9 The Meltonfield seam averages 50 inches in thickness with a shale roof and fireclay floor. The seam gradients are indicated on Plan No. 3.
10 Access to the Meltonfield seam was by cross measure and inseam drivages from existing workings in the Beamshaw horizon. Two longwall advancing faces B 01's and B 02's had been worked between September 1972 and October 1974. B 04's district, which commenced production in October 1974, was to cease production on 13 June 1975, having by then been reduced in length to 94 yards by fault encroachment. This face was to be replaced by E 21's district in the Newhill seam. Salvage operations were in progress on B 02's district where rails were being recovered from the maingate via scourings driven through the ribside pack of B 04's tailgate.
11 B 04's district was a longwall advancing single unit equipped with powered supports. Coal was mined by a ranging drum shearer and a tailgate elimination shearer. The maingate was formed as an advance heading some 10 to 15 yards ahead of the face line by blasting and mechanical loading of the debris.
12 B 05's development district comprised two headings which were extensions of the Meltonfield main intake and return airways. Both headings were in solid coal and stone and were supported by 13 feet wide and 9 feet high arch girders lagged with corrugated steel sheets. The main intake heading had been driven a distance of 51 yards beyond B 04's maingate and was not positively ventilated. It was intended to re-equip and restart this heading at an early date. A road heading machine had been used to drive B 05's return heading a distance of 401 yards and the heading had been stopped almost three weeks prior to the accident. The belt conveyor in this heading had been partially dismantled and the road heading machine was partly stripped down and had been flitted back to a point some 150 yards from the junction with B 04's maingate. This heading had been driven through a faulted zone on the left flank of B 04's maingate in an area where the measures had commenced to rise. (See Plan No. 3). At 170 yards from B 04's junction B 05's tailgate had been driven a distance of 220 yards from B 05's return heading. This heading was unventilated and was sealed by a concrete block wall.
13 The Newhill seam is 6 feet 6 inches thick and lies some 98 feet above the Meltonfield seam. Access to this seam had been gained by driving a pair of 1 in S rising drifts off the Meltonfield main airways. (See Plan No. 2). Workings in the Newhill seam had been developed from these drifts. A longwall advancing powered support face, fully mechanised and 145 yards long, had been opened out and equipped. This had encountered adverse roof conditions associated with water breaking in at the maingate roadhead where a large cavity had formed. Repair work was in progress and preparations were being made to fill this cavity with fly ash. There was some evidence that difficulty was experienced by officials in testing for firedamp at the top of the cavity because no suitable equipment was available in the district. It was intended that the face should commence production on Monday 16 June 1975 to replace B 04's face in the Meltonfield seam. Prior to the accident, four shears, representing an advance of 5 feet 6 inches, had been taken from this face in an attempt to advance the maingate roadhead into competent strata.