5. Markham Colliery is one of 14 producing mines in the North Derbyshire Area of the National Coal Board and is situated near Duckmanton about five miles by road to the east of Chesterfield. At the time of the accident the saleable output was 30,000 tons per week with 1,870 men employed below ground and 425 on the surface.
6. There are four shafts (Plan No. 1 shows their location) arranged in pairs with No. 1 (downcast) and No. 4 (upcast) near the general offices and No. 2 (downcast) and No. 3 (upcast) some 350 yards to the south. Coal winding is confined to Nos. 1 and 2 while Nos. 3 and 4 are used for winding men and materials.
7. At the top of No. 3 shaft there is an Aerex radial flow fan which extracts 238,000 cubic feet of air per minute at 9.8 inches water gauge.
8. The principal officials holding statutory appointments for Markham Colliery including the winding equipment at No. 3 shaft, were:
| Area Director | R. B. Dunn |
| Deputy Director (Mining) | J. H. Northard |
| Area Chief Mining Engineer | T. W. Peters |
| Area Chief Engineer | G. Godfrey |
| Colliery General Manager | J. Rodgers |
| Colliery Mechanical Engineer | W. Fox |
| Colliery Electrical Engineer | C. C. Levers |
There were two Deputy Managers, each holding statutory responsibility as Undermanager for a part of the colliery. D. Hotchkiss, the Senior Deputy Manager, was responsible for the surface and No. 3 shaft.
9. Other officials whose responsibility included the winding equipment at No. 3 shaft were:
| Area Mechanical Engineer | A. G. Harley |
| Area Electrical Engineer | M. Blythe |
| Colliery Chief Engineer | J. A. Plant |