| Sample |
Date |
Description |
| May 1954 | View showing the new plant at Threlkeld, with the building housing the main selection screen, tertiary jaw and cone crushers shown in the right foreground. The screning and coating plant is seen on the left. |
| May 1954 | View of the Knott Close face with the 19-RB shown loading in the left foreground. |
| May 1954 | Secondary drilling of oversize rocks shown in progress, while on the left a hole is being loaded with gelignite dynamite. |
| May 1954 | The 1½ cu. yd. Ransomes and Rapier model 462 excavator, responsible for two-thirds of the face production loading, shown with one of the fleet of tipping lorries. |
| May 1954 | The two concrete runways up which the quarry trucks bring stone from the face to the primary crushing building which is shown on the right. |
| May 1954 | One of the Ford Thames model 7V trucks shown tipping rock brought from the quarry face at the primary crusher chute |
| Jun 1954 | Loading of dry stone from the hoppers into a Ford Thames model ET 6 5-ton truck, one of the company's road transport fleet. |
| Jun 1954 | Part of the stockpile maintained for fluctuating demand. In the background may be seen the top of the screenin tower, with, on its right, part of the present coating plant. Behind this is visible the upper section of the quarry face being worked |
| Jun 1954 | The Muir-Hill loader shown loading stone from the stockpile |
| Jun 1954 | View of part of the Threlkeld plant, which was designed, supplied and erected in 1949 by Robert Broadbent & Son Ltd. On the left may be seen the buildings housing the macadamising, screening and storage plant |