Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mine & Quarry Engineering - Main Index
Mine & Quarry Engineering - Subject Index
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
November, 1956

The Sandwith Anhydrite Mine — Part 2

Our description of this Cumberland property, operated by Solway Chemicals Limited, is concluded with details on stone-handling below and above ground, and mine services.

The dumpers deliver the anhydrite to a disposal point underground where the material is transferred to a main conveyor belt which transports it to surface through the north drift. At the transfer point, a crosscut has been taken over the north drift in the form of a fly-over, so that there is a 30 ft. difference in elevation between the floor of the drift and crosscut. Between these levels, a storage hopper holding 15 tons of stone has been excavated and lined with steel plates. At the top of this hopper, grizzley bars have been installed at 14 in. spacing, but it is understood that these are to be relaid to a 10 in. gap in the near future.

The dumpers discharge their loads direct on to the grizzley and an attendant breaks any oversize lumps. From the storage hopper anhydrite is taken by a plate feeder immediately beneath it and passed on to the first section of the conveyor. This storage arrangement outlined above is only a temporary measure and development is progressing in the upper anhydrite seam for cutting a 400-ton main storage pocket for the broken stone. When completed the conveyor will be extended so that it may be fed directly from this hopper.

The conveyor installation, by Richard Sutcliffe Limited, who also supplied the equipment for the storage and feeding arrangements underground, comprises three individual sections. These units are responsible for bringing all the mine production out to surface, a distance of 3,000 ft. up a gradient of 1 in 7. Each section is similar, having a driving head powered by a 60 h.p. electric motor through a Fluidrive coupling. Although a 36 in. belt is now fitted, a 42 in. frame has been provided so that any future increase on the scheduled production can be accommodated relatively simply. The belt is at present running at a speed of 180 ft. per min. but the installation has been designed ultimately for a speed of 280 ft. per min. That section of the belt at the loading point has been equipped with rubber impact idlers*, and the floating tail-end is provided with fully automatic tensioning. For making the necessary connections throughout the three sections of belting, Hayden-Nilos fasteners have been employed and these have proved simple to install and effective in use. Each section of the conveyor is operated through a sequence control.

Emerging from the portal of the north drift, the final section of conveyor discharges run-of-mine (-14 in.) anhydrite into the primary crushing building. Between these two points, a continuous belt weigher has been installed, this unit being of the type that weighs on one idler only and is manufactured by Adequate Weighers Limited. This machine records the total mine output and it is on these figures that the weekly production bonus for the mine labour is based. All employees participate in this bonus, differing rates being paid for the various job categories. The highest rate is paid to the production teams of which there are a total of six (two per shift). Each of these teams is made up of four drillers and two assistants, one loader driver and an assistant, and three dumper drivers. These men are allotted a group of headings in which they are responsible for all the work, no other crews being admitted. Thus the production per shift from each team maybe estimated (by dumper count) and a healthy competitive spirit introduced. The bonus is paid on the shift output and, in most cases, the two production teams involved agree to share evenly.

The underground supervision have an office down the mine at a point convenient to the main centres of activity. In this room is contained first-aid equipment housed in tubular containers 10 in. in diameter by 8 ft. long made by E. C. Theedham Limited. These provide storage for stretchers while in the ends are compartments for housing dressings and a morphia safe. Additional emergency equipment is stored in wall cabinets. Among the crews are trained and certificated St. John Ambulance men.

Ventilation

The mine is ventilated artificially, a pressure fan being installed on surface at the portal of the south drift, through which fresh air is delivered for distribution to the workings. This unit is a Sirocco medium-pressure 90 in. diameter turbo-axial fan, which is designed for a duty of 120,000 cu. ft. of air per min. at 6.5 in. static w.g. and 610 r.p.m.

As it is the first fan of this type to operate at a mine in Britain, its salient features will be of particular interest. Normally for an operating pressure of 6.5 in. static w.g. it would be necessary for an axial-flow fan to have two stages to obtain high efficiency and at the same time be reasonably quiet in operation; consequently the makers, Davidson and Co. Ltd., of Belfast, claim that this new design of high efficiency turbo-axial fan has a higher pressure coefficient than any other axial-flow mine fan operating in this country.

In recent years there has been a demand for higher water gauges for mine fans necessitating the use of multi-stages for axial-flow fans. This manufacturer has been carrying out research with the object of getting single-stage fans to do what normally would require at least a two-stage fan; to succeed in raising the pressure coefficient would be a substantial step forward in fan design. This work has resulted in new design methods making possible high efficiency axial-flow fans with pressure characteristics which, if not superior, are claimed to be at least equal to those of backward-bladed fans. In conventional axial-flow fans the rotor blade design is usually computed with the help of the two-dimensional aerofoil theory, for which a considerable amount of lift and drag test data are available. Most of the total pressure is produced in the fan rotor, that is the pressure rise is contingent upon retardation of the relative speed through the rotor. In the design of the turbo-axial fan retardation in the streamline flow through the blade passages is avoided, the pressure rise being principally obtained in the guide vanes and diffuser.

The conventional axial-flow fan has constant, or approximately constant, blade length radially, whereas in the turbo-axial fan the blade length decreases considerably in the flow direction. The blade camber lines, or aerofoils, are calculated so as to make the blade passages as efficient as possible — a procedure employed in the design of turbine blades.

Apart from the rotor the component parts of the fan are similar to those in the conventional type of mine fan in that there is a set of downstream guide vanes, a fan casing, inlet flare and a diffuser. These parts are of fabricated steel construction. Michel bearings are fitted and these are provided with temperature indicator instruments, the drive being by means of V-ropes and pulleys from a 125 h.p. electric motor.

At the present time, the fan is not required to be operated at its rated capacity and pulley sizes have been changed accordingly. It is delivering 80,000 cu. ft. per min. at 1½ in. w.g. and is taking only 30 h.p. from the motor.

As the south drift is equipped with rail tracks on which manriding sets are operated, the fan is installed in a parallel by-pass drift on surface and double airlock doors fitted at the adit portal. All men entering or leaving the mine must pass through these, and small manway doors are set in the larger main ones. To save needless opening and closing of the doors, the manriding set is stopped inside the drift for personnel to dismount. While the airlock door arrangement is a necessary evil in the case of a surface fresh-air fan layout such as this, the alternative of placing the fan underground at the bottom of the drift was considered. Although this would have proved more convenient in that doors would not have been required at the portal of this servicing entry, it was decided against because of the possible future introduction of regulations forbidding the positioning of a main fan at any other site than surface.

* "Conveyor Impact Idlers," Mine & Quarry Engineering, Vol. 21, No. 8, August, 1955, p. 345.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print