenoid supply and these relays are controlled from push buttons in the control box carried by the operator. In order to prevent accidental selection of jib movement all 25 V control circuits are supplied only through operation of the switch controlling the hydraulic pump motor.

Though the "feeler rams" are mounted on the drill they are essentially part of the jib. Their function is to prevent movement of the drill trunnion mounting whilst drilling, in order to prevent the drill rod from binding in the hole and to hold the front drill rod guide immovable to ensure that the hole is started without difficulty. This is effected essentially by attaching two rams to the end of the jib. The pistons are pumped out against the face before drilling commences and thus pre-load the jib to approximately 1 1/3 tons, which is somewhat in excess of the maximum permissible bit pressure. This pre-load takes up all bearing clearances which, together with deflection of the cantilever jib, results in a jib end movement of several inches in extreme cases. In effect the rams are then hydraulically locked and drilling started. Since the drill thrust is transmitted directly back to the trunnion mounting on the front jib it tends to further deflect the jib. This, however, cannot take place since each 1,000 lb. of drill thrust merely reduces the pressure in the feeler rams by the equivalent of the 1,000 lb. thrust and the jib remains in its original pre-loaded position under The original 1 1/3 tons pre-load. In practice, due to slight leakages in the hydraulic system of the jib and indentation of the face under the feeler rams, the feeler ram pressure reduces more rapidly than the increase in drilling pressure and it is found necessary to ensure that the feeler ram pressure does not fall below the equivalent of a 1/3 ton thrust by maintaining this pressure by pumping oil into them. It may be stated that drilling may also be carried out by both pre-loading at 1/3 ton and maintaining this pressure in the system. The different rod wear effects resulting from these different feeler ram systems have not yet been studied to determine the most suitable one.

Drill

The drawings reproduced as Fig. 7 show an elevation of the front and rear of the drill and frame. The parts are numbered to facilitate following the description which is given of the drill and its operation. The Hardypick electric rotary anhydrite drill type TSD-2 is powered by a totally-enclosed fan-cooled electric motor (1) using a Higgs type 190.G rotor-stator unit. The motor is continuously rated to give 5 b.h.p. at 2,400 r.p.m. on a 3-phase 400 V 40 cycles supply, and is foot-mounted to the underside of the drill frame. The rotor shaft is extended rearwards to drive a Plessey type 2H19 hydraulic pump (2), through a Dunlop Special Products flexible coupling (3). The rotor shaft front extension engages a two-stage epicyclic reduction gearbox (4), flange mounted to the motor casing and giving a ratio of 26 :1. The epicyclic gearbox output shaft carries a 22-tooth Renold duplex chain sprocket (5), which transfers the drive via a 5/8 in. pitch duplex chain (6) to a 14tooth sprocket (7) splined to the end of the lower feed screw (8). The upper feed screw (9) is driven at the same speed by means of the gear train (10, 11, 12) and rotates at approximately 140 r.p.m. The spur gears (10 and 12) are splined to their respective feed screws and extended to form the inner races for the Salter roller bearings (13), which support the feed screws in the rear light-alloy casing (14). The idler gear (11) is carried on a Salter roller bearing (15), which, in turn, is carried on a plug screwed into the rear casing (14) that is secured to the drill frame (51) by countersunk set screws (16).

The front casing (17) is of light alloy and carries the Timken taper-roller bearings (18), which sustain the front ends of the feed screws (8 and 9). These bearings locate the feed screws axially and take all thrust loadings resulting from drilling or retraction. The feed screws are manufactured from 1 3/8 in. o.d. thick-walled tubing and are cut with a 1 in. pitch single-start left-handed acme thread of 12 ft. 8 5/8 in. length and two diametrically opposite keyways 12 ft. 2 5/16 in. long. The feed screws pass through the travelling head gearbox which is housed in a light alloy casing (19) split in halves longitudinally. The sleeve gears (20) are keyed to their respective feed screws so that they rotate at the same speed as the feed screws but are free to slide along them. Both gears (20) mesh with a single drive shaft gear (21), which extends forward through the gearbox casing (19) to receive the splines on the drill chuck (22). The drive shaft gear (21) extends rearwards to terminate in a dog clutch cut on the end face and is counter bored to carry the clutch shaft (23) in a plain bearing bush (24).

