Rescue and recovery work
47. The men involved in the outburst made their own escape as best they could; thereafter those who were physically fit aided those in need of assistance.
48. The group of 18 men from the return end of Panel 13 face led by Illtyd Beynon, overman, were soon in fresh air on Road 2 at its junction with Panel II gate where he immediately used the loudspeaker communication system to broadcast a message instructing all men to get out of the return airways. Using his methanometer, Beynon then tested for gas at the junction. He found none and proceeded down Road 2 towards Panel 13 main gate for about 10 yards (9 metres) where his methanometer registered a full scale reading of 5% of firedamp. He decided to go no further at the time and returned to the junction where he telephoned to the acting manager on the surface and reported the situation to him. Beynon then made a second attempt to go down Road 2 and detected 4.5% of firedamp. When he saw the lights of men walking out towards him (F R Ould, D J Thomas and T L Rees) he realised that the air was respirable.
49. Along with about six other men he went inbye down Road 2 as far as the junction with Panel 13 main gate at which point he detected at least 5.0 of firedamp. Beynon again reported by telephone to the acting manager who informed him that P K Lewis, under-manager, was at the inbye end of Panel 13 main gate, with a large number of men in varying stages of regaining consciousness.
50. When Leslie Davies, the first survivor from the inbye end of Panel 13 main gate, reached Road 2 Beynon decided to lead his group of volunteer rescuers towards the Panel 13 face. On their way they met survivors coming out and gave what assistance they could to get the men into Road 2 and fresh air. Near the face Beynon met P K Lewis, under-manager, who by this time was much recovered and supervising rescue operations. He had crawled out into the main gate and as men began to recover consciousness gave what assistance he could. As soon as anyone appeared fit enough he sent them outbye telling them to keep as close to the floor as possible.
51. Soon after Illtyd Beynon and his group arrived L R Jones, overman, and D Deasy, deputy, came up from Panel 2 (which had not been directly affected by the outburst). They were soon followed by first aid men from the surface with oxygen reviving apparatus. After a period of about an hour most of the survivors from this area were evacuated from Panel 13 into the Road 2 main intake. However, despite prolonged efforts to revive them, including the use of oxygen apparatus, W Luther Davies, H Garfield Roberts and I Gareth Watkins did not respond. The assisting workmen, some of whom had earlier escaped from the return side of Panel 13, were beginning to feel the effects of their efforts in the prevailing conditions and the under-manager decided that they should all withdraw to fresh air.
52. While the evacuation of men from Panel 13 main gate was under way, another group of men including F Knoedl, J Steinmann, G M Rowlands and Oscar Evans arrived at the outbye end of the gate and, looking forward into the lower part of Road 2, saw lights not far away. By holding their breath, keeping as close to the ground as possible and working rapidly, these men were able to bring A Miller and Lyndon Davies out to the junction where an attempt was made to revive them, but without success. They also tried to go further down the road to recover H Itzi, but were unsuccessful because of the high concentration of firedamp.
53. The acting manager had called the Loughor Rescue Station 10 miles (16 kilometres) away, at 12.26 p.m. and the first team arrived at the colliery at 12.50 p.m. and went underground soon afterwards. The rescue team went inbye along the main intake and at 2.00 p.m. established a fresh air base in Road 2 at the junction with old Panel Il gate. Soon after 2.00 p.m. a second team arrived at the fresh air base and exploration of the affected area inbye was begun by men wearing breathing apparatus. By 2.15 p.m. the last of the survivors had been evacuated and the colliery checking system had indicated that all the men had been accounted for. The rescue teams recovered the bodies from Panel 13 main gate and by 3.40 p.m. five of the bodies had been brought out into Road 2 and the fresh air base had been moved to a point just outbye Panel 13 main gate junction. Soon afterwards the last body, that of H Itzi, was brought out from a point about 65 yards (59 metres) inbye Panel 13 junction. The places where the bodies were found are marked on Plans Nos. 2, 3 and 4. The rescue teams then made inspections down Road 2, through the whole of Panel 13 district and finally through the return from Panel 13 outbye to the upcast shaft.
54. The officials engaged in the rescue operations noted that the ventilation was taking its proper course and considered that the air quantities were normal, although no actual measurements were taken. Much use was made of methanometers during the recovery, the two types of instrument used having maximum scale readings of 5% and 100% of firedamp. Three hours after the outburst 4.0% of firedamp was detected at head height throughout the length of Panel 13 intake gate and at the junction of this gate with Road 2 there was a roof layer containing up to 40% of firedamp. About five hours after the outburst 4.0% of firedamp was measured in the general body of the air at the outbye end of Panel 13 return gate; this was reduced to 2.2% about three hours later and continued to fall thereafter. Near the outbye end of the main return airway from the Cross Measure 2 Section where the air quantity passing was about 110 000 cubic feet per minute (52.83 cubic metres per second) a firedamp concentration of 7.0% was measured one hour after the outburst; this reduced gradually to 4.0% after three hours and to less than 2.0% seven hours after the outburst.
55. The positive ventilation of Road 2 inbye of Panel 13 intake gate junction was interrupted at the time of the outburst by the blocking of the air duct and then by the cutting off of electric power from the fan, but considerable quantities of firedamp continued to flow out of this road from the seat of the outburst further inbye. Just inbye of this junction three hours later 2.0% of firedamp was found at a point two feet (0.6 metres) above floor level and 50% at a height of four feet (1.2 metres). Near the roof there was a layer about two feet to three feet (0.6 to 0.9 metres) thick with a concentration of up to 50%. Nine hours after the outburst at a point in this road just outbye of the toe of the outburst material the firedamp content was about 4.0% at head height and there was a roof layer about two feet (0.6 metres) thick containing up to 35% of firedamp. This layer was moving fairly briskly outbye and a velocity measurement showed it to be flowing at 340 feet per minute (1.7 metres per second) even though the auxiliary ventilation had not been restored. One hour later, at 10.00 p.m., the auxiliary forcing ventilation fan was restarted and delivering 6000 cubic feet per minute (2.8 cubic metres per second) to the toe of the outburst material. The fan continued to run until the early hours of 8 April with frequent monitoring of the air quantities and firedamp concentrations in the vicinity. In the meantime an exhaust fan had been installed to extract 11 000 cubic feet per minute (5.2 cubic metres per second) directly into the Road 3 return and the forcing fan was shut down. This ventilation system provided satisfactory conditions for the filling out of the outburst material and permitted the resumption of normal working on Panel 13 face.