Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Report

to

The Right Honourable The Secretary Of State For The
Home Department

on

The circumstances attending an Explosion which occurred at
the Hyde Colliery on the 18th January, 1889.

by

W. N. Atkinson, Esq.,

One Of H.M. Inspectors Of Mines.

Stafford, 4th April, 1889.

Sir,

According to your instructions, I have the honour to transmit to you the following special report on the explosion which took place at Hyde Colliery on the 18th January 1889.

The explosion occurred about 9.30 a.m., and caused the death of 23 men and boys. I did not hear of it until I returned to Stafford, in the evening, from another part of the district. On reaching the colliery, about 10 p.m., I found that the recovery of the bodies of the dead had just been completed.

I reported the accident to you by telegraph next morning, and requested that I might be assisted, in the investigation of the explosion, by Mr. Jos. Dickinson, the Inspector of Mines for the Manchester district. You were good enough to comply with this request, and Mr. Dickinson rendered valuable assistance, both in exploring the mine and afterwards at the inquest. Mr. Sawyer, the Inspector of Mines assisting in the North Stafford district, also carefully investigated the explosion, assisted at the inquest, and gave evidence.

The inquest was opened by Mr. T. W. Johnson, Deputy Coroner for the Stockport and Hyde Magisterial Division of the County of Chester, on the 19th January. Evidence was then taken to identify the bodies, and the inquest adjourned. It was continued on the 7th, 8th, and 13th February. At the close of the inquiry, the jury returned a verdict that the deaths were caused by "asphyxia or suffocation from the after-damp, caused by an explosion of fire-damp in the Two-feet mine of the Hyde Lane Colliery on the 18th January 1889, and that such explosion was purely accidental."

At the inquest the owners of the colliery were represented by Mr. Ellis, solicitor, Wigan; and Mr. Broadbent, solicitor, Ashton, appeared for the Miners’ National Association and the relatives of the deceased.

A verbatim report of the proceedings at the adjourned inquest is annexed to this report, and also plans and sections of the colliery, so far as they are necessary to elucidate the account of the explosion.

Hyde Colliery is situated in the Borough of Hyde, in the County of Cheshire, and lies about seven miles east of Manchester. The owners are Messrs. J. W. and J. N. Sidebotham. The colliery is worked by means of two shafts. The downcast shaft is 272 yards deep, and 12½ feet in diameter. It is used for drawing coal, pumping water, and for the descent and ascent of workmen. The upcast shaft, 20 yards north of the downcast shaft, is 222 yards deep and 8 feet in diameter. It is ordinarily used exclusively for ventilation, but men can be raised up it if necessary. The strata pierced by the shafts lie at an inclination of about 28°, or 19".14 per yard. or 1 in 1.88 dipping to the N.W. (see sections 1 and 2). As the surface in the vicinity is approximately level, it follows that the depth to any particular bed varies greatly within the area of the workings of the colliery. Three seams of coal are worked. In descending order they are as follows: the Two-feet mine, in which the explosion occurred the Peacock mine, lying 14 yards below it; and the Third mine, about 50 yards below the Peacock mine. The ventilating power is a furnace placed near the bottom of the upcast shaft in a short tunnel or stone drift. The furnace is fed partly by fresh air, and partly by air passing round a small district of the Third mine, to the rise of the shafts. The return air from the Two-feet and Peacock mines enters the upcast shaft 26 yards above the furnace by a dumb drift.

The district in the Two-feet mine, where the explosion took place, is approached from the downcast shaft by a level tunnel leaving that shaft at a point 272 yards from the surface, and about 55 yards below the position of the Two-feet seam in the shaft; 36 yards from the shaft a metal brow or dip stone drift 209 yards long leaves the tunnel at right-angles and cuts the Two-feet seam. This metal brow is driven in the direction of the dip of the measures, but at an angle of 22¾° only, (section 1); it is the intake air-way and haulage road or engine brow for the workings in progress in the Two-feet and Peacock mines. From the point where the metal brow cuts the Twofeet seam, the haulage road is continued in the same line in the Two-feet seam for about 120 yards, and from thence a pair of levels were being driven to win out a new district below that in which the explosion occurred. These workings were not affected by the explosion. Returning to the point where the metal brow cuts the Two-feet seam, three main levels had been driven to the S.W. for a distance of about 1,150 yards (see Plan 1). The middle level, called the horse level, was used for the haulage of coal by horses, and, for 650 yards from the metal brow was the intake air-way. At that distance the air was diverted by doors into the low level, and passed along it to the working face at the far end. The low level was also known as the "deep" or "lodge" level, and was used as a watercourse. The upper or "counter" level was, for some distance used as a return air-way. About 150 yards from the extremity of these levels an inclined road, known as the Far Jig Brow, was driven on the full rise of the seam, and from it levels had been driven to the right and left. Three hundred yards further out than the Far Jig Brow a similar incline road had been driven, and was called No. 1 Jig Brow. Levels were in the course of being driven to the right and left of this Jig Brow. For purposes of ventilation "slits" or "thrills" were driven between the levels, as shown on plans. Midway between No. 1 Jig Brow and the Far Jig Brow, another brow, known as the New Brow, was in course of preparation; this being at the extremity of the levels driven outward from the Far Jig Brow. The two upper levels driven inward from No. 1 Jig Brow had, shortly before the explosion been connected with the New Brow. The levels were known by numbers. No. 1 was the horse level, the next above it was No. 2, and so on to No. 10, which was the top level in the Far Jig Brow. No. 9 was the top level in No. 1 Jig Brow. The levels were driven 9 feet wide, The bottom stone was taken up on the high side in order to form a level road for the tramway; the stone so removed was formed into a pack wall 4½ feet thick along the low side of the levels, thus reducing the available width from 9 feet to 4½ feet (see section 3). The levels out of the-Far Jig Brow had been driven as far as was desired, and the coal between them was in course of removal at the far end. The two upper pillars of coal were left for reasons having no hearing on the explosion. The goaf, or space from which all coal had been extracted, was about one statute acre in area.

