Gas storage, dilution and boosting From the ammonia washers the gas passes to the benzole scrubbers (described later) and thence to a Newton Chambers single-lift, spirally guided gasholder, with a storage capacity of 200,000 cu. ft. When fully inflated the holder throws a pressure of 9 in. w.g. It is equipped with anti-freezing apparatus and an automatically controlled connection to the surplus gas bleeder. Gas which is not required for under-firing the coke ovens or for use in the boiler plant, is diluted with producer gas to reduce its calorific value to 485 B.t.u. per cu. ft. so that it is suitable for distribution. The mixing device consists of a system of concentric perforated pipes arranged within the coke-oven gas main at its junction with the producer gas main, the latter having a ratio controller to proportion the amount of producer gas entering the coke-oven stream. The gas thus diluted is delivered to the dry purification plant by two Sirocco type motor driven, oil cooled booster fans, each of which is capable of delivering 380,000 cu. ft. of gas an hour, measured at 60°F. and 30 in. Hg, at an outlet pressure of 40 in. w.g. when the gas inlet pressure is 6 in. w.g. Only one fan is normally in operation, the other being a standby. The complete units are housed in the central byproduct plant building where there is provision for the addition of a third fan in the future. In the event of the gasholder falling below a predetermined level, the fan motors can be stopped immediately by an automatically controlled limit switch. Gas meter and boosters The volume of purified gas passing to the boosters is measured by a Holmes-Connersville positive displacement type meter, at which a constant pressure of gas is maintained. The normal capacity of the meter is 12.6 million cu. ft. a day which is sufficient to serve the present plant and its future extension. There are three Belliss and Morcom gas boosters, each capable of compressing 5.33 million cu. ft. of gas a day, measured at 60°F. and 30 in. Hg, and of delivering it at a pressure of 30 lb. per sq. in. These boosters are standard with the machines installed at other coking plants in the Durham Division. The boosters are the two-crank, single stage, double acting vertical type; two are motor driven and the third steam driven, the latter being complete with variable speed control gear. Each booster is equipped with an after-cooler having an area of some 650 sq. ft. In order to ensure that the gas passed for distribution is maintained at the declared calorific value, equipment for official testing is installed. This is accommodated in an annexe to the byproduct plant building. Byproduct plant building The central byproduct plant building houses the exhausters and all the principal machines serving the byproduct and benzole recovery plants. It is divided essentially into three sections. The main centre section accommodates the exhausters on an elevated platform, and, at the same level, a control room for the graphic flow panel which is described in detail later. The control room is totally enclosed and has heating and ventilating equipment to maintain the inside pressure at slightly more than atmospheric. It is glazed on two sides to afford maximum visibility of the exhausters and boosters. The main section also provides accommodation, at ground level, for the gas mains, the liquor flushing and other miscellaneous pumps, the Holmes-Connersville meter and the steam driven gas booster set. To the east of the centre section is the reinforced concrete plinth carrying the gas downcorner, the primary coolers and the detarrers. The underside of the plinth is enclosed to form separate rooms for pumps, starter switchboards, the detarrer rectifier sets, and washing facilities for the workmen. On the west side of the centre section there is a booster room which accommodates the motor driven booster sets, the gas fans and the air blowers for the dry purification plant. An enclosed space within this room is provided for the electric motors and control gear. Two hand operated cranes, each with a lifting capacity of 3 tons, are installed. An annexe on the north side of the centre section comprises the calorimeter room and the official gas testing station. The whole of the byproduct building is of reinforced concrete framed construction, the frames having been cast in situ. The upper portion of the centre section, on both north and south sides, has a pleasing external finish of primrose yellow Vitroslab panels with double lines of glazing to afford maximum light in the exhauster and control rooms. For the remainder of the building, red facing bricks have been used to provide an unembellished cladding completely enclosing all concrete columns. The control room has a cream coloured terrazzo floor, laid in squares with thin ebonite parting strips. The walls have cream tiled dados, and there is a false ceiling of acoustic panels accommodating the flush type lighting fittings. The floor of the wash room, and also the walls to a height of 6 ft. are surfaced with terrazzo, whilst the remaining rooms have floors surfaced with red unglazed tiles and walls finished with cream tiled