II. General Information
5. Ingham Colliery is situated within the boundaries and on the south side of the County Borough of Dewsbury in West Yorkshire, and has been producing coal since about 1860. It is connected underground to Combs Colliery and there is also a surface connection by a tramway along which the coal produced at Combs is hauled to the screening plant at Ingham. Part of the underground ventilation system is common to both mines. Despite their surface and underground connections and the partly common system of ventilation, Ingham and Combs are worked as separate mines, being divided by properly delineated boundaries, under Section 25 of the Coal Mines Act, 1911.
6. At Ingham Colliery there are two coal winding shafts, the No. 1 downcast, 13 feet in diameter, and the No. 2 upcast, 14 feet in diameter. Both shafts were sunk to the Black Bed Seam at a depth of 277 yards, and each has an inset at 188 yards in the Beeston Seam. An output of 180 tons from the Black Bed and Blocking Bed Seams was wound daily from the Black Bed level in No. 1 shaft, and an output of 450 tons from the Beeston and Wheatley Lime Seams was wound daily from the Beeston Seam inset in the No. 2 shaft, giving a total daily output for the colliery of 630 tons, 80 per cent, of which went to the coke ovens. The Wheatley Lime Seam has been worked for the past 85 years so that its characteristics were well known. It yields a coal for coking and industrial use.
7. At Combs Colliery the downcast shaft is 11 feet in diameter and is sunk to the Black Bed Seam at a depth of 369 yards. The daily output from this shaft is about 140 tons per day. From an inset in this shaft in the Beeston Seam at a depth of 224 yards, a road driven in the seam forms the intake for the No. 2 South District, Wheatley Lime Seam, Ingham Colliery — the district in which the explosion occurred. There is also a pumping shaft at Combs, 12 feet 6 inches in diameter, sunk to the New Hards Seam, at a depth of 106 yards, from which there is a connection to a staple pit sunk to the Blocking Bed Seam. These water pits are not used in connection with the working of the mine, apart from drainage purposes.
8. The ventilation was produced by a steam-driven Walker fan, 7 feet in diameter, situated on the surface at the Ingham upcast shaft, and passing 140,000 cubic feet of air per minute at a water gauge of 3.6 inches. Safety lamps were used throughout. The types of lamp provided for general underground use were Ceag 2-volt electric cap lamps and Ceag 4-volt electric hand lamps. For gas testing, the workmen were issued with Davis-Kirkby flame safety lamps, magnetically locked, and the officials used the Prestwich type No. 6 flame safety lamps, fitted with internal relighters and lead rivet locks. To meet the requirements of the General Regulations in respect of precautions. against coal dust, and to facilitate systematic cleaning-up, stone-dusting and sampling, the roadways were apportioned in numbered zones. Gypsum dust was used for stone dusting throughout the colliery. The amount used was a little over 2½ lb. per ton of coal output.
9. The Agent and Manager of Ingham Colliery was Mr. E. E. Cleaver. The Under-manager for the No. 1 Pit was Mr. C. Walshaw, and for No. 2 Pit, Mr. B. Aston. Mr. Cleaver was also agent for Combs Colliery, which had a separate manager but no under-manager. There were no overmen at either colliery, the deputies coming directly under the under-manager. Mr. Cleaver came under the direction of the Area General Manager, Mr. J. Scoular who, in turn, came under Mr. H. M. Hudspeth, the Deputy Production Director and Mr. J. Hunter, Production Director for the North Eastern Division of the National Coal Board.
10. It is perhaps proper to recall that there is a history of firedamp in this area for, in the year 1893, an explosion of firedamp occurred at the bottom of the Combs downcast shaft, by which 139 persons lost their lives. The shaft was then sunk only to the Blocking Bed Coal at a depth of 165 yards; but the seam being worked at the time was the Wheatley Lime, which was entered from an inset 34 yards higher up the shaft across which a wooden staging had been fixed, leaving a four-foot space at one side for the passage of air down to the Blocking Bed seam. Safety lamps were used throughout, except in the immediate vicinity of the shaft where six open paraffin lamps were used to illuminate the shaft inset. A joint report on this disaster was made by the late Mr. F. N. Wardell, H.M. District Inspector and the late Sir Henry Hall, who concluded that firedamp accumulated below the staging and communicated with a feeder of firedamp behind the brick shaft walling. The gas was ignited by one of the open paraffin lamps. The explosion was mild and not extensive. The heavy death roll resulted from suffocation by smoke from the wooden fittings in the shaft and the wooden staging at the Wheatley Lime seam inset, which had been set on fire by the explosion. The shaft passed through a fault and an attempt had previously been made to pipe the gas made there to light the inset. Gas had, however, been ignited at this point some months before the explosion.
