5. Michael Colliery, which is in the Scottish North Area of the National Coal Board, is situated on the northern shore of the Firth of Forth, in the village of East Wemyss, Fife, midway between Kirkcaldy and Leven.
6. The principal officials at Area level were:
| Director | Mr. D. J. Skidmore |
| Deputy Director (Operations) | Mr. W. Rowell |
| Chief Mining Engineer | Mr. D. D. Shaw |
| Production Manager | Mr. J. S. Wilson |
7. The colliery was managed by Mr. G. Duncan, general manager, with Mr. A. Nicol, deputy manager, and Mr. D. Wilson, Mr. J. Simpson, Mr. A. Robertson and Mr. J. Soutar, under-managers.
8. The sinking of Nos. 1 and 2 Shafts, both rectangular in cross section and wood lined, was begun in 1892 and reached the Chemiss Seam at a depth of 136 fathoms in 1898. The No. 3 Shaft, 24 feet in diameter and concrete lined, was sunk to the present pit bottom at a depth of 300 fathoms in 1928. More recently the No. 2 Shaft was enlarged to 20 feet in diameter, concrete lined and extended down to 430 fathoms. In 1944, No. 1 Pit was completely filled in and the two remaining shafts were used for winding coal, No. 3 serving as the downcast and No. 2 as the upcast. Safety lamps were in use throughout the mine.
9. The working seams are all contained in the productive coal measures of the carboniferous series; the total thickness of strata between the top seam, the Pilkembare, and the bottom seam, the Lower Dysart, is 225 fathoms, within which there are 19 seams. They dip seawards in a south-easterly direction at gradients varying from one-in-three to one-in-two. The coalfield is remarkably fault-free, but there is one major quartz dolerite transgressive sill running roughly north-east where the measures are thrown up about 50 fathoms to the north-west. At the time of the fire five seams were being worked, the Dysart Main and the Four Feet in No. 3 Pit and the Chemiss, Bowhouse and Branxton in No. 2 Pit.
10. The colliery employed 2,190 men, 1,874 underground and 316 on the surface. The average weekly output of 16,750 tons was produced from fully mechanised shearer loader faces, as follows:
| Chemiss Seam | (No. 10 District) | 4,055 tons |
| Four Feet Seam | (No. 31 District) | 1,275 tons |
| Bowhouse Seam | (No. 40 District) | 2,184 tons |
| Branxton Seam | (No. 22 District) | 3,701 tons |
| Dysart Main Seam | (No. 1 District) | 4,285 tons |
| Dysart Main Seam | (No. 3 District) | 1,250 tons |
11. The checking system in force at the colliery had remained unchanged for many years. A man reporting for work changed his clothes in the baths and then went to the lamp room to collect his lamp. He then went to the check office window, called out his personal number and collected two checks, one square and the other round, bearing this number. On going underground, he dropped the square check into a container at the pit bottom and retained the round one. When the last man underground had gone to his work, the container was brought up the pit and the square checks were put on the check board as an indication that the men concerned were underground. At the end of the shift, each man on coming to the surface dropped his round check into the check office window. The round check was then placed on the board with the corresponding square one indicating that the man was now above ground. A lamp number was allocated to a man when he first joined the colliery. There was no relationship between the lamp and the check numbers, but each being related specifically to individuals, were complementary to each other and served as a double check.
12. As will be seen later in the Report, some confusion arose over the numbers of men still below ground at various stages in the incident. It is desirable that the National Coal Board and H.M. Inspectors should examine the possibility of improving checking systems.
Method of Ventilation and Working
13. Ventilation was provided by a Howden 1,000 horse-power radial flow fan situated at No. 2 Shaft and producing 310,000 cubic feet of air per minute at 3.5 inches water gauge. There was a standby fan, a two stage Aeroto 400 horse-power 100 inch diameter unit with a capacity of 225,000 cubic feet of air per minute at 2.5 inches water gauge. There were no underground booster fans.
14. Access to the Sections in the No. 2 Pit workings was by horizon mines and, in the No. 3 Pit workings, by roads in the seams. Plans Nos. 1 and 2, which cannot be scaled, are isometric drawings, which have been prepared to clarify, visually, the relationship of workings on different horizons. In order to appreciate the extent of the workings, it may be noted that a man going along the 430 fathoms mine from No. 2 Pit Bottom would travel 1,530 yards to the Coal More Turn., 2,530 yards to the Compressor House and 3,537 yards to the return roadhead of the Bowhouse No. 40 Section. A man starting from No. 3 Pit Bottom would reach the top of the Four Feet Dook in 870 yards and the intake roadhead of the No. 31 Section in 1,560 yards. On the Dysart Dip side of the colliery, the distance from No. 3 Pit Bottom through the intakes to the Dysart Dip No. 3 Section roadhead was 1,967 yards. The scale of Plan No. 2 can be visualized by noting that the distance along the Loco Level from the Dysart Turn to Bell's Heading was 320 yards.