dados. Benzole recovery The benzole recovery plant consists of equipment for the production of crude CS2-free benzole, and is designed to handle the full gas load after the extension of the coke-oven batteries. Benzole scrubbers. There are two benzole scrubbers, 11 ft. 6 in. in diameter and 106 ft. high, which normally operate in series although either can be bypassed if necessary. Each scrubber is complete with a receiving tank for the benzolised oil and the second scrubber is provided with an oil separator in the gas outlet line. Equipment for washing out the scrubbers, with either hot water or creosote, consists of an 8,000-gal. tank divided into two compartments, and a steam driven reciprocating pump of 5,000 gal. an hour capacity. The pump is designed for a variety of duties, either to pump the washing medium to the top of the scrubbers, or to deliver creosote oil to the larger compartment of the tank, or to extract the waste liquids for disposal. Wash oil treatment. The wash oil from the scrubbers, enriched with benzole, is passed through two vapour-to-oil heat exchangers in which heat is transferred from the crude benzole vapour leaving the wash oil still to the cold benzolised wash oil. The heat exchangers normally work in series but each is capable of being bypassed. The condensate is returned to the benzole scrubbers. The enriched wash oil is then steam heated in either of two final heaters before it enters the cast-iron wash oil still. The still, which is 6 ft. in diameter and deals with the whole of the wash oil, has a series of fourteen trays where the crude benzole is removed by intimate contact with steam. Working in conjunction with the wash oil still there is a wash oil purifier for conditioning the debenzolised wash oil, the residue being delivered to tank wagons. The hot oil from the still is pumped through a wash oil cooler and collected in a 5,000 gal. tank before recirculation to the scrubbers. The cooler is of the open type with sixteen banks of galvanised pipe so arranged that any one bank can be bypassed and steamed out if necessary. Five motor driven centrifugal wash oil circulating pumps are provided, two for pumping oil over the scrubbers, and one each to serve the distilling apparatus and the wash oil cooler, the remaining pump being a common standby. Each pump is capable of dealing with 10,000 gal. of oil an hour. There are two 10,000-gal. storage tanks, one for new wash oil and the other for used wash oil. Cooling, separation and CS2 removal. The crude benzole vapour passes from the still through the vapour-to-oil heat exchangers to the crude benzole cooler. This consists of eight banks of galvanised piping in which the benzole vapour is water-cooled and condensed. From the cooler the crude benzole is passed through a separator to remove the water, and thence into a 300-gal. running tank equipped with a liquid level controller acting on a 500-gal. an hour motor driven centrifugal pump delivering to the CS2 column. The CS2 still is cast iron with thirteen stripping sections in the lower portion and twenty-seven rectifying sections above, the whole surmounted by a reflux chamber. In the still, which is heated by an external vertical tubular type heater, CS2 is removed from the benzole which is then cooled and passed to a 12,000-gal. running tank divided into two compartments of equal capacity. In the event of a temporary shutdown of the CS2 still, the crude benzole can be returned by suction line from the running tank to the still. The crude CS2-free benzole is stored in two 50,000 gal. tanks with facilities for road and rail tank loading. The CS2 recovered in the still passes through a floating head type condenser to a decanter from which it flows to a 2,000-gal. drumming tank equipped with a steam coil. Concentrated ammonia liquor plant This automatically controlled plant, by R. and J. Dempster Limited, is designed for the production of crude concentrated ammonia liquor of 25 per cent strength from crude coke-oven ammonia liquor which can be dealt with at the rate of 2,500 gallons an hour. Two 150,000-gal. tanks are provided to store the coke-oven liquor, which is brought from the strong liquor compartment of the liquor sump, prior to its delivery to a 600-gal. feed tank. From this feed tank the liquor is delivered to a preheater by one of two motor driven, centrifugal, 3,000-gal.-an-hour feed pumps, the second pump being a standby. The rack-type preheater is virtually a vapour-to-liquor heat exchanger in which a certain proportion of the crude liquor is preheated before entering the dissociator, whilst at the same time the vapours from the still are partially condensed. The preheater also acts as a dephlegmator from which part of the condensate gravitates to the still head as reflux. The preheater consists of twenty-four concentric tubes which are arranged in two parallel banks of twelve, approximately 17 ft. long and connected by headers and return bends. The vapours flow through the inner tubes whilst the crude liquor passes in counter current direction through the annuli formed between the inner and outer tubes. The crude liquor, whether from the preheater or direct from