Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

I. Description Of The Colliery.

Birchenwood Colliery is situated at Kidsgrove at the Northern end of the North Staffordshire coalfield.

At the present time five shafts and one footrail are in use for the purposes of winding, ventilation and pumping. Of these, two are upcasts, the other three and the footrail being downcasts.

The principal shaft No. 18 is the only shaft used for winding coal. It is a downcast and from it some 5,000 to 6,000 tons of coal were being raised per week at the time of the accident.

For more than 30 years prior to 1925, the colliery was owned and worked by the Birchenwood Colliery Company, Limited, but in June of that year it was taken over by the Kidsgrove Collieries, Limited.

At various times 13 seams of coal have been worked; but since the change of ownership operations have been confined to three, viz. the Seven Feet Banbury, the Eight Feet Banbury and the Bullhurst. The inclination of the seams varies greatly throughout the mine, but is generally steep and in the part of the mine with which this report is concerned the measures were inclined at an angle of 45 degrees, the general direction of the dip being to the South-East.

The explosion, occurred in the Wakefield's Dip District of the Seven Feet Banbury seam and a plan of this district, showing its connections to the downcast and upcast shafts (Plate 1), and a plan showing in greater detail the scene of the explosion (Plate 2) are appended to this Report. Plate 2 also shows the places at which workmen were stationed at the time of the accident, and the positions in which the bodies of those killed were subsequently found.

The No. 18 Pit is sunk to the Silver mine seam at a depth of 440 yards. A cross measure drift or crut driven to the S.E. from the shaft successively intersects the Winpenny, the Bullhurst, the Eight Feet and Seven Feet Banbury and other seams. The Bullhurst, Eight Feet and Seven Feet have been practically exhausted from the outcrop down to the pit bottom level and further areas of coal to the dip have been developed. For this purpose some years ago two slants were driven in the Winpenny seam in a south-westerly direction from near the pit bottom at an inclination of 1 in 2 for a distance of about 900 yards, the depth from the surface at this point being about 850 yards. Cruts have been driven across the measures from the bottom of these slants to intercept the Bullhurst and Eight and Seven Feet Banbury seams respectively.

In the Seven Feet Banbury seam a breadth of coal still further to the dip has been developed by inclines driven in the seam nearly on the full dip to a level at a depth of 948 yards below the surface. And from these dips the district known as Wakefield's Dip District in which the explosion occurred has been opened out. The distance from the bottom of No. 18 Pit to the top of Wakefield's dip is 1,338 yards.

Ventilation. — The district was ventilated by one split. The intake air entered by Wakefield's dip, passed along the "Bottom Shunt" level, round the working places, thence by the old back dip or "pipe" dip into the "Top Shunt" level, round the pillars there and back to the return crut by the air heading and Wakefield's back dip. This will be clear on reference to Plate 1, where the direction of the air current is indicated by feathered arrows, and on which are shown the doors, sheets and stoppings erected to keep the air to its proper course.

Precautions against Coal Dust. — The systematic application of stone dust has been carried on since 1914, and during 1925, 1,197 tons of stone dust were distributed, an average of 8.67 lbs. of stone dust per ton of coal drawn. In Wakefield's Dip District 40 tons of stone dust were applied during the three months prior to the explosion.

In my opinion it is safe to say that but for this systematic application of inert dust, the explosion instead of being confined, as it in fact was, to a comparatively small area, would have been very much more extensive.

Persons employed. — The total number of persons employed underground at the colliery was 1,126, and at the time of the explosion 374 persons were underground.

 

Prev Page Return to Top of Page Next Page


A copy of this report was kindly donated by
West Cumbria Mines Research.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z