A dog clutch (25) is keyed to the clutch shaft (23) and has a gear formed on it which meshes with the feed nuts (26), which engage the screw threads on the feed screws (8 and 9). When the clutch shaft (23) is held forward in the position shown in Fig. 7, the drive shaft gear (21) drives the dog clutch (25), which in turn drives the feed nuts (26). With the feed screw rotating at 140 r.p.m. the gear train (20, 21, 25 and 26) gives a rotational speed of 153.5 r.p.m. to the feed nuts. Since the feed screws are rotating at 140 r.p.m. there must be a relative motion between them and the feed nuts of 13½ r.p.m. and this, coupled with the 1 in. pitch left-handed screw gives, a forward motion of 13½ in. per min. to the travelling head gearbox whilst the drill is penetrating.

When the dog clutch (25) is withdrawn fully rearward it engages the stationary clutch retraction dogs (27), which are keyed into the gearbox casing (19). When thus withdrawn the dog clutch (25) and its meshing feed nuts (26) are held stationary. The relative motion between feed nuts and feed screws is now 140 r.p.m. giving a rearward motion of 140 in. per min. whilst the drill is retracting. There is an intermediate position of the dog clutch (25) in which it engages neither the drive shaft gear dogs nor retraction dogs. This position is only obtainable when the travelling drill head retracts fully so that the clutch striker (28A) hits the rear stop (29) and in doing so throws the clutch member (25) into neutral feed in which position it is maintained.

Clutch operation is normally effected through operation of the clutch operating lever (30). This lever is pivoted about a pivot point (31) attached to the travelling head casing (19) and its upper end engages the clutch operating casing (32) on its centre line. The lower end of the lever engages a slotted block (33) which is attached to an 8 mm. pitch chain (34). This chain is endless, running around the rear sprocket (35) and forward sprocket (36). By pulling the chain (34) in the appropriate direction the clutch lever (30) can be operated to select either forward or reverse travel of the drill head. The chain pull is obtained by momentarily energising the reversible Lucas electric starter type clutch motor (37) which drives through a reduction gear (38) on to chain sprocket (36). Whilst the drill head is travelling the clutch is idled in the de-energised position. The clutch lever (30) is pivoted in such a manner that the chain drag tends to maintain the clutch in the selected position.

A number of Londex type QO switches are attached to the drill frame in such a manner that the travelling drill head casing closes them in passing and in so doing a selected one operates the clutch motor and causes the drill to retract after drilling a pre-selected length of hole. Hole lengths varying in 6 in. from 8 ft. to 10 ft. may be pre-selected. In the event of failure of the Londex switches the drill is retracted after 10 ft. of drilling by a fixed stop attached to the drill frame which bears against the clutch lever and throws it into retraction.

The drilling thrust is obtained by the thrust developed between feed nuts (26) and feed screws (8) and (9) being transmitted through the Timken roller bearings (28) to the casing (19) and back to the drive shaft (21) and thus the drill chuck (22) through Timken taper roller bearings (39). It should be noted that, by virtue of the duplication of feed nuts and feed screws, the drilling thrust on the travelling drill head is entirely resisted by the feed screws and hence the travelling drill head may be supported in guide rails (40) which carry only the weight of the drill head. This duplication of feed nuts and associated gear was deliberately adopted despite certain operational limitations in order to eliminate possible ill effects which could result from a single feed nut drill of this type in which the drill thrusts (of up to 3,000 lb.) have to be resisted as a bending moment imposed on the guide rails.

The drill rod is supported at the front end by a close fitting sleeve (41) which is carried in bearings (42) and (43) in turn carried in the cast steel casing (44), the assembly being termed the front rod guide. When the drill is in the fully retracted position the drill bit is withdrawn just inside the front rod guide. When drilling starts the guide is in close proximity to the face and by virtue of the immovable mounting provided by the drill carriage the drill bit is forced to start to drill no matter how unfavourable the face presented. Any contact between drill rod and sleeve (41) causes the latter to rotate at the drill rod speed. In consequence the relative motion between the two is a forward motion of the drill rod of 13½ in. per min. which largely eliminates wear on the drill rod due to the high side loadings often present when drilling commences. The development of this front-guide feature in the Billingham Mine in 1949 was the single fundamental development which had to be made before it was possible to proceed with design and manufacture of the DC.1 twin jib drill carriage and associated drills.

