Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

The Shifts Immediately Before The Explosion

The Afternoon Shift on 27th June

22. Coal filling proceeded normally throughout the afternoon shift of 27th June on O.10 unit under the supervision of W. Doel, an overman, and J. D. McDonald, a deputy. R. Hall, a deputy acting as a shotfirer, assisted by K. Baker, a collier, fired some 30 shots in the coal; neither Hall nor the overman, who had tested the waste at the return end of the face before any shots were fired, found any indication of firedamp. McDonald, on his mid-shift inspection, found small feeders of firedamp in O.10 and O.9 returns and in O.12 loader gate. During his pre-night shift inspection, he found the same small issues.

23. T. G. Morgan, the overman in charge of O.18 said that, because of trouble with the conveyers, coal filling started late in the shift and the 'cut' was not cleared. The deputy for O.18 unit, D. E. Price, during both his mid-shift and his pre-night shift inspections, found firedamp at the face ripping in the return, at the face ripping of the intake, and at two places on the face. It was reported to him late in the shift that a coupling on the face conveyor motor had been sparking, but when he reached the place this had been attended to by a fitter and Price was satisfied that the trouble had been rectified.

The Night Shift on 27th — 28th June

24. Only ripping and repair work was being done on the night shift of 27th — 28th June in O.10 unit, where deputy R. H. Law was in charge. In his mid-shift inspection, he found small quantities. of firedamp in the returns of O.9 and O.10. During his pre-day shift inspection, he found slight indications of firedamp in the return end of the waste and in the return of O.10 unit, in O.9 return rippings and in a cavity farther outbye. He did not find any firedamp in O.10 intake rippings during either of his inspections.

25. At about 3.00 a.m., B. Boots, a shotfirer, assisted by J. H. Evans. fired a round of four shots with a six-shot exploder in O.10 intake face rippings. Boots said that he tested for firedamp; he examined the holes with a break detector and charged each of them with two four-ounce cartridges of Unigex explosive. Evans filled sufficient stemming bags with stone dust. Boots did not put a filled bag at the back of any hole before charging. He fired the round, examined the rippings for firedamp and pulled down some loose stone. Law was not present during the shotfiring but in his inspection later he noticed some bed separation at the face of the ripping. The fore-poling supports had not been advanced, but he considered that this could safely be left for the day shift as nothing was likely to fall.

26. In O.18 unit, deputy W. C. Nash, during his pre-day shift inspection, detected some firedamp in the intake ripping and there replaced a brattice sheet. There was no shotfiring in this unit during the night.

27. W. V. Jenkins and A. Mathews, underground fitters, were putting a two-inch compressed air supply pipe through an existing hole in the brickwork of O.9 Undercast. They noticed that an arch girder on the face side of the undercast had shifted slightly and that a small quantity of debris had fallen, but they apparently considered that there was no immediate danger of further falls. The compressed air was twice cut off from the whole district as Jenkins also repaired a tapping gland on an eight inch compressed air supply pipe. The first period was from about 11.30 p.m. to 12.15 a.m. and the second from about 5.30 a.m. to 6.15 a.m. During these periods the "Venturi" appliances in O.18 unit could not function.

The Day Shift on 28th June

28. The day shift descended as usual between 6.00 a.m. and 6.30 a.m. on 28th June. Nobody can say what work the men were doing on that shift, but the manager said he would have expected the following distribution — five men, including the deputy, on O.10 face; three or four men on the face rippings of O.18 intake; two men working the coal cutting machine at the return end of O.18 face; a maximum of six supply men in O.18 return; and a borer and his assistant in the return just outbye of the crosscut near O.18 unit. The rest of the men, Who normally would have been advancing packs, withdrawing supports and advancing the face conveyor, should on this shift have been along the main loader belts because the manager, having received a report that the conveyors were getting into a dirty state, had arranged that they should be thoroughly cleaned.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z