Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

I. — Description Of The Colliery.

General. — Wernbwll Colliery, situated about 2½ miles west of Gowerton in the Parish of Llanrhydian Higher, was owned by the New Berthlwyd Gas Coal Company. Since the Inquiry was opened the business has been made into a Limited Liability Company and the owners of it now are Berthlwyd Colliery Limited.

Two seams of good quality gas coal, known respectively as the Penlan and Penclawdd seams, are worked separately by means of slants driven from the surface.

The general plan of the workings of the West District of the Penclawdd seam in which the explosion occurred, and with which, therefore, this report is concerned, is shown in Plan 1.

From this plan it willeen that the West District is reached by a series of three slants, the lowest of which, known as the Main West Slant, is driven on the full dip of the seam which has an inclination in this locality of about 34 degrees or 25 inches per yard. The total distance from the surface to the bottom of the Main West Slant’ at the date of the explosion was 1,450 yards and the thickness of cover at this point was about 1,500 feet.

The Penclawdd seam is, normally, about 4 feet 6 inches thick with a conglomerate sandstone roof and a fireclay floor.

There was a second district of the Penclawdd Seam, known as. the East District and reached by the East Slant, the workings of which were much the same in extent as the workings of the West District.

Supervision. — The supervision was carried out by the following staff.

Mr. D. D. Williams, Owner and Agent of Wernbwll Colliery and also of Berthlwyd Colliery working the same seams and distant about 1 mile from Wernbwll; Mr. J. Phillips, Certificated Manager and also Certificated Manager of Berthlwyd Colliery; Mr. W. J. Hughes, Certificated Undermanager; Mr. Llewellyn Thomas; overman; and three firemen, one for each shift.

The total number of persons employed below ground on three shifts was 160 of whom 29 were employed in the West District at the time of the explosion.

Method of Working. — The method of working is a modification of pillar and stall, locally known as the "Tophole" system, and is common to most of the mines working steep seams in the Western area of the South Wales coalfield. From slants driven to the full dip, levels 9 feet wide are set away about 40 to 60 yards apart, off which topholes 14 yards apart, and 9 feet wide, are driven to the full rise. Crossings for ventilation purposes are driven 7 feet. wide between the topholes.

In the levels, about 3 feet 6 inches of floor cutting is taken up on the rise side and about 2 feet of ripping taken down on the dip side, making a road about 6 feet high and 9 feet wide,

The seam is worked entirely by hand with the aid of shotfiring; the coal from the topholes and crossings is cast on to iron sheets, laid in the topholes, down which it slides to the bottom of the topholes. There it is filled into trains by the trammers who take. the full tubs to a double parting close to the slant.

Ventilation. — An electrically driven fan situated near the mouth of the return slant (see Plan 1), and capable of producing 35,000 cubic feet of air per minute at 3½ inches water gauge provided the main ventilation for the mine. According to the record kept at the mine, the water gauge stood at 2.1 inches prior to the explosion. No recent measurements had been taken of the air in the main return near the fan; but a measurement taken there three weeks after the explosion showed that 24,300 c. ft. per minute were passing when the water gauge was standing at 2.45 inches.

Records kept in the Air Measurement Book showed that the quantity of air going into the No. 2 slant, to ventilate the East. and West Districts of the Penclawdd Seam, measured at a point. near the top of No. 2 slant (see Plan 1) was 15,000 cubic feet, per minute, whilst measurements in the returns from the East and West Districts made at points near to where the air currents joined (see Plan 1) gave 4,000 and 3,600 cubic feet per minute respectively. No measurements of the air within 100 yards of the first working place of either district had been recorded in the Air Measurement Book. It was claimed that such measurements could not give a correct idea of the real state of the ventilation at the working face in the West District since the ventilation produced by the fan was supplemented by: (1) the exhaust from two compressed air-driven pumps in the Main West Slant; (2) the discharge from compressed air pipes run into the faces of the slant, of the levels and of the adjoining topholes, and (3) a 16 inch diameter Typhoon Turbine Fan, driven by compressed air, placed at a point about midway in the ventilating district. At the time of the explosion, this fan was installed at the top of a tophole in No. 11 Level (see Plan 2).

Lighting. — On account of the comparative immunity from firedamp of the workings of this seam in the past, (firedamp in insignificant quantity had been met with on only four occasions during the twelve months prior to the explosion) — naked lights, usually in the form of acetylene lamps, but in some cases candles, were used throughout the mine. But following an explosion of firedamp that occurred on the 28th September, 1928, and resulted in the burning of a collier, who was at work in a tophole extracting a pillar in the East District, Special Regulations (Schedule A) were established and an exemption from the use of safety lamps was granted by the Board of Trade under Section 32 (1) (b) of the Coal Mines Act, 1911. These Regulations, which are set out in full in Appendix III to this report, require, inter alia, flame safety lamps to be used in prescribed places in addition to the naked lights. Generally, about 14 flame safety lamps of an approved type were constantly in use in the Penclawdd Seam for the purposes of these Regulations, and in accordance with the provisions of the Special Regulations flame safety lamps were in use at the face of No. 13 level, in No. 1 tophole and in No. 2 tophole.

Coal Dust. — No stone dusting had been done in this mine prior to the explosion. The roadways were described by the manager and under-manager as being "naturally wet throughout." In accordance with the terms of the second proviso to No. 4 of the General Regulations of 30th July, 1920, as amended 20th November 1924, tests of samples said to be representative of the dust from the floor, roof and sides, were made at intervals not exceeding three months. According to the results of these tests the percentage of incombustible matter, in the samples was rarely less than 80 per cent — the lowest was 67 per cent, and several samples showed over 90 per cent of incombustible matter. Bearing in mind the method of working, whereby the coal from the faces of the topholes and crossings slides down chutes and is loaded therefrom into trams standing in the levels, the amount of incombustible matter found in these samples is, to say the least, remarkable; I find it difficult to come to any other conclusion than that they were not representative of the conditions throughout the roadways in which they were taken. In contrast with them, I take the opportunity of referring to the result of systematic sampling of the dust in No. 13 level carried out by the Inspectors of Mines some days after the explosion. All the dust from the floor, roof and sides of 10 stretches of roadway each 10 feet long, and spaced evenly between the face of the level and the slant, was collected and, after quartering down in the usual way, the samples were submitted for analysis. In no case was a sample found to contain more than 38 per cent of incombustible matter, and the average for the ten was 25 per cent.

It can, of course, be claimed, and quite rightly too, that these samples were not accurately representative of the prevailing before the explosion. It must be granted that as a result of the explosion a considerable quantity of coal dust would be ejected in a cloud from the topholes into the level and that this dust would settle shortly after the blast ceased. This effect of the explosion was clear to the naked eye, for over everything, even for a considerable distance up the slant from No. 13 level, there was a thin deposit of dust to be observed. It is very doubtful, however, whether the quantity and quality of the dust so deposited could account for such a wide difference between the two sets of samples.

In the face of these facts I am not satisfied that the natural conditions in this mine were such as to make the application of stone dust or water unnecessary.

 

Prev Page Return to Top of Page Next Page


A copy of this report was kindly donated by
West Cumbria Mines Research.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z