Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Winding Equipment At No. 3 Shaft

Shaft and headframe (Plan No. 2)

10. In 1886 No. 3 shaft was sunk to the Deep Soft seam at a depth of 1,626 feet. Subsequently, the lower 189 feet were filled in and the existing pit bottom established at 1,407 feet — the Ell Coal seam level. The shaft is 15 feet diameter and brick lined throughout.

11. There are two double-deck cages each capable of carrying a maximum of 16 persons per deck. Each cage is attached to a 1 1/8 inches diameter locked coil winding rope and guided through the shaft by four I inches diameter half locked coil ropes on the side nearest to the shaft wall. There are two rubbing ropes between the cages and these, together with the guide ropes, are suspended from white metal filled swivel glands in the headframe and tensioned by weights in the shaft sump, In the pit bottom the cages land on wooden baulks set into the shaft walls. On the north side a platform gives access to the top decks so that simultaneous loading or unloading of men can take place.

12. At the shaft top a circular brick tower forms an airlock and supports a steel frame for the detaching bells and the headgear which has back stays to ground level. Steel tie rods from the frame to the brick tower give additional stability. Access to an overwound cage suspended from the detaching bell is provided but there are no headframe catches to support a cage in that position. Either cage can ascend 15 feet 9 inches above the normal decking level before it is detached from the winding rope.

Winding engine

(i) General

13. Plan No. 3 shows a general view of the airlock, No. 3 winding engine house and the motor generator house. It also shows a detailed plan of the engine house and an enlarged view of the winding engineman's cabin.

14. The 440 horse power Ward Leonard winding engine was supplied by The British Thomson Houston Company Limited, Rugby, with mechanical parts designed and manufactured by Markham and Company Limited of Chesterfield. It was installed at Do Well Colliery, owned by the Staveley Coal and Iron Company Limited in 1921 and transferred to Markham No. 3 shaft about 1930. In 1945, the cylindrical drum was fitted with a centre ring and in 1949 a replacement automatic contrivance of the torque controller type was installed and commissioned by Tudor Auto Services Limited, now Blacks Equipment Limited. In 1952 the original deadweight brake was replaced by the servo-spring brake unit in use at the time of the accident. This was manufactured by S. Briggs and Company Limited and installed by Tudor Auto Services Limited. At the same time a Lockheed hydraulic impulse brake tripping system was installed but this was replaced in 1960 by a Blacks high pressure oil tripping system. In the same year, the 30 hertz (cycles per second) alternating current apparatus was converted to operate from a 50 hertz power supply. In 1961 the number of men permitted to travel in each cage was increased from 24 to 32. Thicker barrel plates and a new centre ring were fitted to the drum in 1963 and the cast iron brake shoes and fulcrum brackets were replaced by mild steel parts in the following year.

15. The engine is used only to wind men, materials and limited quantities of stone and as this duty does not require a predetermined winding cycle for production purposes it is left to the enginemen to regulate the speed and the rates of acceleration.

16. The ropes are attached to the drum by means of white metal sword capels bolted to the drum sides adjacent to the brake paths and when fully wound on are double layered. A new rope has about 11 'dead' coils to allow for recapping.

17. The drum is connected by a solid coupling to a direct current motor (winder motor) which has separately excited field windings and an open loop control system. The armature is supplied by the generator of a Ward Leonard motor generator set driven by an alternating current slip-ring induction motor housed with its associated control equipment in a separate building adjacent to the winding engine house.

18. The speed and direction of rotation of the winder motor are controlled by movement of the engineman's control lever within a quadrant which has a middle 'off' position. Forward or backward movement of this lever operates electrical contacts which determine the polarity of the generator field and thus the direction of rotation of the winder motor (Plan No. 4). The lever also operates a rheostat which varies the generator field strength and hence the output voltage of the generator. Except at low speeds the winder motor speed is proportional to voltage for a particular load but for each change in load this proportionality alters.

19. One of the winding enginemen describing a normal wind with an equal number of men in each cage said that after receiving the necessary signals he moves the control lever in the appropriate direction from the 'off' position gradually applying power to the winder motor and slowly releasing the mechanical brake. The voltage applied to the motor is then progressively increased to accelerate the winding drum until the indicated voltage reaches 300 to 320, which gives a drum speed of about 40 revolutions per minute and a rope speed of about 20 feet per second (13.6 miles per hour). This speed is maintained until the position of the cages in the shaft corresponds to about 10 drum revolutions (283 feet) from the end of the wind when the generator voltage is gradually reduced by moving the control lever towards the 'off' position to increase regenerative braking. This braking is available to reduce speed during a wind and, if there is a descending out-of-balance load, to maintain a selected speed.

