1. Introductory.Explosion. The explosion occurred about 2 a.m. on Saturday, the 22nd September, 1934, in the Dennis Section of the mine (see Plan 1) and its effects were limited to that Section, though the concussion was felt at the pit bottom and in the Slant District. Except for a few persons working near the pit bottom and one Deputy and five men who managed to escape from 29's District, to whom I shall refer again later, all the men who were employed in the Section at the time lost their lives. In addition, three members of a rescue brigade lost their lives the same day in attempted recovery operations. Fire followed the explosion, and more particularly an extensive fire in the main intake airway at 29's Turn, which was fought continuously but unavailingly until the evening of the following day, by which time it was certain that all men not accounted for must be dead and the conditions as regards the presence of inflammable gas had become imminently dangerous. It was accordingly decided by the representatives of the Owners, Workmen and Inspectors that the mine must be sealed off at the tops of the two shafts, and this was done. A notice announcing that decision was posted at the colliery; a copy is included in the appendices to this Report — Appendix I. Further explosions occurred in the mine and at 1.25 p.m. on Tuesday, 25th September, one of them wrecked the sealing of the downcast shaft and a surface worker was killed by the projected debris. This brought the total loss of life up to 265, making this the worst disaster in British coal mining since the explosion at Senghenydd Colliery in 1913. A list of those who lost their lives is given in Appendix II.: so far, only 11 of the bodies have been recovered; the cause of death in each case was poisoning by carbon monoxide. It was not considered safe to commence any recovery operations until about six months after the shafts were sealed, and then, by difficult and arduous operations, the shafts and the shaft bottom were recovered, and later, the Dennis Section was sealed off by a system of stoppings in the main and other roads leading into it. That is still the position, and no examination or inspection of the Dennis Section has been possible except for exploration along the main Martin return and thence to the top of 142's Deep by men wearing self-contained breathing apparatus. The Inquiry. The Inquiry was opened at Wrexham on the 25th October, 1934, and as at that time the whole mine was sealed off and the possibility of progress with investigation as to the actual causes of the explosion was remote, it was decided that the course which, for the time being, the Inquiry could best follow would be — 1. To take evidence as to the condition of the mine and the operations connected with its working prior to the explosion; 2. To take evidence of the occurrence of the explosion and the events following thereafter; and 3. To take such evidence as to the cause as was then available. That course was followed in the order shown. The evidence under Part I of this programme was limited to the Dennis Section, in which the explosion occurred, and in respect of that Section to such matters as had or might have had a bearing on the causes of the explosion; that is to say, to questions of ventilation and the occurrence of inflammable gas, to questions of the occurrence and treatment of coal dust, and to matters in relation to practices such as shotfiring and the use of electricity, in which the explosion might have had its origin. Into all such matters in relation to the Dennis Section the fullest investigation was made that was possible in the circumstances, and the fullest liberty of examination and cross-examination of witnesses was allowed, as is shown by the fact that there were 189 witnesses, and that the Court sat on 30 days to hear evidence and 38 days in all. But throughout the proceedings, the Court and the parties laboured under the heavy handicap that hardly any of the evidence — and much of it was contested, or challenged by other evidence — could be verified or checked by any inspection of the workings. That handicap has been keenly felt in the preparation of this report. The parties who appeared at the Inquiry, with the names of the representatives, are set out below: a full list of the witnesses is given in Appendix III.
A copy of this report was kindly donated by
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||