The following table shows comparative figures on various items of interest before and after the installation (as at Dec. 1958).
| Number of Men employed: | Before | After |
| Face | 573 | 739 |
| Elsewhere Underground | 860 | 750 |
| Surface | 329 | 252 |
| | 1,762 | 1,741 |
| Manshifts Per 1,000 Tons Saleable |
| Surface: |
| Winding and Banking | 33 | 11 |
| Traffic | 7 | 9 |
| Coal Preparation | 73 | 13 |
| Power | 13 | 4 |
| Maintenance | 33 | 28 |
| Other Surface Labour | 44 | 42 |
| Total Surface: | 203 | 107 |
| |
| Output Per Manshifts (Cwts.): |
| Face | 53.7 | 62.6 |
| Total Underground | 21.5 | 31.1 |
| Total Pit | 17.7 | 26.7 |
| Average Daily Output - Raised and Weighed | 1,590 tons | 2,650 tons |
| Percentage Saleable | 91.3 | 87.6 |
| |
| Shaft Data: |
| Winding Period | 118 secs. | 65 secs. |
| Capacity of Cage - 1 skip | 2 tons 11 cwts. | 6 tons |
| Shaft Capacity - tons per hour | 80 | 330 |
| Diameter of No. 1 Shaft (Now Skip) | 14' | 14' |
| Diameter of No. 2 Shaft (Now Men and Materials) | 15' | 15' |
| Diameter of Dorothea Shaft | 12' | 12' |
| Diameter of Winding Rope No. 1 | 1½"L.L. | 1 5/8 "L.C. |
| Depth of No. 1 Shaft | 1,337' | 1,337' |
| Average time in shaft - seconds | 68 | 45 |
| Decking/Loading skips - seconds | 25 | 10 |
| Decking/Emptying skips - seconds | 25 | 10 |