I. — General Description Of The Colliery.
The colliery has two shafts 400 yards apart. No. 2, the downcast, is 15 feet in diameter and 512 yards in depth. From it the Swallow Wood, Haigh Moor and Lidgett seams, lying at depths of 344, 358 and 393 yards respectively, are raised.
No. 4, the upcast shaft, is i6 feet in diameter and is sunk to a depth of 542 yards. From it the Fenton and Parkgate seams, lying at depths of 524 and 542 yards respectively, are raised. Only the Fenton seam was affected by the explosions.
Professor Douglas Hay is the Managing Director of the Colliery Company; the Agent is Mr. J. E. Longden; the Manager of Barnsley Main Collieries, Mr. A. Benford, assisted by an Assistant Manager and three Under Managers of whom Mr. E. Pilkington acted for the Fenton seam. Mr. J. A. Harrott, the Assistant Manager, and Mr. Pilkington lost their lives in the major explosion on 17th February.
The Fenton Seam is 4 feet 4 inches thick with a dark bind roof and strong spavin floor. At 15 inches from the floor there is a black shaley band 4 inches thick in which the cutting is done.
Plan No. 1 shows the workings in this seam. The main intake and return roads serving these workings passed through a 36 feet upthrow fault through which they were drifted in stone, the intake drift being 45 yards long rising 1 in 6 and the return 30 yards long at a gradient of 1 in 3.
At the time of the explosion two faces were being worked, known as "A" and "B." The "B" face, which was the one concerned in the explosions, was 140 yards long, 95 yards on the left side of the level or loader gate and 45 yards on the right, and dipping from the left to the right at a gradient of about 1 in 20. The coal was undercut 4 feet 6 inches deep by a B.J.D. chain machine, and filled on to conveyors — on the left side a jigger and on the right a belt — delivering to a gate-end loader situated in the main loader gate, but which was about to be moved to the new loader gate or cross gate turned off to the left of it. Cutting was done on both the afternoon and night shifts, ripping and packing on the afternoon shift, turning over of conveyors on night shift, and filling on the day shift.
Shots were fired both in the coal and in the rippings. Three hours before the first explosion four shots were fired in "B" district, two in the right tail gate and two on the face in the left hand corner, without incident.
On each of the three shifts there was a deputy in charge of "B" face supervised by an overman who also had oversight over "A" face.
Ventilation for the mine was produced by a Keith Blackman fan circulating 175,000 cubic feet of air per minute with a water gauge of 4.8 inches. The last recorded statutory monthly measurements (on 26th January) showed 27,260 cubic feet per minute entering the North East District comprising "A" and "B" faces. No record of the respective quantities passing to each of the two faces was made in the statutory report book (as ought to have been done, since they were separate splits and ventilating districts) but another book was kept — "Record of Face Ventilation" — showing measurements taken weekly in intake and return airways 10 yards, instead of 100 yards, from the face, and also the percentage of firedamp in the air as sampled at these ventilation points. This record showed for 11th February quantities of 2,020 and 11,125 cubic feet per minute respectively passing in the intake and return airways of the "B" district, which the safety officer responsible for these records considered represented the normal position.
The plan shows that the intake to this face was the left tail gate, and to force the air up this gate two sheets were placed in the level and two more in the loader gate beyond the new loader gate.
Firedamp. — During the period of six months prior to the explosions the presence of firedamp had been reported by deputies on 10 occasions, viz. :— 8th, 11th and 18th September, 1941, and 27th January, 6th, 7th (day and afternoon shifts), 9th (day and afternoon shifts) and 10th February, 1942 With the exception of those in September — when firedamp was found at the. ripping on the main level (the "B" face at that time not having long been opened out) — all the reports related to feeders in the left hand tail gate which were "being diluted as given off." In these latter cases no percentage was recorded, the reason, as given in evidence, being that the firedamp was issuing from breaks where it just showed about 1 to 1½ per cent, and could not be found in the general body of the air. If any percentage at all is indicated it ought to be recorded in the report book.
Electricity was used at the face at a pressure of 550 volts A.C. for coalcutting and conveying. (The position of cables and switchgear are shown on Plan No. 2.) Compressed air, supplied by a main running up the left tail gate, was in use for drilling shot holes and also to drive the jigger conveyor.