Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

General Discussion

The Electrical System

33. As it was installed the supply of current to the electrical plant in the 'G' panel was controlled from the section switch in the substation and any necessary isolation of the plant in the MC3 heading was done by removing the cable connecting pins in the tee box near the junction of the 'Miner' heading. Such an installation was open to criticism on the grounds that suitable switchgear should be provided to enable circuits to be isolated safely and recourse to the removal of cable connecting pins should not be necessary. In addition the system was such that any cessation of the supply for any reason meant that the auxiliary fan was stopped. Thus during the progress of any electrical maintenance work or, as in this case, the advancing and re-erection of plant positive ventilation of the area was impossible.

34. The driving of fully mechanised rapidly advancing narrow headings requires that comparatively short lengths of cable be frequently moved from place to place. The P.I.L.C.D.W.A. type of cable as used in this case is not best suited to this sort of work and better results might be obtained from a pliable wire armoured cable or a P.V.C. insulated cable. But whatever type of cable is used it is obviously undesirable to drag it from place to place by means of a chain fastened round it.

35. It is highly important that insulation and conductance tests of all reinstalled cables should be made before the power is restored to the circuit and reliance should not be placed on tests of individual lengths of cable made at some time prior to connection in the circuit. Had such testing been carried out in this case it is possible that the fault would have been discovered.

36. In the investigation the earth leakage devices on both the section switch and the high tension switch were found to be inoperative because of slight defects in the mechanical devices in the switches. Both switches were withdrawn and examined on the surface. It is impossible to say when these mechanical defects originated, but if routine testing of the protective devices had been carried out by the means provided, the defects may well have been revealed and corrected. It is equally impossible to say to what extent the defects contributed to the cause of the explosion. The fault on the cable had to occur before the protective earth leakage devices could operate but the damage to the cable might have been much less severe if the devices had operated correctly and there is a possibility that the ignition might not then have occurred. However in this instance it is probable that the inflammable gas near the point of break in the cable was ignited instantaneously.

37. The standard of maintenance and testing of the electrical plant was not good. The plant in the MC3 heading was not included in the Scheme of Maintenance required to be prescribed by the manager. The reasons advanced for this omission were that the manager had been appointed only some three weeks before the explosion and that during this period the official responsible for the Scheme had been away due to illness. Despite the failure to include the plant in the Scheme there were regular entries in the electricians' log book purporting to show that it had been examined in accordance with the Scheme. The entries in the log book were vague but were said to cover the external examination of all gear including the cables and the checking of gaps in the flameproof covers.

38. The investigation showed quite clearly that the electrical staff in the Tower No. 4 mine, consisting as it did of two Class I electricians, one Class II electrician, two persons appointed under Regulation 8(1) (a) of the Mechanics and Electricians Regulations, and two apprentices, was not sufficient properly to maintain the electrical apparatus. Serious and prolonged efforts have been made by the management to obtain the services of more electricians but these have been fruitless. Persons have been trained at this mine only to leave the industry on attaining minimum qualifications. This problem is not peculiar to Tower Colliery and I have no doubt that in framing their mechanisation programmes, the Board are giving careful attention to the availability of qualified technicians.

The Ventilation of the MC3 Heading

39. The evidence of both officials and workmen was to the effect that with the auxiliary fan running normally the heading was well ventilated and this is generally confirmed by the record of the state of the ventilation. However, the determination made on the day before the explosion revealed a methane content substantially higher than that obtained in the previous week despite a small increase in the volume of air delivered by the auxiliary fan. Nothing could be found to account for this increase in the make of gas except the increased length of the heading with the consequent greater area of coal exposed in the sides. This suggests that the heading was reaching a critical length in respect of the auxiliary ventilation system and emphasises the extreme care necessary in such circumstances. While the actual level of the methane content may not, as in this case, be of legal importance the increment in that content was indicative of trends and demanded careful consideration. The value of statutory sampling of the mine ventilation will be greatly enhanced if these comparisons are made.

40. In spite of the evidence which was given to the effect that when the auxiliary fan stopped, workmen withdrew from the heading and remained out until after the fan restarted, it is a fact that men were working in the heading immediately before the explosion during a period when the fan was not running. Having regard to the system of the power supply to the fan and the fact that in this fast moving heading the conveyors had frequently to be advanced I find it difficult to believe that persons had not worked in the heading on other occasions when it was not positively ventilated.

Conclusions

41. I conclude that the explosion resulted from the ignition of inflammable gas in the MC3 heading. The igniting source was arcing resulting from a short circuit to earth in a newly inserted length of cable serving the electrical equipment in the heading, and occurred on the inside of a loop in the cable where it had been bent back on itself in order to connect it up to the switch in the heading. I think it highly likely that the short circuit was directly due to the insulation of the cable having been weakened as a result of the acute bending to which it had been subjected in making the connection to the switch.

Recommendations

42. I recommend that :—

 (1) 
In any system of working requiring the use of an auxiliary fan provision shall be made so that the power supply to the fan may be maintained while any or all of the other plant in that working is shut down.
 (2) 
In any system of working requiring the use of an auxiliary fan arrangements should be made whereby the supply of electricity is automatically cut off from all electrical apparatus in that working place whenever the auxiliary fan is stopped.
 (3) 
In rapidly advancing headings where short lengths of cable have to be inserted frequently, pliable wire armoured cable or P.V.C. insulated cable should be used. Cable should always be transported in such a manner as to ensure that it is not damaged.

Acknowledgements

43. I wish to record my grateful appreciation of all who took part in the investigation of this occurrence on behalf of the National Coal Board, the National Union of Mineworkers, the British Association of Colliery Management, the National Association of Colliery Managers, and the National Association of Colliery Overmen, Deputies and Shotfirers; and to express my thanks to Mr. J. D. Bowen, Area Surveyor, National Coal Board, who prepared the plan which accompanies this report, and to the members of the clerical staff of the No. 4 Area, who provided me with a verbatim record of the evidence given by the witnesses.

I have the honour to be, Sir,

Your obedient Servant,

C. Leigh

H.M. Divisional Inspector of Mines and Quarries.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z