2. General Information — Supervision and Equipment of the Mine.The Gresford Colliery, owned by the United Westminster and Wrexham Collieries, Limited, is situated near the village of Gresford, about two and a half miles north of Wrexham, Denbighshire. The mine has two shafts, namely: the downcast known as the "Dennis", and the upcast known as the "Martin". Coal was wound at the Dennis, and materials sent down the Martin shaft. Men were lowered and raised in both shafts. The sinking of these shafts was commenced in 1908 and coal was first wound in June, 1911; the mine was therefore not a mine "newly opened" within the meaning of the Coal Mines Act, 1911, and consequently the provisions of Section 42 (1) of the Coal Mines Act, 1911, requiring the provision of two main intake airways for each seam did not apply. A total of about 2,200 persons were employed at the mine; 1,850 below ground and 350 above ground. Three seams were worked, namely. Main, Crank and Brassey, but at the time of the explosion the workings in the Brassey Seam were idle. The Dennis Section of the Main Seam in which the explosion occurred comprised five Districts, each worked on the longwall system and known respectively as 20's, 61's, 109's (including 95's), 14's and 29's — see Plan 1; and in this section about 280 persons were employed on the day shift, 240 on the afternoon shift, and 195 on the night shift. Coal was got and wound on the morning and afternoon shifts. Some coal was also got and wound during Friday and Sunday nights. The packs and face conveyors were moved up during the night shift. The average weekly output of coal from each of the Districts during the ten full weeks prior to the date of the explosion was:—
Supervision. — Mr. William Bonsall, the Manager, had occupied that position since 1917. Previously, for three years, he had been assistant to the Manager (Mr. Groves). According to official records, Mr. Bonsall, before becoming assistant to Mr. Groves, had been a deputy for three years, an overman for three years and undermanager for two years at Swanwick Colliery, Derbyshire, and previous to that had worked for nine years as a filler, holer and contractor at Pinxton and Cotes Park Collieries and for four years as a haulage hand at Birchwood Colliery, all in Derbyshire. Until some two years before the explosion there was also an Agent (Mr. T. H. Cockin) of the Colliery, but that office had not since been filled, Mr. Bonsall being left to carry on the mine without the guidance of any technically informed superior official. Mr. Bonsall visited the several districts in the Dennis Section from time to time but, as he explained in evidence, for the two months before the explosion he had spent most of his time in the South-East Section where belt conveyors were being installed. He had been underground during the night shift, but it was so long ago he could not remember when. For many years Mr. Thomas Hughes was under-manager but in 1933 he fell sick and Mr. Edward Alan Roberts acted in his place. After January, 1934, there were two undermanagers, Mr. Edward Alan Roberts and Mr. Andrew Williams. Mr. Roberts supervised the South-East and No. 1 North sections of the Main Coal Seam and the Crank and Brassey Seams, and Mr. Williams the Dennis Section of the Main Coal Seam. Mr. Roberts, before becoming under-manager, had since 1914 been employed at the Colliery as an Overman. Mr. Williams was not, before January, 1934, employed at the Colliery but, up to nine years previously, he had had 24 years' experience in the North Wales coalfield at Hafod Colliery. During the time he was absent from the North Wales coalfield, he was Agent and Manager of the Blaenhirwaun Colliery, Carmarthenshire. Mr. Williams, having only the Dennis Section to supervise, was underground there daily but very seldom at night. He arrived at the pit about five o'clock each morning and left about half past five in the afternoon. In addition he very often went back again later. He said he was underground during the night shift on 27th April to see the repairers working on 142's deep, and on the night shift of 7th August he visited the face of 14's district to see how a newly installed coalcutting machine was working. Electric power was in use for coal cutting and conveying, the chief electrician being Mr. Josiah Ernest Hague. Mr. Sydney Erwin Hayes was the Colliery Surveyor. He was assisted by Mr. William Idris Cuffin who, as will be indicated later in this report, was latterly given additional duties under the manager's directions for the taking of air measurements and the collection of dust samples. There were three Overmen, one on each shift, but one only of these, Mr. Frederick John Davies on the night shift, exercised any supervision in the Dennis Section and that only very occasionally. The last time before the explosion that he had been in the face of any of the workings in the Dennis Section was on 21st August when he was along the face of 14's district. Some time during August, he had been along the face of 29's district, and on 19th August was in 20's road in 20's district but did not visit the face; in June he had been in 23's face in 109's district and in March round 95's district and in two or three faces in 20's district. In fact, as Mr. Davies said in evidence, he devoted his time to the South-East Section of the Main Coal and it was only now and again that he went into the Dennis Section. This means that, except during the time Mr. Andrew Williams, under-manager of the Dennis Section, was underground, that section of the mine was supervised by the deputies, of whom there were 15, as follows —
The remaining deputy (*Edwin Chester) was employed on the night shift. He supervised the men who were employed during that shift in the drift at the inbye end of the Dennis main haulage road beyond the "Clutch" and travelled and reported upon that haulage road and the Martin return airway. Electricity. — The electrical installation in the Dennis districts of the Main Seam, including telephones and bell signalling circuits and instruments, is shown on Plan 1. Three phase current at 3,300 volts was taken down the Dennis shaft to two transformers, each rated at 300 kilo-volt amperes, situated near the shaft bottom, where the pressure was reduced to 570 volts, to work the haulage engines, coal cutting machines and conveyors. The neutral point of the 570 volt 3 phase system was earthed and the main circuit-breakers on the outgoing side of the transformers had leakage trips, operating at about 30 amperes, in 1/10 th second in addition to overload trips set at about 320 amperes with retarding devices. Each transformer was connected to a separate switchboard comprising switches and fuses for the various circuits and the two switchboards were interconnected by a circuit-breaker similar to those connecting the transformers to the switch boards. Lighting about the pit bottom was supplied from a small transformer which reduced the pressure to 110 volts and this transformer was controlled by a switch and fuse fed from one of the two switchboards. There was one main cable, installed in the Dennis main intake airway, carrying current inbye for the whole of the Dennis Section and this cable was controlled at its origin by a switch and fuse. According to the evidence, some of the coal cutting machines and conveyors were of certified flameproof type and others, although not of certified type, purported to be of flameproof design. The signal bells were of certified intrinsically safe type but the magneto telephones were neither intrinsically safe nor in flame proof casings. There were numerous occasions recorded in the prescribed **Log Book when the pit bottom circuit-breakers had been tripped on leakage and the place and nature of the defect which caused them to trip, with the repairs that were carried out, were also recorded. Haulage. — The haulage on the Dennis Main Intake and 142's Deep was by endless rope driven by electric motor placed near the Dennis shaft bottom. In the districts there were main and tail and main rope haulages driven by electricity or compressed air. The position of the electric motors is shown on Plan 1. Pumping. — The mine is dry, the only pumps being (a) one in a lodgement 500 feet from the surface between the two shafts, (b) a small pump for pumping water from the Dennis shaft sump to the Martin shaft sump, and (c) a small pump for emptying the Martin sump into tanks in the cages in that shaft for winding to bank. Safety Lamps. — Except for some 30 electric lamps used mostly by the electricians, the safety lamps were flame lamps of the Prestwich Patent Protector Type. * Killed in the Explosion. ** M. and Q. Form 10.
A copy of this report was kindly donated by
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||