I. — Description Of The Colliery
General
Blaenhirwaun colliery is situated near the village of Cross Hands some 16 miles to the northwest of Swansea, near the northern extremity of the coalfield. It has been a working mine producing first grade anthracite coal since 1913. The output is about 350 tons per day and the numbers of persons employed are 360 below ground and 80 on the surface.
It is served by two vertical shafts, both sunk to the Green Vein. The No. 1 shaft, 10 feet in diameter and 155 yards deep, is the upcast equipped with a Walker Paddle fan producing about 55,000 cubic feet of air per minute at a water gauge of 3.125 inches. The No.2 shaft, 13 feet in diameter and 212 yards deep, is the downcast and main winding shaft for men and mineral.
The mine is in the No. 1 Area of the South Western Division of the National Coal Board, and the principal officials are as follows:
| Mr. J. G. Tait, B.Sc. | Area General Manager. |
| Mr. J. D. H. Davies | Area Production Manager. |
| Mr. D. J. King | Deputy Area Production Manager (Operations). |
| Mr. I. R. Jeffreys | Manager. |
| Mr. J. H. Morgan | Under-manager. |
Seams worked and Lamps used
The names of the seams now worked, given in descending order, are the Big Vein, Stanllyd and Lower Pumpquart.
The use of safety lamps has always been required throughout the mine, and automatic firedamp detectors are required by the Coal Mines (Ventilation) General Regulations, 1947, to be provided on longwall faces where electric power is used. The lamps in general use throughout the mine are Nife N.C. 1 13C electric cap lamps, with E. Thomas and Williams Cambrian No. 1 flame safety lamps and Naylor Spiralarms Type M for use by workmen as firedamp detectors. Prestwich Patent Protector Type 6 flame safety lamps are used as officials' inspection lamps.
The seam has an average thickness of about 3 feet with a roof of clift and a floor of fireclay. The volatile content of the coal on an ash-free dry basis is 5.5 per cent. It was reached by driving cross measure drifts from the Green Vein some 26 years ago and has since been extensively worked by the longwall method. The whole of the area worked is geologically disturbed with numerous faults, patches of barren ground and steep and variable gradients.
At the time of the explosion the workings in the seam consisted of two longwall, single-unit, conveyor faces, known as the "P" and "Q" faces respectively. These faces were ventilated in series, the air current first entering the "P" face as shown on Plan No. 1.