Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

General Description

The Colliery

5. Six Bells Colliery, formerly known as Arrael Griffin Nos. 4 and 5, is in the No. 6 Area of the National Coal Board's South Western Division and is situated at Six Bells, some twelve miles north of Newport in the Western Valley of Monmouthshire.

6. There are three shafts. One of these, a downcast and man-riding shaft known as Vivian Pit and situated nearly half a mile north, was formerly part of another mine and its existence is not material to the circumstances of this accident. The other two are at Six Bells and are both used for winding men, coal and materials. No. 4, the upcast, is equipped with an electrically driven exhausting fan with a capacity of 280,000 cubic feet per minute at 46 inches water gauge; No. 5 is the downcast.

7. There were 1,213 men employed below ground and 239 on the surface. The output was about 1,800 tons of saleable coal per day, about 830 tons coming from the Old Coal Seam.

8. The colliery has always been 'a safety lamp mine'. There were 1,450 electric cap lamps, 85 flame lamps for use by workmen as firedamp detectors and 79 internal relighter type flame lamps for use by officials.

9. The Under-manager of No. 5 Pit, which included W District, was F. White, who was killed in the explosion: the Colliery Manager was V. Luther; the Group Manager, R. Williams; the Area Production Manager, A. E. Hiscox; and the Area General Manager, L. Walker.

The Old Coal Seam

10. The Old Coal Seam, the lowest worked, was 352 yards deep at the Six Bells shafts but the average depth of W District was 550 yards, the increase being due in part to seam dip but mainly to surface rise. The seam thickness averaged four feet nine inches with a middle dirt band a few inches thick. The Meadow Vein coal, some 22 yards above, had not been worked in this area. The strata between these seams were mainly strong 'clift' or shale, but included two features which call for special mention. Some five feet above the Old Coal Seam there often occurred a bed of quartzitic sandstone about one foot three inches thick. This was found in the shaft sinkings and observed in parts of the district after the explosion. There was also a 'rider' coal, some one foot six inches thick, about 25 feet above the Old Coal Seam.

W District

Lay-out

11. Plan No. 1 shows the W District in relation to active and disused workings from Nos. 4 and 5 Shafts of Six Bells Colliery and also to disused workings in the Old Coal Seam from Marine Colliery, where a disastrous explosion occurred in the Black Vein in 1927.

12. The working faces in the W District were identified by a number prefixed by the letter "O". There were three single-unit long wall conveyor faces situated between one mile and one mile and a quarter from the shafts; all three were advancing northwards towards the disused workings of Marine Colliery The O.10 unit had on its right side the gob of a series of previously worked faces; O.12 unit was beginning to skirt the left side of O.10 unit; O.18 unit had solid coal on both sides. The gradients of the intakes and faces are shown on Plan No. 1; roadways rose slightly towards the faces which, in turn, rose slightly from west to east. O.10 and O.18 were normal production units and O.12 a standby face; coal was filled for two weeks out of three on the morning shift and in the third week on the afternoon shift.

Methods of working coal

13. The O.10 face was 103 yards long and had been advanced at the rate of about 12 yards a month to within about 55 yards of the Marine Colliery old workings. The coal was cut near the floor to a depth of three and a quarter feet by a machine mounted on an armoured conveyor; both machines were compressed air driven. Hydraulic props and linked bars a metre long were used in a 'prop-free front' system of support. The roadside packs were eight yards wide and the waste between was completely caved. The intake loading gate was supported by steel arches backed with wood lagging, the necessary height being obtained by a roof ripping six feet thick. The arches, twelve feet wide and ten feet high, were commonly known as twelve feet arches. The road that had formerly been the intake for O.9 face had become the supply road for O.10 and was being reconditioned as the face advanced. Shots were fired in coal and in the stone of the intake face ripping.

