Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mine & Quarry Engineering - Main Index
Mine & Quarry Engineering - Subject Index
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
 Mine & Quarry Engineering November, 1956 

Drainage

Although the mine workings so far developed are quite dry, the possibility of encountering both water and methane has received considerable attention from the management. Precautionary steps have been taken to minimise the effects of these hazards should they be met in future mining operations. Of the two, it is felt that water is the more likely hindrance and a 200 gal. per min. Mackley pump is to be installed at the bottom of the mine. This will be ready for immediate use should the emergency ever arise.

The only water that has to be removed from the mine at present is seepage into the upper sections of the two main drifts. Down to a depth of some 200 ft. numerous small veins of secondary gypsum or "satin spar," ranging from ½ in. to 6 in. in thickness, occur in the marl. In many cases where these intersect the headings they have been found to act as courses for water. The total inflow amounts to approximately 30 gal. per min.

This water is removed from the mine by means of three pumping stations, each one being of similar type and cut in the side of the south drift. In each station there are two Mono D 10 D two-stage pumps powered by 10 h.p. Crompton Parkinson electric motors; one pump is in use transferring the water to the next stage, and one acts as a standby. Each station has a small storage sump and the water is taken to surface through a 3 in. rising main. Laid beside this pumping column is a 6 in. pipeline which has, in the past, been used for bringing compressed air underground from a surface plant. However, with the completion of the underground compressor installation described in the next paragraph, this 6 in. line is now available for emergency pumping duty.

Power

Compressed-air requirements for the percussive rock drills are supplied from a compressor installation underground, in a chamber excavated to one side of the present bottom of the south drift. A total of six machines have been set up here to provide a freeair delivery totalling 1,800 cu. ft. per min. at 100 lb. per sq. in. These feed a 6 in. main leading to the workings.

Four of the compressors are Ingersoll-Rand type 40 model 75 HB units. These are stationary, single-acting, two stage, air-cooled compressors of radial construction and, as they are compact, light in weight and well balanced, installation is a simple process. Each machine has four low-pressure and two high-pressure cylinders and is specified as operating at 970 r.p.m. to give a free air delivery of 388 cu. ft. per min. at 100 lb. per sq. in. Each 75 HB is driven by a 95 h.p. Crompton Parkinson electric motor, controlled through Ellison switchgear and starter. The two smaller units are model 50B machines of similar manufacture and general characteristics.

Electrical power for the mine and surface crushing plant comes from a substation, identified as located in the south-western corner of the Solway factory site. For supplying the rest of the acid and cement plant five substations were erected as part of a ring main system but, because of its location, the W substation has been fed separately from the main incoming substation through two 11 kV duplicate feeders using 0.2 sq. in. cable. For all the electrical services, Crompton Parkinson Limited were responsible to the engineering department of Marchon Products Limited who acted as the main contractors. Power is taken underground at 3,300 V and transformed to 440 V for use at the individual motors. The various cables used in the mine for carrying current were provided by British Insulated Callender's Cables Limited.

Anhydrite preparation

The run-of-mine anhydrite has an average size analysis of 10 per cent. +6 in., 30 per cent. 3-6 in., 35 per cent. ¾-3 in., and 25 per cent. -¾ in. The largest sized material that has to be handled is 14 in., this being controlled by the grizzley setting at the underground hopper. This size analysis varies with the colour characteristics of the stone; the whiter the anhydrite is, the more brittle it is found to be, and a higher percentage of fines occurs in the feed to the primary crusher building. Also it is generally true to say that the whiteness of the stone is related to its purity; the highest percentage of CaSO4 is found in a translucent milk-white variety.

The preparation of the anhydrite up to the point where it is admitted to the raw materials storage for the sulphuric acid and cement factory is under the control of the mine management. A flow diagram illustrating the various stages of treatment is shown in Fig. 19 opposite.

After passing the belt weighing installation referred to in an earlier paragraph, the conveyor discharges at the top of the primary crushing house on to a two deck 60 in. by 102 in. Gyrex C. 11 vibrating screen. This unit, made by Fraser and Chalmers Engineering Works, Erith, is equipped with 6 in. and 3 in. cloth. The reject material normally proceeds by gravity chute to the primary crusher, a 42 in. by 30 in. Stag jaw breaker manufactured by Edgar Allen and Co. Ltd., Sheffield. This machine is powered by a 110 h.p. motor and has a capacity of 100 tons per hour at its setting of 6 in.

Alternatively +6 in. stone from the scalping screen may be deflected on to a stockpiling conveyor to an area where some 1,000 tons may be stored in the open. However, this facility is used rarely because, as will be observed from the flowsheet, it is not possible to direct this material back to the primary crusher after reclamation. It can only go to the secondary crushing house where it is rejected on the initial screen and sent to the rail sales hoppers.

The rejects from the lower deck of the primary scalping screen comprise 3-6 in. anhydrite. This can bypass the primary crusher joining the products therefrom, or be put out on a second stacking conveyor to form another stockpile. Obviously material of this size is preferred for storage as it can act as reserve for both factory and rail sales. The storage area available for 3-6 in. stone permits a pile of 20,000 tons to be laid down in the open.

Reclamation from both stockpiles is done by means of a bulldozer, which feeds the stone to a grizzley. From this a vibrating feeder supplies the material to a 36 in. belt that discharges on to the conveyor going up to the secondary crusher house.

The -3 in. from the primary screen joins the crushed products from the jaw breaker, and the 3-6 in. stone not stockpiled, and is taken up by a 36 in. conveyor belt to the top of the secondary crusher house. A single-deck Gyrex 60 in. by 102 in. C. 11 screen separates the feed into plus and minus 6 in., the former going to the rail sales hoppers. There are two of these bins, each holding 100 tons, from which anhydrite is loaded into railway hopper wagons.

The -6 in. product from the first screen in the secondary building is screened again on a 60 in. by 144 in. C.10 Gyrex, to give +3 in., -3 in. to +¾ in. and -¾ in. Both of these first two sizes can go to the railway hoppers, or either one or both of the two identical secondary crushing installations. This control is achieved by means of flap valves in the gravity chutes.

The secondary crushers are each Edgar Allen KB.4 rotary pulverisers, fitted with three swing hammers and 1½ in. lower screens. They are fed by means of vibrating feeders and driven by 100 h.p. Crompton Parkinson motors. The crushed products are delivered on to a conveyor belt where they are joined by the -¾ in. stone from the C.10 screen. This material is taken into the raw materials storage for the sulphuric acid plant, a covered area accommodating 2,500 tons. When required inside the factory, the anhydrite is reclaimed by means of an overhead travelling grab crane.

Acknowledgments

We wish to express our appreciation to Mr. F. Schon, Chairman of Solway Chemicals Limited, for permission to visit and describe this property. We are grateful also to Mr. A. Halfpenny, B.Sc., Technical Managing Director, for supplying much of the information contained in this article, and to Mr. E. Charlton, Mine Agent, for escorting us around this interesting mining operation.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print