Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

II — The Explosion

The explosion occurred at 12.15 p.m. on Wednesday, 7th May, 1947, the 7th hour of the day or filling shift. By common consent it originated near the top end of No. 3 right face, which was nearly cleared of coal and travelled through the whole of that face and about half way down No. 3 left face. It extended about 20 yards along the conveyor gate, into the main return to a few yards outbye the cross-gate junction, along the crossgate, and probably some distance along the top tail gate, although there was no clear evidence of the passage of flame along this gate. As explosions go, it was not a violent one although the newly erected door and its brick-work in the main return gate between the crossgate junction and the face were blown down in an outwards direction, One or two chocks on the face were also blown out. There was not, however, any damage to air crossings and the main ventilation arrangements were not deranged in any way. The conveyors stopped at the same time as the explosion occurred.

There were 40 persons at work in the district at the time, disposed as shown on the plan, comprising :—

Ten colliers filling on the left side of the face; eleven colliers filling on the right, side; two repairers in the new crossgate; two borers on the left side of the face; a gear-head attendant at the face of the conveyor gate; four surveyor lads and three timber lads at the inbye end of the main return gate; one shaker conveyor attendant and one stemming boy on the right side of the face; one shotfirer for each side of the face and a deputy. There were also a ventilation measurer and a man erecting sheets in the low side tail gate.

The two repairers in the new crossgate and six of the seven colliers filling at the top of the face and the shotfirer were killed. According to the medical evidence one man died immediately from a fracture of the skull, whilst the others lived only long enough to take a few breaths of afterdamp and were unlikely to move after the explosion. One of the colliers filling immediately below the main return was able to scramble out over the conveyor into the return gate, though men on either side of him were killed. All the remaining persons on the right hand face and in the main return were burnt except one of the timber lads in the main return outbye of the new crossgate junction. The gear-head attendant at the face of the conveyor gate and the fillers working on the upper half of the left hand face were also burnt. The burns for the most part were confined to the upper part of the body although the seam is only 3ft. 10 in. thick.

Most of the injured made their way to the shaft unaided and very little was attempted belowground in the way of First Aid. In fact as the distance to the shaft was so small and the colliery was close to the hospital, the injured persons began to arrive there almost before the staff became aware that an explosion had occurred; however that may be, and notwithstanding any deficiencies, the whole of the injured recovered which is a very outstanding record.

Those who were uninjured, and even some of those less severely burnt, soon made valiant efforts to assist those less fortunate and proceeded with the recovery work aided by officials and workmen from adjoining districts and it is a great privilege once again to bear witness to the cool courage and determination which characterises the conduct of all concerned on these occasions regardless of all personal consequences. It was not possible to enter the right side of the face owing to smoke and fumes but the left side of the face cleared at once. It is a remarkable fact that it was possible to travel the main return right up to the new crossgate junction almost immediately after the explosion and for a period of at least 1½ hours after the explosion despite the presence of smoke and fumes on the entire length of the right side of the face. Quite obviously the air on this face was stagnant even though the new door had been blown down. It was not until nearly 1¾ hours after the explosion occurred when sheets had been placed across the left side face and sheets were being erected across intakes into other districts, thereby increasing the ventilating pressure on the right side face, that the length of face began to clear and it was possible to travel it and recover the bodies of the killed. The cause and duration of this stagnation is a factor of considerable moment which will be considered more fully later in this Report.

It is gratifying to place on record that coal dust played no part in the explosion. The management may well claim credit for the efficiency of the stone-dusting and they deserve a word of praise for the attention bestowed on this important safety measure. At the neighbouring Wharncliffe Woodmoor Colliery in 1936 a firedamp explosion of no greater magnitude initiated a coal dust explosion which wrecked roadways and workings much more extensive than the whole of those at this colliery.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z