Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Description Of The Colliery

General

5. Markham Colliery is one of 14 producing mines in the North Derbyshire Area of the National Coal Board and is situated near Duckmanton about five miles by road to the east of Chesterfield. At the time of the accident the saleable output was 30,000 tons per week with 1,870 men employed below ground and 425 on the surface.

6. There are four shafts (Plan No. 1 shows their location) arranged in pairs with No. 1 (downcast) and No. 4 (upcast) near the general offices and No. 2 (downcast) and No. 3 (upcast) some 350 yards to the south. Coal winding is confined to Nos. 1 and 2 while Nos. 3 and 4 are used for winding men and materials.

7. At the top of No. 3 shaft there is an Aerex radial flow fan which extracts 238,000 cubic feet of air per minute at 9.8 inches water gauge.

Management

8. The principal officials holding statutory appointments for Markham Colliery including the winding equipment at No. 3 shaft, were:

Area Director R. B. Dunn
Deputy Director (Mining) J. H. Northard
Area Chief Mining Engineer T. W. Peters
Area Chief Engineer G. Godfrey
Colliery General Manager J. Rodgers
Colliery Mechanical Engineer W. Fox
Colliery Electrical Engineer C. C. Levers

There were two Deputy Managers, each holding statutory responsibility as Undermanager for a part of the colliery. D. Hotchkiss, the Senior Deputy Manager, was responsible for the surface and No. 3 shaft.

9. Other officials whose responsibility included the winding equipment at No. 3 shaft were:

Area Mechanical Engineer A. G. Harley
Area Electrical Engineer M. Blythe
Colliery Chief Engineer J. A. Plant

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z