14. The O.18 face was 96 yards long and had been advanced at the rate of about 27 yards a month. The coal was cut near the floor to a depth of four feet six inches and filled by hand onto a belt conveyor, both machines being driven by compressed air. The roof was supported by adjustable friction-type props and linked bars four feet six inches long. The waste had been completely caved until difficult roof conditions prompted a change in May, 1960, to strip packing; the packs were four yards wide and the wastes nine yards. The intake road was supported with twelve feet arches for the first 200 yards of its length and with eight feet arches, eight feet wide and seven feet high, for the last 40 yards. The return was supported with ten feet arches. The necessary height was made by ripping mainly in the roof. Shots were fired in coal and, except in the intake, in stone.

15. The O.12 standby face was 118 yards long. The coal was worked and filled by hand onto an electrically driven scraper chain conveyor. The face had been advanced a total distance of 20 yards, and only ten yards in the six months before the explosion; it was last worked for one shift on 8th June, 1960.

Transport of coal and supplies

16. Coal from the face conveyors was transported by way of stage loaders and semi-troughed belt gate conveyors to two 30-inch belt trunk conveyors in tandem on the main intake; all wore electrically driven. The tram-loading point was on the double parting near old O.1 intake.

17. Supplies for O.18 unit were distributed in trains by a system of compressed air driven haulages from the double parting through O.7 Crosscut to the main return and thence to the face of the supply gate. Those for O.10 and O.12 units were taken in trams through O.7 Crosscut to the main return, then back through O.2 Crosscut to the main intake and there off-loaded and manhandled ; they were drawn up O.10 supply gate on a single tram hauled by a compressed air driven engine situated near the face.

Ventilation

18. The directions of the main ventilating currents are shown by coloured arrows on Plan No. 2. A little more than 5,000 cubic feet of air per minute entered O.10 face from its loading gate and about another 1,500 cubic feet per minute of controlled leakage air passed along the supply gate. The firedamp content at the statutory observing point, 30 feet on the return side of the face, averaged about 0.25 per cent About 9,500 cubic feet of air per minute reach O.18 face and the percentage of firedamp 30 feet from the face averaged 0.8. There was no express provision made to deflect air into O.12 face, but some — measured after the explosion to be 3,300 cubic feet per minute at the lower end of the face — naturally took this course and, to this extent, the ventilation of O.18 face was in series with that of O.12.

General experience

19. The only major difficulty encountered in the working of O.10 unit arose from a large roof cavity which developed in the intake near two parallel faults some 170 yards from the main intake. The cavity apparently began at the roadhead and extended as the face advanced until it was at least 30 feet long and some 20 to 30 feet high from the roof of the seam, and certainly as high as the 'rider' coal. The arches set beneath the cavity were originally covered with lagging timber and some debris. This condition might have been altered by subsequent repair work, but it seems more than probable that by the time the explosion occurred there was a considerable thickness of fallen stone above the lagging. Firedamp apparently accumulated above the debris and was sometimes found at the face ripping until, but not after, 9th May, 1960; at the time of the explosion it was not considered necessary to maintain a brattice sheet at the face ripping. Small quantities of firedamp continued to be found quite frequently elsewhere in the unit.

20. Firedamp in small quantity was found occasionally at the O.12 loader gate face ripping.

21. The most serious trouble from the ventilation point of view was encountered in O.18 unit. Firedamp was frequently found at the intake roadhead face ripping and from time to time shots could not be fired there. The area ventilation engineer, R. W. Simpson, investigated the problem in December, 1959, and on his recommendation a "Venturi" type air blower was installed at the ripping. This did not, however, altogether overcome the difficulty and in May, 1960, the thickness of the roof ripping was reduced from about six feet to three feet by taking up some of the floor and reducing the size of the roadway by using eight feet arches. The manager prohibited shotfiring at the ripping and arranged for methanometer surveys of the unit with daily reports of the results. Another "Venturi" was installed in the face ripping of the return roadhead.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z