|
Jun 1954 - Part of the stockpile maintained for fluctuating demand. In the background may be seen the top of the screenin tower, with, on its right, part of the present coating plant. Behind this is visible the upper section of the quarry face being worked
Jun 1954 - Part of the stockpile maintained for fluctuating demand. In the background may be seen the top of the screenin tower, with, on its right, part of the present coating plant. Behind this is visible the upper section of the quarry face being worked (from Mine & Quarry Engineering [June, 1954]) Image Reference: L-00745-03-0065-F20 Please note: We only have a low resolution copy of this image which is suitable only for display on this web page. |
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||