III. — The North Side Coking Coal
(6) The explosion occurred in the Kilsyth Coking Coal in No. 4 East District which lies to the north of the shafts. A big upthrow fault runs approximately east and west about 200 yards to the north of the shafts and the seam was developed beyond this from a pair of large stone drifts which were driven across it on a rising inclination. The seam was worked by a series of longwall faces to right and left of the main development which was pressed forward in an approximately north-easterly direction (see plan). The coal was undercut and filled on to belt conveyors on the face which in turn delivered on to gate belts and thence on to a trunk belt in the main intake with the loading point in the vicinity of No. 2 West Junction. At the time of the fire in January the only face being worked was No. 4 East. The face of No. 3 West had been cut out by a fault and a new face was in process of being won out beyond it, while another new face was being opened up along its right-hand ribside. The main developing face going to the north had been rising on an ever increasing gradient beyond No. 4 East and it had been standing for a considerable time before the fire occurred. Of the old roads on the east side access was maintained, through ventilation doors, to No. 1 East where a borehole had been put down into the Hurlet Seam and had been connected to the methane drainage pipe system. No. 2 East Intake was maintained right down to the old face line where a pump was situated in order to deal with a make of water said to amount to 30 gallons per minute. The intake and return of No. 3 East were also accessible. On the west side the old roads leading into No. 1 West had been sealed with stoppings but the roads into No. 2 and No. 3 West were maintained and ventilated with a view to re-opening the faces beyond the fault. The return on the left-hand side of the old north face was sealed up just above its junction with the return from No. 3 West but a flow of air had been maintained up the intake and down the right-hand return, the amount being controlled by a regulator in the latter.
(7) The Kilsyth Coking Coal is notoriously gassy and at this colliery the emission amounted to 1,060 cubic feet per ton. In order to improve the quality of the ventilation a system of methane drainage had been adopted and firedamp was being extracted from the roof of the left-hand return of No. 4 East. The gas drainage pipes were laid in the return airway and up the Upcast Shaft.
(8) Air measurements taken during December, 1959, in the ordinary course, before the fire showed that 46,300 cubic feet of air per minute were passing into the North Side Coking Coal Districts. Of this, 12,600 cubic feet per minute entered No. 4 East Intake with 7,300 cubic feet per minute coming back out the right-hand return (which was regulated) and 5,000 cubic feet per minute out the left-hand return. Firedamp determinations taken at the same time showed 0.15 per cent. in the left-hand return and 0.43 per cent. in the right-hand return.
(9) No. 4 East District consisted of a double unit longwall conveyor face approximately 200 yards in length and 27 inches in height. The coal was undercut at floor level by a chain machine to a depth of 4 feet 6 inches and filled on to face belts which were fire resistant. The face belts delivered at the centre (intake) roadhead on to a gate belt. All the machinery was electrically driven. The face had advanced some 300 yards to the east at the time of the fire. The roof at the face was supported by wooden props and lids and strip packs were built in the wastes. A stone dust barrier was installed in No. 4 East Intake between the air crossing and the Trunk Road.
A copy of this report was kindly donated by
West Cumbria Mines Research.