IV. — Condition Of 320's Level Section.
Judging the condition of the section by the foregoing reports, it was to be expected that the roof would be fissured and broken, and the plan (Plate 1) shows that such was the case, there being several distinct breaks running parallel with and near to the working faces. In addition, it was also to be expected that, whilst any firedamp which actually issued from the breaks would be diluted and carried away in the ventilating current, some would still remain in those breaks.
The deputy (John Henry York) who made an inspection of the section between the hours of 4 and 6 a.m. on the day of, and prior to, the explosion, reported that there was no firedamp present,. and from the reports it will be seen that such had been its state since the early morning of the 14th February. Prior, however, to that date there had been an issue from a break at the ripping lip in 93's gateroad.
The first mention of this issue of firedamp is contained in the report of Thomas Stokes, deputy on the afternoon shift of 4th February. He explained in evidence that at the end of his shift on that date he instructed the oncoming deputy (York) to have a hurdle sheet put up in order to dilute the firedamp at the point of issue. York did this, and until the afternoon shift of 7th February any firedamp issuing could not be detected; but on that shift and continuously until the morning of the 14th, notwithstanding the hurdle sheet, it was detected and reported.
Thereupon the sheets near the foot of 93's gateroad were loosened, in order to allow a current of air to flow up 93's gateroad and so over the top of the hurdle sheet; and this arrangement continued up to the time of the accident. On and after the 14th February up to the time of the accident, any firedamp issuing from this break was not detectable on the flame of a safety lamp or, at all events, was not reported as having been detected.
A copy of this report was kindly donated by