the feed tank, is then passed through a liquor dissociator where the specific gravity of the concentrated liquor can be controlled at a predetermined value to avoid crystallisation. The dissociator, which is 6 ft. in diameter and of cast-iron construction, is equipped with five bubbling trays and a bottom section into which a controlled supply of open steam is introduced in order to remove the CO2. This gas is bled off and treated in a fume scrubber before passing to the primary coolers. Beneath the dissociator is the still proper, which is also of cast-iron construction but 8 ft. in diameter. It is of the loose tray type, with sixteen bubbling trays and a bottom section. The free ammonia is stripped from the crude liquor and passes as vapour from the still head to the preheater previously described. The hot effluent liquor from the base of the still gravitates to a 5,000-gal. sump, from which a proportion is pumped to the ammonia washers, the remainder passing through a natural draught cooling tower to the surplus effluent sump. For this purpose three motor driven centrifugal pumps are provided, one serving the ammonia washers, one serving the 36,000-gal. effluent sump, and the third acting as a common standby. The cooled effluent from the effluent sump is discharged at a controlled rate into the sewer. From the preheater the partially condensed ammonia vapours, and a proportion of the condensate, pass through the inner tubes of a vapour condenser, in counter-current to a flow of crude liquor through the annuli. The condenser is of similar construction to the preheater but has eighteen concentric tubes arranged in two parallel banks of nine. To cool the product of the condenser before feeding to the daily make tanks there is a rack-type cooler consisting of two parallel banks of eight cast-iron pipes 6 ft. long. The cooling medium is water which is sprayed from mild steel pipes over the racks and collected in a sump beneath. Two daily make tanks are provided, each having a capacity of 2,000 gal. of concentrated liquor. They are of cast-iron construction with a lining of acid resisting bricks. From these tanks the liquor is pumped to either of two 25,000-gal. storage tanks. The transfer pump is of the motor driven centrifugal type, capable of dealing with 8,000 gal. an hour, and is also used to deliver liquor from the storage tanks to a tubular loading column serving road and rail tankers. Water cooling and recirculation The water cooling plant consists of two independent closed recirculation systems, each complete with a cooling tower, cold wells and the necessary suction and delivery water piping. Circuit 'A' serves the primary gas coolers, the exhauster oil cooler, the gas booster jackets, the after-coolers and the air compressor cooling system, whilst circuit 'B' serves the secondary gas cooler, the ammonia liquor coolers, the crude benzole and wash oil coolers and the crude benzole condenser at the CS2 column. Make-up water for the two systems, as well as for other uses, is pretreated in a separate water treatment plant. The cooling towers are of the timber induced draught type, by Film Cooling Towers Limited, each comprising two independent cells so arranged that an additional cell can be added to each tower when the plant is extended. The two cells of system 'A' are capable of cooling 55,000 gal. of water an hour to a temperature of 78°F., whilst those of system 'B' can cool 50,000 gal. an hour to a temperature of 72°F., both with a wet bulb temperature of 64°F. Allowing for one cell of each tower being temporarily out of commission, the normal throughput can be maintained, though at slightly reduced efficiency. Each cell is 16 ft. square inside and 27 ft. 6 in. high, and is surmounted by a cylindrical funnel to accommodate the fan. The specially constructed filling consists of timber grids to form a series of 2 in. square cells and ensures that the water maintains its film formation throughout the entire depth of the stack. Cold air is induced through the cells by four-bladed, laminated hardwood impellers. The cold water pond provided beneath each tower is divided by concrete walls into three sections, one serving each existing cell and the third being designed to serve the future cell when it is erected. The two ponds have storage capacities of 41,000 and 38,000 gal. respectively for the two cooling systems. Five motor driven centrifugal vertical-spindle water pumps are provided for various duties. In circuit 'A' a pump of 55,000 gal. an hour capacity delivers water from the cold well to the apparatus, from which it is returned over the cooling cells partly by gravity and partly under pump pressure. A second pump is used for similar duties in circuit 'B', whilst a third acts as a common standby for both systems. In circuit 'B' a further pump is required to deliver a certain proportion of the water back to the cooling tower. This is water returned from the wash oil and crude benzole coolers and also from the oil-to-water heat exchangers serving the secondary gas cooler. It is collected in a hot well after first passing through one of two intercepting sumps where any oil in the water is decanted and