Tweet
Table Of Contents
Introduction
I.
Description Of The Colliery
Management
Seams worked and lamps used
The Newhill Seam
II.
The North West 1 District
General description and method of work
Ventilation of the district
Afternoon shift of 26th June
III.
Narrative Of The Explosion
IV.
Cause Of The Explosion
Investigation of the affected area
Source of ignition
Source of firedamp
V.
Comments
Emission of firedamp
Accumulation of firedamp
Detection of firedamp
Firedamp detectors
Mechanical damage to electric cable
Contact between source of ignition and explosive mixture
Ignition risk from use of electrical apparatus
VI.
Conclusions
VII.
Acknowledgments
Appendix. — List Of Casualties
Plate 1 — Belting Turned Back Showing Hole In Cable
And Burn Marks On Underside Of Belting.
Plate 2 — Detail Of External Damage To Cable.
Plan 1 — General Plan Of Explosion Area
Plan 2 — Plan And Section Of Main Gate
Mail:
Webmaster
Back
Home
Contains public sector information licensed under the
Open Government Licence v3.0
.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022
Privacy Policy
Terms & Conditions
Search
Print