36 When all the victims had been recovered, rescue teams were deployed to obtain mine air samples at selected points in the affected workings. The samples from the outbye end of B 05's return heading indicated the possibility of continuing fire activity in the area. This possibility, together with the observed deterioration of the collapsed B 01's junction in the Meltonfield return — through which all the rescue teams were required to pass — made recovery operations so hazardous that all the interested parties reached unanimous agreement that the affected workings should be sealed off.
37 Following an inspection by representatives of management, trade unions and HM Inspectorate of Mines and Quarries, suitable sites were selected for the construction of seals and these are shown on Plan No. 2.
38 The construction of the two pumped gypsum seals proceeded satisfactorily and without incident. On completion of the seals and the balancing of the ventilation pressures, the workings were evacuated for 24 hours. Subsequent inspections by rescue brigades and representatives of the interested parties were made before normal working was resumed in the unaffected parts of Houghton Main and the interconnecting Grimethorpe Colliery.