In view of the extreme flexibility of 1 3/8 in. dia. drill steels it is necessary to provide an intermediate rod guide (45) in order to prevent bowing of the long steel. The guide (45) is bolted to a carrier (46) which is supported in the guide rails (40). The carrier also supports the feed screws (8) and (9) in bronze bushes (47). Four in. dia. rods (48) are attached to the carrier (46) and extended rearwards to pass outside the travelling drill head and connect to the rear guide carrier (49). This carrier is supported in the guide rails (40) and also supports the feed screws (8) and (9) in bronze bushes (50). With the rear-guide carrier (49) in the position shown in Fig. 7 the intermediate rod guide is approximately 5 ft. ahead of the chuck (22). In the fully retracted position a spring clip holds the rear-guide carrier against the travelling head (19) and maintains this position until 5 ft. of drilling has taken place when the spring clip releases the carrier and the intermediate and rear guides remain stationary during the second 5 ft. of drilling. The reverse sequence takes place on retraction except in so far as the spring clip re-engages the rear guide carrier in the fully retracted position. By virtue of the rod guide features incorporated in the drill, the drill rod and feed screws can be totally guarded in the form of the drill frame and thus prevent the type of accident associated with the conventional drill and its exposed rotating parts.

The drill frame is based on 2 in. x 2 in. x in. angle members (51), which form the four corners of the frame and carry the front and rear casings at their ends. These angles are tied together at approximate 20 in. intervals by 2 in. wide aluminium alloy bulkheads (52), which give the frame the necessary torsional stiffness. The frame sides are given further stiffness by welding small 1 in. x 1 in. angles (53) in X formation between pairs of bulkheads. The frame top is in. plate lightened by holes along its length, while the frame bottom is also of in. plate to which the various auxiliaries are attached. Near the centre of the frame a ¼ in. plate box section reinforcement is used which carries the drill trunnions. This box section also provides the base attachment for the feeler rams which are supported in straps secured to the frame at their forward ends.

The "feeler ram" piston rods are extended by renewable tubes through support bearings attached to the front casing and at their front ends carry special ends which are pressed against the face during drilling.

From the description given above, it will be noted that the drill is designed to operate at a constant penetration rate, as distinct from a constant drilling pressure. This decision resulted from the original research carried out in connection with the economics of rotary drilling, and further experience may ascertain that the drill operation should be based on a constant drilling pressure irrespective of penetration rate. At present bits are removed for regrinding when a drilling thrust of one ton is required. The character of the anhydrite being drilled has been found to differ greatly from hole to hole, figures of 10 ft. and 150 ft. per bit regrind having been encountered in areas only 3 ft. apart. The penetration rate used is determined largely by considerations of obtaining the lowest overall cost per foot and is nowhere near the fastest possible penetration rate. A limiting factor in determining the economic penetration rate is the frequency with which the driller has to change bits on the two drills he is operating. Further research is at present being directed into the question of bits which are of the tungsten-carbide type M supplied by Victor Products (Wallsend) Limited.

When electric rotary drill carriages of this type are put into production use in the near future and the pneumatic percussive machines now employed in both the old and new mining panels withdrawn from service, great improvements in the overall drilling efficiency at Billingham will result.

Acknowledgments

We would like to express our appreciation to Imperial Chemical Industries Limited for arranging the visit to the Billingham Mine and the demonstration of this drill carriage. We would like particularly to thank Mr. G. Eland Stewart, the Mine Agent and Manager, and Mr. K. N. Emmott, who was largely responsible for its design and development.

* "The Billingham Mine," Mine And Quarry Engineering, p.432, December 1953, p. 2, January 1954, and p. 66, February 1954.

** "Economics of Electric Rotary Drilling," by K. N. Emmott, B.Sc., Colliery Engineering, p. 531, December 1952, p. 22, January 1953. and p. 61. February 1953.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print