Diesel haulage equipment Five types of haulage vehicle are at present in use, but it is understood that future standardisation is likely to be made on a rubber-tyred six-wheel chassis embodying a low and wide type of body. This chassis may well be the same as that adopted for mounting the rotary drill booms. The initial diesel trucks placed underground in 1947, had a half-track chassis, and were manufactured by the Linn Manufacturing Corporation, Oneonta, New York. Having a Cummins H 6 engine developing 150 b.h.p. at 1,800 r.p.m., they carry a payload of 12 tons. These vehicles have given excellent service and today are responsible for moving approximately 50 per cent. of the tonnage from the new panels, but they are found to grind up the surface of the roads. Other vehicles include a 150 b.h.p. Euclid (engined similarly to the Linn half-track) giving a payload of 13 tons and an Aveling-Barford, having a Dorman 6 DL 128 b.h.p. engine, which will carry 7 tons. The most recently introduced heavy truck is an A.E.C. vehicle seen in Fig. 23 mounting a special wide low-slung body on a six-wheeled, twin rear drive Mammoth chassis; developing 150 b.h.p. at 1,800 r.p.m., this vehicle will move 14 tons each trip. All these vehicles are rear dump, and, with the exception of the Aveling-Barford, have hydraulic lifts. Back-up lights are provided to facilitate the driver's task when moving into position under the Joy loader. Also in use are a Muir-Hill dumper and a Fordson Major tractor. Both of these have Perkins P 6 diesel engines, developing 46 b.h.p. at 1,500 r.p.m. When the P4 engines in the mobile carriages were first put into use it was accidentally found out (by stalling the engine on an up-grade and permitting the machine to run back in gear) that this engine would fire and run in a reverse direction; this condition, which might be disconcerting to a novice driver, and even dangerous, was rectified by the C.A.V. Limited, London, who altered the design of the camshaft operating the fuel injection, so that fuel cannot be admitted on the reverse cycle. Three TD 14 International Harvester bulldozers of the type in Fig. 25, with Ruston-Bucyrus blade equipment, are employed and have proved to be very reliable. The jobs to which this plant is put are, bulldozing flyrock back from the face blasts to form a heap for the Joy loader, as seen in Fig. 26, cleaning up after the loader, and cleaning up and facing the panel roads. At present refuelling of diesel equipment is carried out, from 4½-gallon jerricans, on a recessed concrete plate. This enables any spilled fuel to be efficiently removed. However, it is the intention of the management to install a 500-gallon tank for diesel fuel underground, with a pipeline in the shaft connecting to a similar tank on surface. This will provide supplies amply adequate for three shifts. Costs over the last year have worked out at 0.80d. per ton for fuel oil, and 0.65d. for tyres and tubes; although these figures may be expected to rise as the workings get farther away from the shaft, and the round trip for trucks increases, it is estimated that these costs will not exceed 2d. per ton for these items together. It is of interest to note that fumes from diesel exhausts have created no nuisance or hazard underground; this is partially due to the practice of derating the engines of the vehicles (by one third) by cutting down on the fuel-pump setting, and also due to operating on a strict maintenance schedule of vehicle overhauls, thus ensuring that the engines are regularly checked and kept in good condition. From the first it was appreciated that exhaust wash boxes are of value only as flame traps, and for removing aldehydes (which, although unpleasant, are not really dangerous); carbon monoxide and the oxides of nitrogen cannot be removed in significant quantities by wash boxes. Research into the conditions that promote the formation of these gases in an engine was therefore undertaken and these results are to be published by the company. Motor roads Both ingoing empty and outgoing loaded motor roads are provided in the new system of mining and this system is considered most necessary, both from a production and a safety standpoint. At the moment there are intersections where empty and full trucks cross, for which regulations require truck drivers to blink headlights and give way to the truck approaching from the right, but this hazard will be eliminated in the future by means of flyover crossings, in the form of overcasts. Where "pedestrian crossings" are required, the motor road is protected by steel pipe barriers screened in at the top so that the individual will realise that he is crossing a motorway, and take the necessary precautions. These motor roads are purposely left unilluminated so that headlights of approaching trucks will immediately be noticed. Although roads driven in the new areas are 24 ft. in width, trucks do have to traverse some of the 18 ft. roads in the old working areas. At sharp corners in this section that have to be negotiated by transport, steel curbs set in concrete are provided to lessen tyre wear. For surfacing the main motor roads a 100 h.p. Aveling-Austin 99 H grader is employed, seen at work in Fig. 27, and the standard of these roads underground is of the highest order. The roads are graded with finely crushed anhydrite and then watered, where after the truck tyres compact the material into a hard surface. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||