run off into a separate oil compartment. From the hot well the water is delivered back over the cooling frame by a pump capable of dealing with 45,600 gal. an hour. A second pump of similar capacity is provided to serve as a standby. Electrical power and lighting The electrical distribution system for the coke oven and ancillary plant commences at two substations, one of which is located in the vicinity of the coal handling plant and serves the ovens and the coal and coke handling plants. The second substation is incorporated in the byproduct plant building and serves the whole of the byproduct plant, the N.C.B. administration block, workshop, laboratories and the purifying plant. The supply is brought into the sub-stations at 3.3-kV from the N.C.B.'s local power house switch room on the site. The main 3.3-kV gear in the substations is type LA 23T by Reyrolle and each sub-station has a single 750-kVA 3.3-kV/550-volt, 3-phase transformer. The low tension gear comprises Reyrolle type 'D1' and 'E7' circuit breakers which serve nine Belmos starter switchboards. All starter switchboards are inter-connected to provide an alternative supply to each switchboard in an emergency and for maintenance purposes. In general, motors averaging over 100 h.p. are connected to the 3.3-kV supply system, such motors being those for the gas fans, gas boosters, coal crusher, dust extraction fan and the rodmill. The coal and coke handling plants are arranged for automatic rocker sequence starting subsequent upon the ringing of bells which sound along the various conveyor gantries, etc. to give warning of the impending starting of the appropriate conveyors and other handling plant. In addition to control from the desks (described earlier on page 16), separate 'start' and 'stop' pushbuttons are provided at each motor position for local control, and each conveyor is provided with an emergency trip wire system which, when the trip wire is pulled, stops all the conveyors until the mechanism is manually reset. Electrical equipment on the oven machines is of Allen West manufacture and comprises series drum controllers and direct-on-line starters for the smaller drives, and master controller contactor gear for the large horsepower machines. The pusher machine is equipped with an armchair control unit from which the operator can control all the electric motors on this machine. The associated contactor gear is separately housed at the rear of the pusher control cabin. A fire alarm system is provided on the plant and incorporates a number of conventional type 'break glass' fire alarms which sound sirens. A separate annunciator panel in the byproduct plant control room indicates the area of the alarm. The alarm pushbutton stations are located adjacent to fire fighting equipment. The fire water pump can be started immediately from the control room upon receipt of an alarm. A steam standby fire-pump has also been provided. In general, motors are of the totally enclosed, fan cooled type of either G.E.C. or Met-Vic manufacture, all suitable for direct-on-line starting except the motors for the coal crushers and gas boosters which are slipring and synchronous machines respectively. The synchronous motors driving the gas boosters are by Mather & Platt, designed to run in conjunction with gas circulating fans and so interlocked that should the gas fan stop, the booster or boosters will shut down automatically. The lighting of the plant is from a separate 110-volt supply from 40-kVA transformers located at convenient distribution points about the plant. Most lighting fittings are of the tungsten filament type of Verity's manufacture. In a few instances, notably the byproduct plant and handling plant control rooms, the lighting fittings are of the fluorescent type by G.E.C. The floodlights at the ovens are supported from tubular columns of Tubewright Limited's manufacture. All road lighting is effected by the use of Revo 140 sodium discharge lantern fittings mounted on 25-ft. Stanton concrete columns. The gas purification plant The gas supplied to the gas grid is purified before compression and distribution. For this, oxide purifiers of the box-tray type, supplied by R. and J. Dempster Limited, have been provided. The purifiers consist of five welded-steel boxes built as one unit, each box containing 24 trays of oxide in six tiers. The boxes contain a total of 1,250 tons of oxide purification material, and have a maximum capacity of 10 million cubic feet of gas a day. Trays of oxide are handled by means of a 25-ton capacity Goliath Crane which is provided with an automatic lifting bale, so avoiding the need for manual attachment, or removal, of the crane hook to, or from, the trays. Conventional mobile oxide crushing, disintegrating and conveying equipment is also provided to assist in the treatment of oxide. Preheating of the gas is effected by means of a primary steam-heated gas heater and five secondary heaters (one for each box); automatic thermostatic controls are provided for each heater. In addition, means for temperature and humidity control are provided, consisting of 'open' steam supplied through calibrated valves, and water sprays attached