Museum
Museum
Friends of Durham Mining Museum
Events Calendar
Items for sale
Items for Sale
e-Books
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Logo
E-Book Prev Page Return to Index Next Page E-Book
/ Act \

Strata Control

44. Excessive or abnormal roof movements often cause emissions of gas into the workings, while a big fall of ground on a face or roadway may so impede ventilation that the normal margin of safety is reduced to a dangerous degree. Good strata control therefore, apart from its immediate importance as the means of preventing accidents from falls of ground is also an important factor in reducing the explosions risk. As we have already stressed in the case of ventilation, local managements should maintain close liaison with the specialist strata control engineers and should be in a position to call on their expert advice whenever required.

CONTROL OF "FIRST WEIGHTING"

45. It is well known that a new face moving off from the solid passes through a critical period of first roof weighting. Roof movement in the newly-formed waste is particularly liable in this period with consequent gas emission, and it is notable that several of the explosions we have examined have occurred when a face was passing through this phase.

46. Special steps should be taken to limit the effects of first weighting. The measures adopted will necessarily vary according to the conditions on the face, but in certain circumstances it would seem advantageous to provide, for some distance after a new face moves off, either solid or strip stowing or at least a solid pack right round the rib sides.

ROADWAY CAVITIES

47. The development of roof cavities in roadways, and especially at or near roadheads, is frequently sudden and unforeseeable. We do not undertake to advise how large roadway cavities may be avoided, other than by the consistent application of good strata control practice and especially the early setting of supports with a high measure of stability. The systematic setting of breaker props to reinforce the breaking-off line before the ripping shots are fired is a valuable precaution in appropriate cases. In addition, sound and sufficient support should at all times be provided for stable holes to minimize the tendency for any breaks that may form in the roof of the stable hole to extend into the roadhead. If, despite these precautions, a cavity does form, it may quickly become dangerously large unless prompt and suitable steps are taken to prevent its extension. It is essential, therefore, to deal with any cavity rapidly and effectively before it has time to extend. Whatever the measures adopted for the permanent treatment of a large cavity — and they will need to he selected according to the requirements of the particular case — prompt steps should always be taken as a form of first-aid treatment to support the roof and sides and to provide a positive means of ventilation. The job of supporting and disposing of a large cavity is frequently difficult and usually requires very careful planning and supervision; it may at times be necessary to give it priority and to stop all other work on the face until it has been dealt with.

PACK MAINTENANCE

48. Where intermediate packs are built, regular pack advancement is important. It is essential that these packs should be built of proper material. The aim should be to ensure that the packs are advanced systematically along the whole length of the face and that individual packs are not allowed to fall behind the general face line.

STANDARDS OF PRACTICE

49. While supervision should be such as to ensure that the various operations necessary to implement the prescribed system of roof control are duly and properly carried out, in the last analysis the effectiveness of strata control is largely in the hands of those engaged on the particular operations involved. They must appreciate their responsibility in this respect and, wherever practicable, should avoid practices likely to create cavities or unintentional voids where gas may collect. For one thing this means that in the first instance all the supports necessary to comply with the prescribed roof support and control system should be properly set as soon as possible, and that during support withdrawal operations all supports required by the management to he withdrawn should in fact be withdrawn.

 

Prev Page Return to Top of Page Next Page
mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print