Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mine & Quarry Engineering - Main Index
Mine & Quarry Engineering - Subject Index
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
September, 1959

Shap Granite — Part 2

In the concluding instalment of this article* on operations at the Shap Granite Co. Ltd. in Westmorland, a description is given of the company’s Blue Quarry and the crushing and screening plants for the production of graded stone
By E. G. Holland

The material brought by dumper from the Pink Quarry face is dumped into a reception chute at the crushing plant. Here it is controlled by a 5 ft. hanging curtain of heavy gauge steel bars, passing by gravity onto a 108 in. by 60 in. Parker feeder. This unit delivers the rock to a vibrating Nordberg grizzley screen that removes dirt and -1½ in. material which is taken by conveyor to a 30 ton dirt hopper.

Originally this -1 ½ in. material was screened and the -¼ in. undersize fed into a sand washer. The waste was passed to the dirt hopper, and the washed + ¼ in. delivered to the conveyor below the primary crusher. However, the washer was found to have insufficient capacity for dealing with the amount of waste produced; delays were experienced and the equipment is not at present in use.

Crushing

The primary crusher is a Broadbent 42 in. by 36 in. jaw breaker running at 150 r.p.m. and powered by a 100 h.p. Metrovick motor which operates at 960 r.p.m. It is fed with the + 1½ in. material from the Nordberg grizzley, and delivers a -6 in. product on to the primary conveyor. This is a Cowlishaw, Walker 26 in. trough conveyor at 118 ft. centres, and driven by a 10 h.p. Metrovick motor. For the removal of tramp iron, a powerful electro-magnet is .situated midway along the belt, 8 in. above it, and capable of lifting 56 lb. of metal a distance of 1 ft.

The primary conveyor delivers into a 30 ton surge hopper from which a 48 in. by 24 in. Locker feeder supplies stone to a Pegson Telsmith 8B gyratory secondary crusher set to give a -2¼ in. product. This crusher is driven by a 35 h.p. Metrovick motor running at 1,460 r.p.m. The -2¼ in. material is taken by a 24 in. conveyor (at 90 ft. centres), which delivers on to an 8 ft. by 3 ft. Gyrex screen powered by a 5 h.p., 1,460 r.p.m. Metrovick motor. Here a further magnet has been installed, 3 in. above the belt in front of the screen.

The Gyrex screen delivers a -¼ in. undersize which is fed into a 50 ton hopper, this material being reserved for the company’s own needs. The oversize, -2¼ in. to +¼ in., is fed into a 3 ft. Nordberg Symons Shorthead cone crusher powered by a 75 h.p. Metrovick motor. This machine is set to deliver a product of approximately -¾ in. in size which falls into a chute that feeds a hopper. From this, material is removed by a Parker 20 in. bucket elevator at 58 ft. 6 in. centres, powered by a 15 h.p. Brook motor running at 725 r.p.m.

Screening

As indicated in the fiowsheet shown as Fig. 20 the elevator delivers directly on to a three-deck 96 in. by 40 in. Niagara screen at a rate of 30 tons per hour, the feed containing about 25 per cent, of -1/8 in. material. The bottom deck of this screen provides an undersize of -1/16 in., and an oversize of -1/8 in. to +1/16 in. which is passed directly into two 75 ton hoppers. The oversize from the middle and upper decks is fed by means of a double chute on to two different decks of a 22 ft. by 4 ft. Parker Oscillex screen. This unit sizes the material to 3/16 in., ¼ in., 3/8 in., and in., delivering them into their respective hoppers below, and rejecting material above in. The rejects are directed by a chute on to a 16 in. belt to be returned to the 3 ft. Symons crusher for re-crushing. Also, those hoppers containing the ¼ in., in., and in. stone can be discharged on to the same belt, if it is necessary for these fractions to be crushed further.

The hopper doors for controlling the discharge of material into lorries are positioned 10 ft. above ground level, while on the access road leading to the quarry a weighbridge of 30 tons capacity has been provided.

A dust plant has been installed which is capable of cleaning 7,000 cu. ft. of air per min. Dust-laden air is drawn by fan from the Symons crusher, from the hopper feeding the Parker elevator, and from the Niagara three-deck screen. This is discharged directly into a hopper, the dust from which is drawn off into lorries for disposal through gate valves fitted with 5 ft. canvas sleeves.

Electrical

The quarry operates its own sub-station, power being derived from the Westmorland & District Electricity Supply Co. Ltd. For use within the plant it is transformed to 400/440 V by a Johnson and Phillips 300 kVA transformer. The supply for power tools, magnets and inspection lamps is at 110 V while 230/250 V is used for lighting.

The main switchgear was supplied by George Ellison Limited and the cables by British Insulated Callender’s Cables Limited and Johnson and Phillips Limited. The motors are all totally enclosed, and were provided by Metropolitan-Vickers Electrical Co. Ltd. and Brook Motors Limited.

The plant is started in sequence, the penultimate item being the primary conveyor. The primary crusher attendant does not start the crusher until this belt is in motion.

General

A blacksmith’s shop is conveniently sited and equipped with tools enabling minor repairs to be performed at the quarry. Murex welding plant and oxy-acetylene equipment are available, together with Holman and Ingersoll-Rand drill sharpeners, a Holman hot miller, and a Black & Decker drilling outfit.

Workshops at the main works are fully equipped and capable of repairs to most of the plant, this being a necessary provision owing to its isolated position.

This granite is a hard and very abrasive stone, and it is of interest to note that Broom and Wade Limited take a certain amount for testing purposes. Bits in the quarry need re-sharpening after drilling 50 ft. and the teeth of the 33-RB face shovel require replacement every two weeks. These are sent to the main works to be built up by welding.

Compressed air is supplied by a Broom and Wade type FH 255 compressor, this being a two-stage three-cylinder machine, operating at 310 r.p.m. and providing 600 cu. ft. of air per min. at 95 lb. per sq. in. Delivery to all parts of the quarry is made through a 3 in. pipeline. The compressor is powered by a Metrovick 130 b.h.p. motor at 970 r.p.m.

* An earlier article, published in the August, 1959, issue of this journal on pp. 344-351, dealt with face operations in the company’s Pink Quarry and the preparation of stone for masonry purposes.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print