Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

II. — The "Q" Face

General Description

This face was advancing to the north in a virgin area. It was about 80 yards long with the intake loading gate at the right and the return supply gate at the left. The gates were advancing to the rise at gradients of 1 in 2.5 in the loading gate and 1 in 2.1 in the supply gate; on the face there was a rise from right to left at a gradient of 1 in 3.5. The ventilation was ascensional.

The face started as a production unit in January, 1955, and had advanced about 90 yards. It was the intention to advance it a further 20 yards and then replace it by a face, formed by the ribside of the loading gate, to advance to the east.

Method of Work and Organisation

The coal was hand-got with the aid of pneumatic picks and of shots fired in flanking holes drilled in the solid coal. It was filled on to a retarder conveyor on the face and conveyed to a tub-loading point by means of two belt conveyors in tandem in the loading gate. The face conveyor was compressed-air-driven and the belt conveyors were electrically driven.

Top rippings were taken in both gates with an additional floor ripping in the supply gate. Shots were fired in all the rippings. Both gates were supported with steel arch girders.

For the purpose of dust suppression, the pneumatic picks were fitted with water feed, hand sprays were used on the face, and fixed sprays at the transfer and loading points. Water infusion of the face had been tried but had proved abortive due to the fact that the face was advancing on the ends of well defined cleats in the coal.

The face was worked on a 48-hours cycle, and the operations usually performed on each of the three shifts were as follows :—

Morning Shift 
7.0 a.m. to 2.30 p.m. 
Coal getting and filling. Ripping and packing in the supply gate.
Afternoon Shift 
3.0 p.m. to 10.30 p.m. 
Ripping and packing in both gates. Withdrawal of supports and advancing of strip packs on the face. Moving forward the conveyor on alternate days.
Night Shift 
11.0 p.m. to 6.30 a.m. 
Drilling shot holes and firing shots in coal.

The face formed a deputy's district on each shift. Except at week-ends, each deputy made the pre-shift inspection for the succeeding shift. The "P" and "Q" faces together formed an overman's district on each of the three shifts.

Roof Support and Control

The roof on the face was supported by means of wood bars set at right angles to the face on wood props. Each of the gates had solid coal on one side, and on the other side a pack, about 10 yards wide, built with stone from the rippings. Along the face, strip packs about 6 yards wide were built with stone from the intervening wastes which were about 9 yards wide. Two hardwood chocks were maintained at the edge of each waste. Roof control had always been satisfactory on this face and there was no history of roof weighting or falls of ground.

Ventilation and the Occurrence of Firedamp

The "Q" face was ventilated by an air current of about 8,000 cubic feet per minute which had already ventilated the "P" face. According to all the evidence the ventilation has always been adequate, and on only two occasions, 5th May and 27th June, 1955, had inflammable gas been detected and reported by the deputies. On each occasion a trace of inflammable gas was reported at the ripping face in the supply gate.

After the first report of inflammable gas on 5th May, the manager gave instructions for a hurdle sheet to be erected and maintained across the roadhead of the supply gate so as to divert a flow of air into the ripping face. The deputies foresaw difficulties in maintaining a hurdle sheet on this steep gradient and suggested that a small fan installed so as to blow air on to the ripping face would be preferable. The manager acquiesced and, on his instructions, a 12-inch diameter, Meco, compressed-air turbine fan was installed. This fan, with a 6-feet length of sheet steel ducting attached on each side, was suspended by means of wire from the steel arch supports so that the ducting was approximately at the same gradient as the roadway and with the outlet ducting pointing to the ripping face. The fan with the ducting was moved forward as the ripping face advanced, and this method of ventilating the ripping lip was still in operation when the explosion occurred.

Samples of air taken in accordance with the requirements of Regulation 3 (a) (i) of the Coal Mines (Ventilation) General Regulations, 1947, since the face started in January, 1955, showed a percentage of methane in excess of 0.4 on only three occasions; these were 0.55 on 28th May, 1.10 on 27th June and 0.70 on 19th August.

The Morning Shift on 6th September

The morning shift on 6th September commenced at the usual time. The pre-shift inspection had been made by the night shift deputy who had reported everything in order. The face conveyor had been moved forward on the afternoon shift of the previous day, and the strip packs and waste-edge chocks had been advanced. The roadside pack of the loading gate had also been advanced, but the roadside pack of the supply gate was about 8 yards back from the coal face. Over a length of a few yards at the return end of the face, the seam had thickened from its normal 3 feet to about 7 feet and the slip of what appeared to be a downthrow fault had been exposed, running roughly in line with the ribside of the supply gate.

There were 13 colliers engaged in coal getting and two advancing the top rippings in the supply gate. Also employed on the face were two conveyor attendants, one at the drive of the retarder conveyor at the return end of the face and the other at the transfer point at the intake end. There were two men getting supplies of timber to the face in the supply gate, and seven men outbye of the face on the loading gate and haulage road. These men with the deputy and shot firer brought the total in the district to 28.

The deputy commenced his first inspection of the face at about 8.0 a.m. and was accompanied by the overman. Between 9.0 a.m. and 11.30 a.m. the deputy made another inspection of the face during which he fired four shots in the coal. He was making a third inspection when the explosion occurred at about 1.0 p.m. He maintains that during these inspections and during his shot firing operations he made careful tests for inflammable gas and found no trace. This is confirmed in respect of his first inspection by the overman who accompanied him.

The shot firer employed on this face fired an aggregate of 22 shots between 7.45 a.m. and 12.20 p.m. He fired 20 of these shots in the coal on the face and two in the supply gate top rippings shortly before noon. The last coal shots to be fired were at the intake end of the face at about 12.20 p.m. All the shots were fired singly. The shot firer maintains that he made careful tests for inflammable gas during his operations and found no trace.

According to the evidence of officials and workmen, there was no sign of any roof weighting and conditions appeared normal in every way up to the time the explosion occurred.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z