From the working faces-the loaded tubs were shoved by waggoners along the levels to the jig brows. They were lowered down the jig brows to the horse level, one at a time, by a wire rope. The rope passed round a drum at the top of the jig brow, and was attached at its other end to a counterbalance running on a line of rails at the side of the brow. This balance weight was so arranged that while the loaded tub passing down the brow was able to draw the balance weight up the brow, the balance weight in turn was able on its descent to draw an empty tub up the brow. The coal filled in the lowest level was drawn up a "turn brow" by means of a winch or turnroll to the horse level.

In removing the pillars the face of work was kept nearest the jig brow in the highest level and more remote in each succeeding level below, so that the working faces of the pillars of coal were en echelon. An air-way was maintained along this serrated face by timbering and pack walls. It was maintained across the working face of each pillar by timber, which was withdrawn as the face advanced, leaving the roof in the goaf to fall. In order to maintain the airway from the top corner of one pillar, to the low corner of the pillar above, a pack-wall, 6 feet thick, formed of stones from the goaf, was formed in a line with the low side of the high pillar, and kept up to within from 3 to 5 feet of the face of that pillar (see plan 3). It was also necessary, in order to maintain a continuous air-way across the face, to make holes at frequent intervals through the pack walls built on the low sides of the levels when they were driven. These holes were made about 3 yards apart.

The ventilating current was conducted from the downcast shaft down the engine brow, and along the horse level nearly as far as the No. 1 Jig Brow. Here it was diverted by doors into the low or "lodge" level. A small portion of air scaled through the doors on the horse level and ascended No. 1 Jig Brow, where it rejoined the main current. The main current passed along the low level to the working face and goaf edge, and then passed up the face to No. 8 level, or the highest part of the goaf. The current then passed outward along No. 8 level, and up slits or thrills to No. 10 level. On this level it continued outward until it arrived at the top of the New Brow. Here it divided, a portion continuing on the level course along Nos. 8 and 9 levels towards No. 1 Jig Brow, by passing through regulating sheets on those levels. The remainder passed down the New Brow to No. 6 level. Between No. 6 level and No. 5 level the formation of the New Brow was not completed. There was only a hole about 9 inches in diameter. Some of the air passed through this hole and the remainder had to make a considerable detour along No. 6 level, and back by No. 5 level, in order to regain the New Brow below the hole. The current thus re-united continued down the New Brow to the counter level (No. 2). It passed outward along that level till it reached the workings in progress from No. 1 Jig Brow; there passed upward, ventilating the workings on the inbye side of that brow to No. 8 level. Here it was diverted inward to the third thrill, up which it passed to No. 9 level, there rejoining the air which had passed through the regulating sheets previously mentioned. The united current then passed outward along No. 9 level, and ventilated the workings on the outbye side of No. 1 Jig Brow. Finally it reached the counter level (No. 2) and proceeded to the upcast shaft without passing over any more men or workings.

The quantity of air passing along the horse level into the district of the explosion was measured (after the explosion) on the 31st January, and found to be 5,400 cubic feet per minute. This measurement was made near the outer end of the horse level, beyond where a split of air passes through a tunnel into the Peacock mine. The quantity was probably not far different from the average quantity passing before the explosion, although it had then been measured by the colliery officials as 6,000 cubic feet per minute. About 3,000. cubic feet per minute reached the workings at the far end; the remainder, scaling through doors and stoppings, served a useful, purpose in ventilating the inner part of the horse level and the jig brows.

The Two-feet seam at Hyde Colliery was regarded as a non-fiery seam, and was worked with naked lights. Blasting with explosives was not resorted to, because it was not necessary. From the evidence, both of the officials and workmen, traces of gas had very rarely been observed. That the seam, in the deeper workings, made some gas, was proved by the fact that it could be heard bubbling through water in the low level; but it could not be detected on the lamp there.

The workings, as a whole, could not be termed dry and dusty. It was damp or wet m some parts, and dry and dusty in others. The deep level was wet for its entire length. The horse level was damp or wet in some places and dry in others, but there was no appreciable amount of coal dust on it as far as the Far Jig Brow. The counter level or return air-way was considerably dryer than the horse level, but it was free from coal dust. No. 1 Jig Brow and all the workings out of it were damp. The New Brow was damp, and this dampness extended for some yards along all the levels on its inbye side. The Far Jig Brow was dry from the bottom nearly to the top. On this brow there was much coal dust, caused by the jigging of the coals down it. The levels on the inbye side of this brow were all dry except the top one, which was damp. The levels on the outbye side of this brow were also dry, except the top one, which was damp. The others were dry for at least two-thirds of their length. Next the New Brow they were damp, as stated above. The two upper levels connecting No. 1 Jig Brow with the New Brow were damp. The dampness of the upper levels was probably due to moisture permeating the strata from the old workings above. The coal dust in the dry levels was more or less mixed with stone dust. It was not nearly so pure or plentiful there as on the Far Jig Brow.

 

Prev Page Return to Top of Page Next Page


A copy of this report was kindly donated by
West Cumbria Mines Research.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z