February, 1954 The Billingham Mine - Part 3The description of this anhydrite mine, is concluded with references to the underground crushing station and workshops, safety and ventilation services, and the surface equipment and mill.A view is shown in Fig. 29 of a truck dumping at the crusher station. Vehicles enter the station and stop with the rear of the body clear of the chute cover, which is then raised by pneumatic lifts operated by remote controls conveniently placed on either side for drivers of both left-hand and right-hand drive lorries. After dumping the broken anhydrite into the bin, the cover is dropped and the truck moves off back to the face; when observed, the whole operation from entering to leaving this station took approximately one minute for a 14-ton load. A check on careless driving is maintained by a very simple and effective means; the guide into the crusher dump is marked out by steel curbs, and these are kept coated with a red oxide paint. Thus a vehicle with red smears on a wheel gives the supervision an indication of poor driving when entering the crusher. The layout of the crusher and bin arrangement may be seen in the diagram at Fig. 31. Stone from the trucks falls into a 500-ton bunker from which it is drawn by a Ross chain feeder to a live roll grizzly and fed into a 36 in. x 24 in. primary jaw crusher. These items of plant were supplied by Edgar Allen and Co. Ltd. The feeder and grizzly are both powered by 15 h.p. electric motors driving through Radicon gearboxes and the crusher, which has a 125 h.p. motor, is fitted with water cooled bearings. In order to prevent uncontrolled runs of stone through the chain feeder, the bunker is never pulled empty and 50 tons is always left remaining at crusher shut-downs. A view of the crusher station as seen from the top platform, is given in Fig. 32, opposite. A dust-control system maintains good conditions at both truck dump and crusher. From points immediately below these locations, 42,000 cu. ft. of air per min. is drawn by means of a 48-in, diameter ventilation conduit and a 48-in. Jeffrey axial-flow fan driven by a V-belt drive from a 40 h.p. motor. Delivery of the dust-laden air is made behind a brick wall stopping into disused workings. By these means, downcast air is provided at both these dusty locations, and good conditions maintained. Both truck dump and crusher are very adequately illuminated, both strip and prismatic wall lights being used to effect. A 5-ton electric Ardicar travelling crane mounted on a Patterson Hughes rail carriage and spanning the truck dump is used for any necessary maintenance in the crushing station. In passing, it might be noted at this point that a good impression of the supporting qualities of the rocks at Billingham, may be obtained from this crusher station excavation. The raw limestone walls have not had to be concreted or supported in any way. From the discharge of the crusher, 6 in. material joins the fines from the grizzlies on a 7-ply 36-in. Mayor and Coulson conveyor belt which is powered by a 75 h.p. motor. The broken stone is transported 650 ft. up in 1 in 6 drift, shown in Fig. 33, to a discharge chute mounted adjacent to the tippler, where it joins the anhydrite produced in the old-type working areas in the 180-ton shaft bunker. One section of this belt is carried on the rollers of a Blake-Denison automatic, continuous and totalising belt conveyor weigher. This crusher and conveyor system is designed to handle 400 tons per hour and provision has been made for changing the discharge conveyor from the crusher to 42 in. width if required later. In case of an emergency shut-down of the crushing station facilities, truck-loaded stone may be disposed of through an alternative circuit. Trucks back up to the edge of an inclined ramp down which the stone falls to the feed hopper of a Joy rock elevator. As this station is located adjacent to the Main West Level, 25-cwt. mine tubs may be filled from the elevator and taken by the trolley haulage to the tippler. Blasting This work is performed by the shotfirers who are part of the working face crews. In the new system mining areas, they work from the special carriages previously described, and it is interesting to note that, as electric blasting is used throughout the mine, these shotfirers' carriages are diesel with Bryce-Berger hydraulic starters and carry no electrical equipment, acetylene lamps being used by the shotfirers. When laying out rounds for drilling and blasting, the staff have aimed at effecting a fragmentation that produces 6-in, material, with a minimum of fines, for the loaders. Secondary blasting, on the rare occasions when required, is done at bait time or end of shift. Large stones are moved to one side of the loader by the bulldozer. Polar ammon gelignite explosive supplied by the Nobel Division of I.C.I. Limited is used in conjunction with ½ sec. electric delay detonators, and fired by Beethoven condenser exploders. It is intended to equip two of the 10-cwt. Electricars exclusively for conveying explosives; these vehicles will be fitted with aluminium containers holding 25 lb. of explosive, enabling a total of 800 lb. of explosive to be carried. One vehicle was seen in the underground workshops awaiting conversion at the time of our visit. Clay stemming is used for tamping. Clay, obtained on the company's property, is fed to two extrusion machines located on surface. These machines are electrically-driven, and a worm gear forces the moist clay through a special