No. 2 Pit workings
15. From the 300 fathoms level at No. 3 Shaft bottom, the 360 fathom level was reached by three dooks (dipping roads) in the Dysart Main Seam and two in the Lower Dysart Seam. The 360 Lateral Level Mine followed the line of strike in a south-westerly direction with two level cross cuts (Nos. 1 and 2) driven through the seams along the line of full dip to give access to the large field of coal to the seaward side of the quartz dolerite sill. From the No. 2 Shaft bottom level at 430 fathoms, a level mine ran in a westerly direction with two cross cuts (Nos. 1 and 2) driven along the line of full dip to make contact with the coal seams. The cross cuts at the 360 fathom and 430 fathom levels were connected by roadways driven on the full dip of the various seams, and from these roadways the working sections advancing along the line of strike were developed. Air circulated from the No. 3 Shaft, down the Dysart Dooks, through the 360 fathom Lateral and the No. 1 and No. 2 Cross Cuts, into the working sections, returning through the 430 fathom cross cuts into the 430 fathom Lateral to the No. 2 Shaft.
No. 3 Pit workings
16. From the 300 fathom level at No. 3 Pit Bottom, roadways had been driven in the coal to the full dip and from them the various sections of the Dysart Main coal workings advanced along the line of strike. Also from No. 3 Pit Bottom a level mine, called the Sea Mine, had been driven in a south-easterly direction, cross cutting all the seams in the field. At the time of the fire, the Four Feet Seam was being worked from the Sea Mine, workings in the Barncraig, Chemiss, Bowhouse, Branxton and Boreland having been abandoned at various times between 1956 and 1960. The most recently abandoned section of the Sea Mine workings was in the Branxton Seam, but a pumping station was still maintained there. Air for the Four Feet workings entered along the Sea Mine and returned to the upcast shaft at the Bowhouse Inset by way of the Old Branxton and Bowhouse workings. The only open route to other collieries was a connection, driven in 1963, in the Lower Dysart Seam to Lochhead Colliery.
The Loader Mine and the Loco Level
17. The Loader Mine was supported throughout by 15 feet long straight steel girders set at three feet intervals, on seven feet steel props attached to the girders by specially designed clamps. The sides of the roadway were lined with a mixture of treated fireboards and concrete slabs, in the estimated proportion of 20 per cent of the former to 80 per cent of the latter, set in the webs of the girders and props. Any small falls had been filled with untreated timber and there was also untreated timber over the tops of the roof girders.
18. The Loco Level was supported by 14 feet by 10 feet arched girders. The sides of the road were lined mainly with fireboards but there was some untreated timber above the arches and, as necessary, behind the fireboards.
19. The junction of the Loader Mine with the Loco Level was supported by straight steel girders resting on brick pillars at the centre and a brick wall around the junction. Runners were provided across the girders with fireboards between the webs. Untreated timber had been used to fill the space, estimated at 9 to 12 inches in thickness, above the girders.
20. Coal from the Dysart Dip workings was brought up to the Loader Mine on a cable belt conveyor. It was then carried down the Loader Mine to the Loco Level by a belt conveyor 36 inches wide, 200 feet long with a 15 feet jib extension, and driven by a 36 horse-power motor at a speed of 390 feet per minute. The belting was made of fire resistant anti-static P.V.C. manufactured to National Coal Board Specification 158/1960.
21. The electricity supply cables in the Loco Level were PVCDWA, P.V.C. sheathed at 550 volts and PILCDWA, P.V.C. sheathed at 3,300 volts.
22. There were three internal telephone systems at the colliery. The first, an automatic system, was installed in 1957 and had facilities for up to 100 lines. It served. in addition to other places, the intake and return gates of every working district, and the loading points, junctions and bunker stations. Two extensions, serving the general manager and deputy manager, had priority call facilities which enabled either official to interrupt a conversation on any of the other lines. The second system, of the magneto-call type, had a manual exchange in the time office. The third was a system of local telephones, some of which had loudspeakers, for point to point communication underground.
Fire-Fighting Arrangements
23. The plan of the fire-fighting arrangements in the No. 3 Pit Bottom area at the time of the incident showed that eight hydrants were sited as follows:
four in the 300 fathoms Lateral, of which one was at the shaft bottom, one at the junction with the Sea Mine, one at the junction with the Lower Dysart Man Haulage Dook and one midway between the two latter points;
and
four in the Loco Level, of which one was at the Dysart Turn, one near the junction with the Old Pumphouse, one at the junction near the stopped off No. 3 Heading and one at the junction with Bell's Heading.
Plans had been made for a ninth hydrant to be sited in the Loader Mine, but the pipeline from the shaft was not complete. Fifteen hoses with other fire-fighting gear were kept in a station near the Old Pumphouse and 14 hoses with other fire-fighting gear in stations at each end of the New Pumphouse. It was said in evidence that the fire-fighting plan was revised once a month, that there were 86 trained men at the colliery and that drills were held about three times a year.