Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

I — Description

General. The colliery lies within the Borough of Barnsley and on the east side of it and is situated in a part of the coalfield in which a number of explosions have occurred in recent years. In the last century explosions causing very large loss of life occurred in the immediate neighbourhood. The colliery has two shafts, 400 yards apart. No. 2, the Downcast, is 15 ft. in diameter and 512 yards in depth, whilst No. 4, the Upcast, is 16 ft. in diameter and is sunk to a depth of 640 yards. Two explosions — the first of which was due to a fault in a trailing cable — occurred at the colliery in the Fenton Seam on 16th and 17th February, 1942, and were the subject of an Inquiry and report by Sir John Felton, O.B.E., lately H.M. Chief Inspector of Mines.*

Prior to the beginning of the present year the colliery was owned by the Barrow Barnsley Main Collieries Ltd. and in the process of reorganisation they decided to close it and win the coal from their other two collieries. On account of representations, however, this policy was modified to the extent that it was decided to work the Kent's Thick Seam and stop all others. Development started from the inset in No. 2, Downcast Shaft on 1st December, 1945, and proceeded so rapidly that on 1st December, 1946, the output had reached 1,000 tons a day which was wound in one shift. At the time of the explosion, this figure had increased to about 1,200 tons.**

The Electrical System was 3 phase 50 cycles alternating current at 1,500 volts supplied by the Colliery Power Station 1,250 KVA alternator. Two 550 volt KVA transformers were available to provide supply from the Yorkshire (Electric Power Co. Current was used at 550 volts for all power purposes except drilling for which 125 volts was employed.

Particulars of Seam. The Kent's Thick Seam lies at a depth of 213½ yards from the surface. It is 3 ft. 10 in. thick and the whole section is worked. Occasionally there is a 2 in. dirt band 1 ft. 7 in. from the bottom. The seam is overlain by 12 ft. 2 in. of blue bind and underlain by 5 ft. 9 in. of spavin. The inclination of No. 3 face was about 1 in 18 and the full dip of the seam about 1 in 11.

Lay-out of Workings. The plan shows the workings at the time of the explosion which occurred on No. 3 face. This face was 150 yards in length with the conveyor or intake gate 8o yards, and the main return 30 yards, from the top or right hand side. The tail gates at the extremities of the face were also returns but the object of the second return on the top side was to maintain one that would not be damaged by No. 8 District which was being opened out parallel to them or by other similar districts which might be opened out later on.

No. 8 District consisted of a face which had just been headed out. The connections to the two tail gates were only made within a day and two days respectively of the explosion. These connections were being enlarged on the morning of the explosion. The effect of this new district on the ventilation of No. 3 face is one of considerable significance, upon which comment will be made later in this report.

Electricity was used for coal cutting, drilling, face conveyors, gate and trunk conveyors, and signalling, in each district.

System of Support. The system of support was mainly by chocks set at maximum distances of 6 ft. centres in a row with rows at 5 ft. 6 in. centres. Few props and bars were used but two steel props were supplied to each filler to be set temporarily pending the erection of chocks.

Packs were built at the sides of the four airway gates and the eight dummy gates on No. 3 face so that there were few actual wastes. The size and spacing of the packs are indicated on the plan.

Getting and Conveyance of Coal. The sequence of operations on all faces was that on the day shift shots were fired in coal, and coal was loaded; on the afternoon shift the conveyors were dismantled and moved forward and shots were fired in the dummy gates and the various gate ripping lips and packs were built; on the night shift the coal was cut 10 in. from the bottom of the seam to a depth of 5 ft. 6 in. by chain machines.

There were no haulages apart from one near the foot of No. 4 Shaft for taking in supplies. At the face, coal was loaded by hand on conveyors which delivered to gate conveyors which again fed trunk conveyors from which the coal was transferred into tubs at the round-about near No. 2 Downcast Shaft, where the whole of the output was raised. On No. 3 low side face coal was loaded by hand on a belt conveyor and on the high side face on a shaker conveyor operated by an Anderson Boyes 20 H.P. driving gear placed near the top end of the face. Electric current for operating it was conveyed through a collectively screened 5 core trailing cable suspended from the chocks on the gob side of the conveyor.

Shotholes were closely spaced in the top and bottom coal and shotfiring assumed considerable proportions. There was a shotfirer for each side of No. 3 face and the deputy fired a number of shots also. The explosive used was Plastex in coal and Polar Viking in rippings.

Firedamp and Ventilation. The make of firedamp in the district was small and methanometer readings in the returns from No. 3 District were only of the order of .1 per cent. with 5,000 cubic feet of air per minute flowing.

Firedamp was reported at the top end of the face two days before the explosion and in a cavity at the junction of the new crossgate and the top tail gate on No. 3 face on the day before the explosion. The gas in the cavity persisted right up to the time of the explosion. These were the only reports of firedamp since January last when it was found by the manager and one of my assistants at a similar place when the last crossgate was put through.

On account of this gas a door which had been in position in the main return just inbye of No. 8 left hand tail gate was moved forward to the position shown on the plan just inbye of the new crossgate junction on the day before the explosion.

Ventilation was produced by a Keith Blackman Fan. The quantity of air circulating in the roadways of the mine was 163,000 cubic feet per minute with a water gauge of 2.8 in. The speed of the fan could not be varied and the amount of air circulating in the mine was regulated by a door or shutter in the fan evasee. The recording water gauge was not reliable but it is believed that the water gauge for the mine and the quantities of air circulating in the districts with which this report is concerned are as shown in the following table.

The water gauge for the mine was increased from 2.8 to 3.3 in. on the afternoon before the explosion in consequence of the persistence of gas found in the cavity at the crossgate junction near the top end of No. 3 face already mentioned and the fact that the opening out of No. 8 face might reduce the amount of air available for No. 3 district, particularly the right side face. Air entered the district by the conveyor gate and split right and left and a glance at the plan will show that the pull on the air on No. 8 face and the low side of No. 3 and top side of No. 5 was greater than on the right side of No. 3 face and that the latter was liable to become short of air unless countervailing measures were adopted. There were, in fact, sheets hung on No. 8 tail gates, No. 3 bottom gate and the slit between No. 3 and No. 5 to act as regulators but it is doubtful if they offered as much impedance to the air current as the sheets erected to direct air into the top end of No. 3 face and the hurdle sheet erected under the cavity from which firedamp was issuing.

Supervision. The colliery was under the daily supervision of an Agent, Manager, and Undermanager while on each shift there was an overman for the whole seam and a deputy for each district.

* "Explosions at Barnsley Main Colliery, Yorkshire." Cmd. 6387 (price 1s. 3d. or by post 1s. 5d.), published by H.M. Stationery Office.

** "Some Aspects of Rapid Development through Stone and Coal" — Iron and Coal Trades Review, 16th May, 1947.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z