National Coal Board
No. 2 Area — Durham Division
Herrington Colliery Reconstruction
The Pit Today:
The planned output is 3,000 tons per day raised, the estimated workable reserves from all seams 2' 0" thick and over in the combined take being 55,000,000 tons.
The seams available are:—
| Five Quarter | Dorothea only and now virtually exhausted. |
| Main Coal | Dorothea only and now virtually exhausted. |
| Maudlin | Now working - life 10 years. |
| Brass Thill | Now working. |
| Hutton | Not working at present. |
| Harvey | Now working. |
| Top Tilley | Partially — not yet developed. |
| Bottom Tilley | Partially — not yet developed. |
| Top Busty | Now working. |
| Bottom Busty | Not yet developed. |
Power Loading was introduced in September 1955, with double unit Longwall Conveyor Faces 150 yards long on either side, and since the preponderance of reserves lies in seams of 2' 6" or less in height it was decided to adopt the flight loading system.
The coals loaded into 2½ tons capacity mine cars are drawn by 100 h.p. diesel locos. to a central tipping point at the 980' B.O.D. level and loaded via an apron feeder into skip measuring pockets and thence to the 6 ton capacity skips in No. 1 Shaft and raised to the surface. In order to get the Dorothea coals to the central tipping point they are brought in tubs by main and tail haulage to a staple shaft adjacent to the Dorothea Shaft at the Brass Thill level and lowered by means of a 5' diameter spiral chute to the 980' B.O.D. level and loaded into the 2½ ton capacity mine cars. Coals from Herrington are hauled by 100 h.p. diesels in trains of 20—2½ ton mine cars along the 980' B.O.D. level which, owing to the dip of the seam proceeds along an almost level road in the Hutton Seam on which there are loading points for coals from the Maudlin and Brass Thill Seams.
At the surface the skips discharge automatically on to an apron feeder, and thence by conveyor to a point where the +5" coal is passed to a picking belt for hand cleaning and loading direct into wagons. The -5" run of mine coal is conveyed to either of the two storage bunkers (coking or non-coking) and from these the coals can be mixed to suit Marketing requirements before entering the Coal Preparation Plant in which 250 tons per hour from 5" to 0 sized coal is treated in a single washing box. The ¼" to ½ m.m. is centrifuged to get rid of the excess water, the m . m. to 0 is cleaned by Froth Flotation and the stone tailings from this are put through a filter press for disposal to waste heaps, or otherwise as filter cake.
After washing, the following sizes of coal are available: 5" to 3"; 3" to 2"; 2" to 1"; 1" to ½"; ½" to ¼"; to m.m.; ½ m.m. to 0. The three fractions below ½" are paddle mixed, and facilities are provided to mix this with any of the other washed products. Provision is made to receive coal by trucks from other pits into the washery either for washing or blending purposes.
Man riding, supplies and stones are all dealt with at the No. 2 Upcast Shaft at the 980' B.O.D. level, 25 men in each of two decks riding at one time or one car in each of two decks, supplies for the mine being loaded into the 2½ ton capacity stone cars.
The shaft cages are suitable for dealing with both the larger 2½ ton coal mine cars as well as the smaller stone cars in order that the mine cars can be taken tc the surface for repairing.
Upon reaching the surface, stones are elevated in a Mitchell Hoist to a 12 ton capacity stone bunker and tipped into 12 ton Foden 100 h.p. diesel dumpers for carrying to existing stone tips, and these dumpers are also used to deal similarly with the refuse from the Washery.