The 10 East District
6. Plan No. 1 shows the 10 East District, which lies in the Top Haigh Moor seam on the East side of the South West Haulage Road connecting the No. 2 shaft to the Haw Park shaft. The inset to this plan shows on a larger scale the ventilation layout of 5's Unit in which the explosion occurred. Plan No. 2 shows 5's Unit in detail, as it appeared after the explosion.
Recent Development And Working Of The District
7. The Haigh Moor seam at Walton Colliery appears as two leaves, each about 3 feet thick, of which only the upper, or Top Haigh Moor seam, is worked in the 10 East District. The two coals are separated by a band of hard fireclay about 7 feet thick and the Top Haigh Moor seam is overlain by a thick bed of strong sandstone. The depth from the surface is about 460 yards where the accident occurred. Faults had been encountered in 10 East District in 1955 and further development there had taken the form of driving two roads 22 yards apart through the faulted area to develop a longwall face, 40 yards long and known as 10 East 1's, which was advanced to the boundary then stopped on the 23rd July, 1958, leaving solid coal on each side.
8. Two faces were then worked north and south respectively from this development. The first of these faces, 10 East 2's, was stopped at faults in February, 1959, and at the time of the accident its old loader gate was being continued as a stone drift, known as 2's Drift, through those faults. This drift was intended to form part of a new main return airway for 10 East District.
9. Coal to the south of the 10 East Trunk Conveyor Road was intended to be worked by a double unit longwall face about 280 yards long, advancing to the south. In the general plan of operations a face, the second to be worked from 1's Development, was taken some 20 yards wide for a distance of about 40 yards to the south. The western side of the new development was then to be worked as a face 40 yards wide and advanced for about 100 yards to the west to connect with a heading known as 5's New Loader Gate, which was being simultaneously driven to the south from a point further outbye on 10 East Trunk Conveyor Road. The face was then to be continued westward so that eventually a double unit face about 280 yards long would be advanced to the south, after 2's Drift had afforded a new return airway for the district.
10. At the time of the explosion the 40 yards face, known as 5's Unit, had advanced about 97 yards. A small further advance, which would have been made in a few days but for the explosion, would have brought it to the position where it could have been stopped to await the connection with the New Loader Gate. At the right (or north) end of the working face the roof was ripped to form a road supported by steel arch girders 12 feet wide by 8 feet high. This road, known as 5's Intake Gate, was intended to become the return airway for the right (or western) unit of the 280 yard face when it was finally developed. It was connected to 10 East Trunk Conveyor Road by means of 5's Intake Slit, which was a passage some 37 feet long that had originally been made about 6 feet wide and about the height of the seam.
11. At the left (or south) end of the 40 yard face, a passageway of seam height and some 12 feet wide, as shown in the sectional view inset on Plan No. 2, was being left so that it could eventually become the left side of the main longwall face to the south. This passageway, known as 5's Ribside, was formed by the coal and by a pack about 12 feet wide; at the outbye end of this pack a gap some 9 yards long had been left affording access to the waste, which had not closed but in which thin slabs of stone had fallen from time to time. A bottom loading belt conveyor in this passageway carried coal from 5's Face to a similar conveyor on 5's Belt (or Return) Gate; the latter conveyor discharged on to the 10 East Trunk Conveyor at the same transfer point as the stone loading conveyor from 2's Drift
12. In the planned system of ventilation air entered 10 East District from the South West Haulage Road, partly along 10 East Main Haulage Road and partly from a second source some 400 yards nearer to the Haw Park Shaft. These two air currents joined inbye the Loading Point and then took the course to and from 5's Unit shown on Plan No. 1. This course was on conventional lines, but because of heavy leakage losses beyond the Loading Point only a small proportion of the 12-16,000 cubic feet of air per minute available there reached the face of 5's Unit. A few days before the accident, a direct connection had been made by means of a scour driven through the waste between 5's Intake and 5's Return but sheets had been erected in it to prevent short circuit of the ventilation there.