to the inlet connection of each box. Indication of the pressure differential across the installation and the temperature change across each box is provided in the central control room; a local instrument panel is also available. A control building adjacent to the purifiers accommodates the instrument panel and a semi-portable oil-fired inert-gas generator, switchgear and pumps. The byproduct and benzole plants control The principal control system on the coking plant is that associated with the byproduct and benzole plants where a graphic panel some 40 ft. in length located in the byproduct building provides minute-by-minute information of the flow of coke-oven gas, producer gas, ammoniacal liquor, tar, benzole, wash oil, water, steam and air. Most of the operation of the plant is controlled from this centralised panel. The panel, which was designed by Woodall-Duckham and manufactured by Foxboro-Yoxall, consists of a central graphic section with wing panels at each end and employs some eighty controllers and recorders together with pilot indicator lights, alarm signals and other devices. On the graphic panel the representation is arranged horizontally with the main gas stream shown moving from left to right. Individual items of the plant are portrayed on the panel and the instruments and associated equipment are mounted at appropriate points relative to their functions. The various process lines are colour coded to denote the nature of the product flowing through them. Where there are alternative or standby units on the plant only one unit is shown on the panel but, to enable the operator to determine which unit is in operation, a system of tell-tale lights provides identification. The indicating and recording instruments are actuated by pneumatic signals received from field-mounted transmitters situated at the requisite measurement points on the plant. The panel-mounted controllers transmit set point signals to the actual control units located close to their associated control valves. In instances where a recorder is linked with a controller and functions as a control station the set point adjustment can be made from the front of the panel. The controllers are force balance instruments which respond instantly to the smallest changes in measurement and set pressures, and are capable of four-control action: proportional, proportional-derivative, proportional-reset and proportional-reset-derivative. The indicators use a red nylon ribbon behind a graduated glass scale to create a rising and falling column effect. The indicators, recorders and controllers are of the Foxboro-Yoxall Consotrol type. On either side of the graphic section of the panel two wings are arranged at a slight angle. The right hand one is provided, primarily, to present essential information required for budgetary control which falls outside the scope of the graphic presentation. In particular, instruments on this wing record steam pressures, and record and integrate steam flows. The left hand wing contains two key switch potentiometers, a multiple column mercury manometer, and an annunciator board which forms part of the comprehensive alarm systems. The potentiometers enable the operator to take additional temperature readings from points where continuous readings are not required, whilst the multiple columns of the manometer are arranged to demonstrate, in a clear and compact manner, the progressive changes of gas pressure in the gas purification system. These changes are recorded by pressure transmitters installed throughout the system. The annunciator board at the top of the left wing is designed to give audible and visual warnings when selected measurements depart from normal values. The warning consists of the ringing of an alarm bell which coincides with the appearance of flashing lights on the graphic panel and the relevant annunciator section, showing where the measurement has deviated. The pressing of an acknowledgment button by the operator silences the bell and switches the signal lights to steady, and when the necessary corrective action has been taken the panel and annunciator lights are automatically restored to normal. Every precaution has been taken in the design of this centralised control system to ensure the continued functioning of the instruments under all circumstances. The air supply system comprises an electrically driven air compressor and an air dryer, but there is also a steam driven standby set. Alarms on the panel are arranged to give adequate warning of an air pressure failure so that the standby set can be brought into action before any failure of the instruments commences. Alarms are also provided to denote excess humidity in the air leaving the dryer. Of equal importance is the electrical supply to the instruments, which is safeguarded by the provision of an automatically charged standby battery. Acknowledgments We wish to thank the National Coal Board, Durham Division for kindly allowing us to publish this article and Woodall-Duckham Construction Company Ltd, for providing the photographs and drawings. Drawings and Photographs accompanying the article
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||