I. Description Of The Colliery And Method Of Working.
(e) Underground Haulage. — The coal was hauled along the main haulage roads on the endless-rope system, the rope being electrically driven. Where coal was worked to the rise, it was jigged down from the face to the cross roads or main roads. No horses or ponies were employed in the mine. All the main haulage roads in the No. 3 mine, with the exception of the Down-Brow Yard seam, were in the return airways. The ventilation of this pit being carried out by means of a forcing fan in the intake, the mouthing at the No. 3 (upcast) shaft was unencumbered. The fact of the return airways having been used as main haulage roads is of importance, and will be referred to hereafter.
(f) Mechanical Coal Cutting. — The only part of the No. 3 pit in which mechanical coal-cutting was practised was at the Nos. 1 and 2 faces of the North Plodder. The cutters were of the bar type and were electrically driven. All cutting was carried out during the night shift, and the breaking down and filling away of the coal so cut was done during the morning shift, the mechanical conveyor, also electrically driven, being worked during the latter period. The conveyor at the No. 2 face of the North Plodder was merely a bogey which was hauled along the face by hand. The electrically driven conveyor was that at the No. 1 face. It was of the Gibb type.
(g) Use of Electricity. — A large electrical power plant is stationed between the Nos. 3 and No. 4 shifts, and serves all the mine groups comprising the colliery. The plant is capable of generating 2,500 h.p., the power being generated and transmitted as three phase current at a pressure of 2,500 volts. The exhaust steam from the winding engine is used to supply the turbines which drive the generators. At each pit the current is transformed down to medium pressure for use in the workings.
Thus, at the Nos. 3 and 4 pits the current was conveyed down the shafts at 465 volts, there being two separate cables carried down No. 4 shaft and two cables down No. 3 shaft to the Yard seam. There were, in addition, in each shaft other cables which carried current to the Trencherbone and Arley seams.
Electricity was in use in the Yard seam level at the shaft sidings in the neighbourhood of the downcast shaft and in two of the five main districts, viz., the Bottom Yard (two electrically driven pumps) and the North Plodder (haulage, coal cutters, and coal conveyor). There was also a motor in course of erection in the South Plodder section, but it had not been set to work at the time of the explosion and the cable to it had never been made live.
At the downcast No. 4 shaft bottom were two distribution boards by which the supply of current to the various motors was controlled. The following motors were installed close to the downcast shaft bottom in the Yard seam ( see Fig. 2):-
(A) A 45-h.p. slip ring motor driving a ventilating fan
(B) An 80-h.p. squirrel cage motor driving main rope haulage.
Apart from the above, the only motor actually in the Yard seam was (C), an SO-h.p. motor, driving a three-throw pump. This motor was situated about 180 yards from the downcast shaft bottom.
In the North Plodder seam, or in the drift leading thereto, were the following motors
(D) A squirrel cage motor of 22-h.p. driving a coal conveyor, the motor being fixed about 40 yards down the jig.
(E) A 20-h.p. squirrel cage motor driving coal cutter No. 1.
(F) A 20-h.p. squirrel cage motor driving coal cutter No. 2.
(G) A 30-h.p. slip ring motor driving an endless rope haulage.
(H) An 8-h.p. slip ring motor, the slip rings being short circuited, driving a haulage.
(I) A 5-h.p. squirrel cage motor driving an electric fan.
In addition to the above, there were 60 or 70 lamps at and near the shaft bottom, 16 lamps near motor C, and 4 lamps near motor G.
Motors A, B, G, H, and I appear to have been running at the time of the explosion. Motors A, B and C were placed in intake airways, and they were all relatively close to the downcast shaft bottom. Motors D, E, and F were at or near the coal face, and motors H and I were in return airways, both being fixed in a place at a distance of, approximately, 400 yards from the shaft bottom. Motor G was fixed at a point in the, return 600 yards from the shaft bottom, but the motor house was ventilated by a fresh air split.
All the cables in roadways were armoured and many of them lead-sheathed and armoured. There were, however, lengths of unarmoured mains between switches and motors in every case. In the downcast shaft was one set of bare cables supported on insulators, otherwise the shaft cables were insulated lead covered and armoured.
The direction followed by the cables to each of the places where the power was required is marked on Plan I. On the Plan also are shown the places in the North Plodder where coal cutters and conveyors were at work. The coal-cutter face was cut during the night, when the bulk of the men were not at work, but the conveyor was in operation during the day time when the coal-getting shift was at work.
(h) The Use of Explosives. — For some years past the coal has been got without shot firing. Where great force was required to bring down the coal, a hydraulic wedge has been used; and the only blasting in the mine has been for ripping and in tunnelling. The ripping shots were fired in the metal above and below the seams. In the tunnels the shots have been fired in the strata other than the coal. The rule of the colliery was to do the blasting in the afternoon after the coal-getting shift had gone out, that is between shifts, when practically the only persons underground were the men engaged in firing the shots. The shots were fired in the morning, only occasional shots being fired during the night. They were fired by the firemen who alone were authorised shotfirers. Three firemen came down with the morning (coal-getting) shift, and three two hours later; the latter remaining in the mine two hours after the coal-getting shift had gone out. In these two hours the shots were fired. A record of all the shots fired was kept in the dataller's book, a book which was kept by the firemen with the object of informing the management when and in what parts of the mine the datallers worked. The explosive used was ammonite, and was electrically detonated.
A copy of this report was kindly donated by
West Cumbria Mines Research.