20. During regenerative braking the winder motor, which is then being driven by the load, becomes a generator with an output voltage higher than that of the Ward Leonard generator. This causes the generator to drive the alternating current motor which in turn becomes an induction generator feeding power back into the colliery supply system thus producing a braking effect on the winding engine. The engineman maintains this braking as the wind continues by progressively reducing the voltage to about 200 at 6½ drum revolutions (184 feet) from the end of the wind, when a warning bell rings. He continues to decrease the voltage and, consequently, the speed of the cages by gradually bringing the control lever to the 'off' position. At about four revolutions (113 feet) from the end of the wind he progressively applies the mechanical brake until the cages come to rest. With a heavy out-of-balance load descending the engine is controlled in a similar manner but the mechanical brake is applied earlier.

21. The enginemen estimate the loads in the cages from readings of winder motor current on a centre zero ammeter connected in the main direct current loop (Plan No. 4). When loads in the two cages are similar the starting current is about 800 amperes and this reduces to zero as the cages approach the midpoint of the shaft. As the weight of the descending rope becomes predominant the motor current automatically reverses to produce regenerative braking, the value of braking current being indicated on the opposite side of the ammeter scale. With a maximum out-of-balance load descending the starting current is lower, regenerative braking develops earlier and the magnitude of braking current is greater than that obtained with equal loads in the cages.

22. Although regenerative braking provides an efficient means of reducing the speed of a Ward Leonard winding engine it is only available on the No. 3 winding engine when the electrical systems are operating normally. There is no regenerative braking if the power supply fails, if any of the safety devices operate or if the emergency stop button is pressed.

(ii) Mechanical brake

23. At the time of the accident a Burns Cradle type brake was in use (Plan No. 5). It consisted of a pair of Ferodo lined brake shoes applied to the underside of the brake paths by the action of the compressed spring nest operating through a system of levers. The brake was released by using compressed air to counteract the force of the spring nest and move the brake shoes away from the drum brake path. During normal braking the winding engineman's brake lever operated an Iversen type valve which controlled the flow of compressed air to a servo-cylinder.

24. The force from the spring nest was transmitted to the main lever of the brake system by a 2 inches diameter steel rod 8 feet 11 7/8 inches long, located in the centre of the nest, constrained by a plate at the top and connected by a crosshead trunnion to the main lever at the bottom. The piston of the servo-cylinder was connected to the free end of the main lever and when compressed air was admitted to the cylinder this lever was forced down and the brake released.

25. If the power supply failed or any of the safety devices operated, or if the emergency stop button was pressed, the emergency brake solenoid was de-energised and the 'ungabbing' gear immediately disengaged the engineman's brake control lever from the Iversen type valve and caused the mechanical brake to be applied (Plan No. 5). The 'ungabbing' gear could not be reset until the brake control lever was returned to the 'brakes on' position and the safety circuits were energised.

(iii) Safety equipment

26. The automatic contrivance was a Blacks controller driven from the drum shaft through a system of gears which also drove a vertical pillar type depth indicator showing the position of the cages in the shaft. It was designed to cut off the power supply to the winder motor and cause the mechanical brake to be applied to prevent the cages:

 (a) 
reaching an excessive speed in the acceleration, constant speed or retardation zones
 (b) 
being landed on the baulks at a speed exceeding five feet per second; and
 (c) 
travelling beyond a predetermined position above the highest landing.

The controller had a centrifugal governor, dial mounted cams and overspeed and overwind switches which operated in conjunction with back-out switches and two electrical safety circuits.

27. One of these circuits, which included the brake solenoid and all the protective features provided by the automatic contrivance, was interlocked with the other — the pilot safety circuit — which has two contactors in parallel. These contactors can be tripped by various safety devices including the winding engineman's emergency stop button, an overwind switch on the depth indicator, the Ward Leonard overcurrent relay and the slack rope and brake wear switches. The pilot safety contactors have contacts in series with two parallel connected main safety contactors which control the supply of electricity to the winder motor and the brake solenoid. The schematic diagrams (Plan No. 4) show that the brake solenoid, pilot safety circuit contactors and the main safety contactors must all be energised to run the winding engine and, therefore, operation of any safety device should cut off the power supply and apply the mechanical brake. Visual indicators in the engineman's cabin show correct or incorrect operation of the pilot and main safety contactors.

28. Before winding men the engineman operated a lever which, through a linkage, altered the position of one of the cams on the automatic contrivance to enforce lower winding speeds. A switch on the lever gave visual indication to the banksman, onsetter and winding engineman that the lever was set for 'man winding' but did not positively prove the position of the cam on the automatic contrivance.

29. A rope speed indicator was installed in the engineman's cabin adjacent to the ammeter about 13 years ago but the associated tacho-generator was not fitted and the indicator never operated. Further technical details of the winding equipment are given in Appendix III.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z