head; the clay, left unwrapped, is taken underground in a special trolley fitted with racks to hold 24 boxes, each containing about 75 sticks of clay. Ventilation The main fan is located underground, and draws 130,000 c.f.m. down No. 1 shaft, exhausting to No. 2 shaft. This installation is a 13 ft. 6 in. Walker Indestructible fan, chain driven from a Mather and Platt 100 h.p. motor. At the present time, the full h.p. is not taken from this motor, but provision is made on the drive shaft for a future installation of a 300 h.p. motor. The fan has a double inlet, and the evasee has been streamlined by means of a wood floor. A built-in meter shows that there is a resistance of 2.3 in. w.g., and, of this figure, 2.2. in. are created by the size of the shafts, the remaining 0.1 in. resulting from the circulation through the large cross-section roads underground. An alarm is connected to the water-gauge meter, so that warning of a fan stoppage may be immediately given at the weighbridge. In order to make full use of natural ventilation from seasonal changes. fan speed may be easily altered by means of the chain-drive sprockets. In the past, provision was made for reversing the air, but these controls have since been removed; due to the nature of the mining method, absence of timber, and the safety precautions enforced by the staff, the fire hazard at Billingham may be said to be unusually low. In the new working areas, a system of panel ventilation is being employed, and this is illustrated in Fig. 35. Two 100-in, axial flow fans are used per panel of 13 levels, one drawing in 50,000 c.f.m. from the main airway, and the other exhausting an equal amount to the return. By this means, a flow is established close to the working faces without necessitating an excessive amount of construction of stoppings behind the face; as a neutral zone of no air-flow is maintained in the centre road by the opposing action of the two fans, trucks enter the panel without passing a ventilation door or sheet. This air-flow at the face is more than adequate for the operation of five diesel trucks at any one time, and at the moment, no more than three, plus a bulldozer, a shotfirer's and a scaler's carriage, are worked in a panel simultaneously. Safety The staff at Billingham mine have every reason to be proud of their safety record, and a great deal of attention is paid to this very necessary part of the underground operation. Since 1946, when the accident frequency stood at 17, the graph shows a steady improvement to last year's figure of 0.99, and the mine leads the rest of the I.C.I. plant in this safety aspect. This result has been achieved by a system agreed with the miner's Union (Transport and General Workers) under which every accident is investigated by a body of men tinder the guidance of a deputy and the results posted on the mine notice board, whether critical of men or management. Facilities are available for training the men in first aid, and first aid kits are located underground in strategic sites for dealing with emergencies. For more serious accidents, a doctor and ambulance may quickly be summoned from the I.C.I. factory. Maintenance With the quantity of mechanical equipment that is in use underground, very adequate maintenance has been provided, working to strict schedules. Every machine is listed and an office check kept to ensure that all plant gets its routine overhaul at the correct week, month or year. The mining department is notified on a regular pro forma when such work should be undertaken. This maintenance is made particularly necessary due to the action of the anhydrite dust. This is not so abrasive, but, in contact with lubricants, tends to cause them to congeal and set hard. Daily inspections are carried out by fitters (one plus a trainee per shift to each of the new and old area); this work is arranged to coincide where ever possible with periods when the particular machine is not in use, e.g. lunch periods. Apart from these fitters who tour the mine, additional staff are employed for the more major maintenance, overhauls and assembly. This work is done in a large underground workshop covering an area of 40,000 sq. ft. (inclusive of pillars). These extensive shops are equipped for all jobs, and contain bays with inspection pits and Morris 2-ton travelling overhead cranes. Fig. 36 was taken in these workshops and illustrates a Joy loader being assembled while Fig. 37 shows one of the bays, with a Jumbo crane on the pit. All walls are whitewashed, and the area is very adequately illuminated. A warehouse is maintained for stocking and supplying all necessary parts. The mine is also able to call on the workshops and repair facilities available at the I.C.I. factory; these shops are considered to be among the finest in the country. Adjacent to the workshops is one of the showpieces of Billingham, and the staff have every reason to be extremely proud of this section which comprises a canteen, washing facilities, and an auditorium, for the showing of safety films, for lectures and other occasions when it is necessary to gather together and address the whole of the shift. This area was still under construction at the time of our visit, but subsequently the canteen for maintenance men has been brought into use as may be seen in Fig. 38. This underground installation, with its tiled floors and false roof with built-in lighting is the most modern of its kind in this country, and possibly in the world. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||