VIII. — Comments On The Planning Of The Re-Opening Operations(43) The exploration and, in particular, the re-establishment of the ventilation appears to have been carried out on an ad hoc basis and there seems to have been little sense of urgency. The plans for breaching the stoppings in the drifts were excellent and had been laid down beforehand in detail, but what was to happen after that seems to have been left to be decided upon in the light of the state of affairs at the time. The result was delay, amounting to days, in restoring the ventilation and in clearing the accessible workings of firedamp. The contours of the area were known and flooding of the airways in the "swilley" should have been anticipated and the necessary pumping gear should have been ready. It does not seem to have been realised that once fresh air reached the top of the drifts it would flow downhill under the lighter, less dense, firedamp and that it would not all enter the return where the doors at No. 1 East Air Crossing had been left open in January. For lack of a definite plan to restore the ventilation right into No. 4 East on a fixed time-table of hours, together with the provision of the necessary materials to seal off leakage at the various connections between intake and return, a period of no less than nine days elapsed before anything approaching a sufficient volume of air was supplied to begin to clear the gas from the rise side of No. 4 East District. Had the plan been to clear the roadways in stages (as it might very well have been in view of the large volume of firedamp involved) this could have been settled beforehand; the points at which temporary stoppings were to be erected decided upon and the necessary materials provided. (This method was adopted successfully in 1926 at Birchenwood Colliery in Staffordshire)*. Even if it was intended to make one clean sweep I am unable to understand why progress was not more rapid. It has long been recognised as a cardinal principle when a working is to be cleared of firedamp that gas and air must not be allowed to mix slowly and that the gas should be removed as nearly as possible in the form of a "plug" and a close examination made immediately on its "heels". This is particularly important when the gas has accumulated because the area has had to be sealed up in order to smother a fire. In these circumstances there is no air current to carry away the heat generated by the fire and it can only disappear by dissipation into and through the strata. As ordinary coal measure rocks are very poor conductors of heat this process is of necessity a slow and lengthy business, and indeed if the fire has been one of some magnitude it is questionable if a period of six months is sufficient to allow the surroundings to cool to something approaching normal strata temperature. If one bears in mind the fact that very few substances oxidise more rapidly than coal, particularly "half burned" coal or "half coked" coal, when it is only slightly warm, the importance of this rate of cooling becomes apparent. * See Transactions of Institution of Mining Engineers, Vol. 75, page 62.
A copy of this report was kindly donated by
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||