Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Events prior to the explosion

B04's District in the Meltonfield Seam

20 Work had proceeded normally on the day shift of 12 June 1975 and the last shears were being taken off the face preparatory to salvage work. Some difficulty had been experienced with the stage loader conveyor chain which was fast at the end of the shift. The fifteen men on afternoon shift, who descended the mine at 12 noon, comprised four tailgate rippers, the tailgate shearer operator and his assistant, six men employed on face timbering, two fitters and a fitter's mate. At the commencement of the shift two fitters, Drury and Austin, repaired the stage loader. Austin then commenced dismantling the loading shovel in the maingate advance heading and Drury worked on the face removing powered support relay bars. At the commencement of this early afternoon shift, Norman, a gate end supervisor who had commenced work at 11.00 am, was in charge of the district until the arrival of Williamson the district deputy who commenced his shift at 2.00 pm. This early afternoon shift left the district about 5.30 pm and Norman left Williamson at the maingate roadhead at this time and travelled outbye along the maingate. He arrived at the pit bottom at about 6.30 pm when he spoke by telephone to Williamson whom he assumed to be at B 04's maingate roadhead.

E 21's District in the Newhill Seam

21 This face in the Newhill seam was affected by water, particularly at the maingate roadhead area, and as a result the face conveyor motor at this end had failed. During the day shift of 12 June work had started to replace this motor and as there was some degree of urgency it was planned to continue working during the afternoon shift. The district deputy Lakin went underground at 2.00 pm and travelled to the district. At 5.00 pm a late afternoon shift, comprising Copperwheat and Baker (electricians), Upperdine (fitter), Buckley, Woodcock and Bannister (facemen), descended the mine. They were all deployed to continue changing the face conveyor motor with the exception of Bannister who was to be pumpsman at the maingate. These men travelled inbye on the man riding haulage and the man riding conveyor as far as E 21's alighting platform.

22 Pull lifts were required to install the new conveyor motor and there was a discussion as to where these were to be obtained because Upperdine had attempted unsuccessfully to obtain some at the pit bottom. Buckley, Woodcock and Bannister went on to the district via the conveyor drift, leaving Lakin and Upperdine at the tandem point where they were joined later by Copperwheat and Baker. After Upperdine had failed to find pull lifts nearby in the return airway, it was agreed that Copperwheat and Baker would go inbye as it was thought there was a set of pull lifts in B 05's return heading. At this time Wilkinson, the transfer point attendant from B 04's maingate, spoke to this group of men on his way outbye and heard this proposal. He warned them not to go into B 05's heading because he knew it was fenced off and thought the conditions there to be dangerous.

23 Lee, a spare deputy on the 5.00 pm shift, who also knew that pull lifts were required for E 21's, went underground about 5.30 pm. He waited in the pit bottom for almost an hour for these to be sent but they did not arrive and he left the pit bottom on the man rider at 6.23 pm. After leaving his coat near the inbye end of this road, he walked to the conveyor boarding point and travelled inbye. About this time Upperdine received a telephone call from Copperwheat to say that he had been unable to find pull lifts in B 04's heading and that he was going to have a look in B 05's return heading. After a while Upperdine received a second telephone call from Copperwheat to say that the deputy's light had been put out twice and they were going to do something about it. Shortly afterwards Lakin left Upperdine and walked inbye along the Meltonfield intake towards the bottom of E 21's conveyor drift. Upperdine started to eat a sandwich and he thought that about S to 10 minutes had elapsed after Copperwheat had last spoken to him on the telephone when the explosion occurred.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z