11. The area of coal in the Wheatley Lime Seam in which the present explosion occurred was opened out some years ago from two stone drifts driven from the Beeston Seam, through a 40 yards downthrow fault. One drift was driven at an inclination of 1 in 7 in line with, and as a continuation of, the Evison Bord in the Beeston Seam, and this roadway was used as a return airway, travelling and haulage road to the workings in the Wheatley Lime Seam. The other drift, which was used as the intake airway, was driven at an inclination of 1 in 2. The extent of the workings in this area from that time until the explosion is shown in Plan No. 2.
12. The seam is 2 ft. 11 ins, thick and the immediate roof is a strong bind with well-defined bedding planes. The floor is a hard fireclay. The only district working at the time was the No. 2 South. The method of working was advancing longwall with gates at each extremity of the face, which served as the intake and return airways. Three dummy gates were also driven to provide material to pack the waste. The face at the time of the explosion was 140 yards in length. The coal was undercut by longwall coal cutters to a depth of 4 ft. 6 ins, and was loaded on to a face conveyor which discharged to a conveyor in the return gate known as South 2 Conveyor Gate. Belt conveyors in tandem in this gate delivered the coal to a conveyor on the main haulage road which discharged the coal into tubs at a loading point near the top of the 1 in 7 drift. From this point the coal was hauled to the No. 2 upcast shaft in tubs of 4½ and 6½ cwt. capacity by an endless-rope haulage running at 1½ miles per hour. The first 1500 yards of this haulage road was the Evison Bord, including the 1 in 7 drift. Then, 500 yards from the shaft the haulage passed round a right-angle bend into the South Ending, where it received coal coining from the South Districts in the Beeston Seam. Thus the haulage and conveyor roads were all in the return airway, which was also the travelling road into the No. 2 South District, The deputies' meeting station (see Plan No. 2) was near the top of the 1 in 7 drift and was also in the return airway. Throughout the district, the conditions generally were slightly damp and water collected at certain parts and had to be pumped outbye. Electricity was used for operating coal-cutters, conveyors, pumps, drills for coal and stone, signalling system and for the telephone circuit, which extended almost to the working face.
13. As previously indicated, the intake air to the No. 2 South District came from the Combs shaft by way of a roadway in the Beeston Seam. This roadway, although small in parts was, nevertheless, well regulated. The intake air then passed up the 1 in 2 drift parallel to the 1 in 7 return drift through the 40-yard fault and thus entered the Wheatley Lime Seam. A statutory air measurement taken at the top of the intake drift on 26th August, 1947, a fortnight before the explosion, showed 15,500 cubic feet of air per minute to be entering the district. Other air measurements, however, showed that of this quantity only 5,950 cubic feet reached the face of No. 2 South, so that leakages — which occurred mainly at three points — were very heavy and will be referred to later in more detail.
14. On the 5th June, 1947, the No. 2 South Face was 185 yards in length. At that time the right hand side of the face extended 30 yards beyond the No. 2 South Conveyor Gate to a fault (which was being stripped at that time). The left side of the face extended for a shorter distance beyond the intake airway tail gate. In this 30 yards of face between the No. 2 South Conveyor Gate and the fault, a subsidiary tail gate was packed 9 yards from the fault side. On the 5th June, 1947, when the third and last of a series of ripping shots was being fired in this subsidiary tail gate, firedamp was ignited in a break which crossed the shot-hole. and the flame passed 64 yards back along the side of the fault. In consequence, the face was shortened in order to concentrate and improve the ventilation, and a 9-inch brick wall, with a two yard dirt pack on the outside of it, was built in the crossgate to seal off the subsidiary tail gate. The ignition of gas was investigated at the time by H.M. Inspectors of Mines and Officers of the Safety in Mines Research and Testing Branch. Following the present explosion, which blew the 9-inch brick stopping and the two-yard pack inwards towards the fault, the locality was again inspected by the same investigators to see if the previous ignition of gas had any bearing on the present explosion, but it was considered that there was no connection between the two events.