Museum Entrance Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Coke and Gas - Main Index
Coke and Gas - Subject Index
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
August, 1959

The Murton Coking Plant

A detailed description of the National Coal Board's Durham Division works which is notable for its high degree of centralised automatic plant control.

The new Murton coking plant of the Durham Divisional Coal Board is part of the Board's scheme for a combined mine, washery and coke producing unit. Coal will be drawn from the Murton, Eppleton and Elemore Collieries at the new Hawthorn shaft, and subsequently cleaned in the washery before being passed to the coking plant.

The carbonising capacity of the plant is 1,000 tons of coal a day from which some 250,000 tons of high grade metallurgical coke will be produced yearly. Purified gas for the gas grid will be available at the rate of 7½ million cubic feet a day, and the byproduct plant will produce concentrated ammoniacal liquor, tar and about 1 million gallons of crude benzole annually. An outstanding feature of the plant is its advanced system of centralised instrumentation to assist operational control; there are three systems covering the whole of the coal and coke handling plants, the water and steam services, the tar, concentrated ammoniacal liquor and benzole recovery plants, the gas producer plant and gas purification and compression.

Main buildings and structures of the plant have been built on piled foundations as the site consists essentially of glacial drift.

Coal supply — the new Hawthorn shaft and washery

Coal for the coking plant will be drawn at the new Hawthorn shaft from which the planned output of 1.5 million tons of saleable coal per annum will be the highest in the country from a single shaft.

The new shaft is 22 ft. in diameter and 1,500 ft. deep and was sunk by the freezing process through water-bearing limestone. It will be served by two electric automatic winders drawing coal in 8-ton capacity skips from two levels at 1,070 and 1,430 ft. with locomotive haulage roads to the three satellite collieries. Some 18 miles of underground roadways will have been driven when the shaft comes into operation. Twenty-six 15-ton electric storage battery locomotives will haul the output to the new shaft in 2-ton capacity rise cars.

Surface equipment at the Murton, Eppleton and Elemore collieries has been modernised and these collieries will be used for manriding and supplies.

The new washery has a capacity of 750 tons of run-of-mine coal an hour. Coal over 1-16 in. in size is cleaned by dense medium separation in a Chance sand flotation washery; the minus 1-16 in. material is cleaned in a Unifloc froth flotation plant.

Raw coal from the Hawthorn shaft is screened at 1 in. and the oversize is treated in the primary Chance cone to produce clean coal, middlings and shale. The clean coal is loaded into wagons as graded coal after de-sanding and classification.

Four raw coal bunkers are provided to receive the 1-in, to 0 smalls in four categories, coking (low sulphur), coking (medium sulphur), high volatile gas coal and low volatile non-coking coal, which can either be blended in any required proportion to produce high grade coking smalls or washed separately. The whole of the 1-in, to 1-10-in. fraction is cleaned in a second Chance cone; the 1-16-in. undersize from the slurry screens is pumped into a 100 tons an hour froth flotation plant and after cleaning is dewatered, drum filtered and paddle mixed with the centrifuged washed smalls.

Tailings from the froth flotation plant are dewatered and the fines below 1/50-in. are thickened in two 92-ft 6-in, diameter thickeners and finally dewatered in filter presses.

Coal can be brought in from other collieries for washing if required and can be handled at the rate of 400 tons an hour.

The feed of raw coal into the storage bunkers is controlled from a central desk with a mimic indicating diagram. Clean graded coal is loaded over boom loaders in four sizes, 8 in. to 3 in., 3 in. to 2 in., 2 in. to 1 in., 1 in. to in., and washed smalls 1 in. to 0, or ½ in. to 0, are either loaded for outside sale or are conveyed direct to the coke-oven blending bunkers.

Movement of wagons and Wagontrolers and the weighing of the wagons are controlled from a central point. The Wagontrolers were installed by Nortons Tividale Ltd.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print