Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
/   \

On the horse and travelling ways the dust is largely made up of stone dust caused by the grinding of the bottom stone by the feet of men and horses, and in the working face the presence of stone bands in the seam causes the dust to be stony in character. From the downcast shaft to the edge of the water in the engine dip there is a considerable quantity of fine coal dust, due to the haulage of coal by engine power and to coal dust carried down the downcast shaft from the screens. This dustiness would probably continue more or less over the whole length of the engine dip. The greater portion of the engine dip having been filled with water, as described hereafter, for the purpose of extinguishing a fire, the dustiness of the part inundated previous to the explosion was, after the removal of the water, a matter difficult to form a decided opinion upon. It was stated that for 450 yards from the engine dip Hogg's and Gilmour's brows were driven with the cannel as a floor. On examination this distance was found to be 370 yards. The cannel being a hard substance, the coal dust in these places may have been less mixed with stone dust than in other parts of. the pit.

On the 19th April 1888, the day of the explosion, work started as usual, about 6 a.m. The mine had been examined by the deputies before the entry of the workmen, and their reports, in accordance with General Rule 4, were entered into a book and stated the workings to be safe. About 9 a.m. a shot was fired in the coal at the face of Hogg's brow. This shot was prepared by James Hogg, the hewer working in the place, and fired by William John Beaty, the deputy in charge of the district. Hogg's brow was then 42 yards beyond the holing, and air was conducted to within a few feet of the face by ordinary canvass brattice; as has already been stated it was damp. Gilmour's brow 'was not occupied on the 19th April; it was standing at a trouble. James Morrison, the overman, stated at the inquest, that Beaty informed him, before the explosion, that the shot had not thrown the coal, and this' has been confirmed by examination. Hogg's brow was about 8 feet wide and 6 feet high, and it was stated at the inquest that the shots were usually placed in a hole drilled about 4 feet from the floor and about the middle of the place. A plan and section of the appearance of the face of Hogg's brow when it was reached after the explosion is given on plan 2. Cartridges of compressed gunpowder was the explosive used, and was supplied by the owners. It was stated that the shots sometimes contained 2 lbs. of gunpowder. The shots were usually stemmed with ""pug" or soft shale. James Hogg, the hewer, was killed by the explosion which afterwards occurred, and W. J. Beaty, the deputy, was injured, and has lost his reason. Fire-damp issuing near the face of Hogg's brow appears to have been ignited at the point of issue by the flame of the shot, and continued burning, eventually setting fire to the coal and brattice. Efforts made by Beaty, Hogg, and others to extinguish the flames were unavailing; the fire increased, and the brattice was burning to the thirl, and smoke passing along with the current of air forced workmen to the windward or north side of Hogg's brow to leave their places.

The manager, Mr. Johnson, the under-manager, Mr. Davison, and the overman, Joseph Morrison, were engaged near the top of the engine dip, and were informed of the fire about 9.30 a.m. They at once proceeded to the place, and after an examination decided to cut off the air. For this purpose a stopping of bricks and mortar 14 inches thick was erected in Gilmour's brow at the point A., plans 1 and 2. This stopping was commenced about 10.30 a.m., and finished about 2 p.m., and no special difficulty appears to have been felt in its building. Before this stopping was commenced several men had left the Main seam level, and during its building all the workmen were sent out before 11 a.m., except a number who were retained to deal with the fire. Work continued as usual in the Ten Quarters seam direct from the shafts.. Morrison, the overman, was instructed by Mr. Davison, the under-manager, to nearly close the regulators controlling the air ventilating the North brow and Ten Quarters, the incline, and the east and west sides of the shaft level. This he did some time about 12.30 p.m. The effect. of closing these regulators would, under ordinary conditions, cause more air than usual to pass down the engine dip and round the district where the fire was burning. Shortly before the stopping A. was finished a stopping at B., built of cannel (a hard inferior coal), in the. third thirl from the face of Hogg's and Gilmour's brow, was opened, and about the same time the stopping in the second thirl from the face was plastered with lime. After the stopping B. was opened the air current passed through the 3rd thirl from the face, and workmen went through it into Hogg's brow, and attempted to build a stopping at E. The smoke and heat prevented this being done. It was stated at the inquest that loose stones were then built up or thrown together in order to close the road, but this also was found to be impracticable, and a retreat was made before 3 p.m. While the operations were being conducted near the fire, it was stated by several witnesses at the inquest that slight explosions took place, one at 11.0 a.m., one at 1.30 or 2.0 p.m., and one at 3.0 or 4.0 p.m. The manager, Mr. Johnson, denied all know ledge of this. He stated falls might have taken place near the fire, and the noise might cause persons near to think there were explosions. No one was burnt or injured by any explosion at these times. There is, however, good reason to suppose that explosions did take place.

About 3 p.m. a consultation was held in the office on the surface, at which were present Mr. Johnson, manager, Mr. Davison, under-manager, Mr. Wedgewood, chairman of the directors, and Mr. J. E. Mulcaster, secretary. It was then decided to isolate the fire by flooding 130 yards in length of the lower parts of the engine and back dips and Hogg's and Gilmour's brows, and by building a stopping in the return air way through the nip out at the higher level. It was proposed to erect the stopping in the return first, and in order to do this it was decided to reverse the direction of the current of air so as to clear away the smoke to allow persons to work.

When Mr. Davison returned from the consultation of the surface he went down the engine dip and opened the wood doors 1, 2 and 3 at the bottom of Hogg's brow. This was about 4 p.m. The effect of opening these doors was intended to have been, and may have been, to allow part of the air coming down the engine dip to pass direct up Hogg's brow to the return and reduce the quantity passing the fire. After the doors were opened at the bottom of Hogg's brow, the diverted air had still to pass a canvass door on Hogg's brow or if either of the bords between the nip out and Hogg's brow were open, canvass sheets on the ends ; part of the air would probably scale past these points and part pass up the ordinary route and through the thirl that had been opened.

In order to change the direction of the air, stoppings of wood and canvass were erected or in the course of erection at S1, S2, and S3; see plan 1. These stoppings were made of planks about 9 in. wide and 1 in. thick nailed longitudinally to props set in the passage, a recess being cut in the coal on each side. The wood stopping thus formed was covered on one side with canvass brattice cloth.

These stoppings were commenced between 4 and 5 p.m., and may all have been completed before the explosion. They were built in the order of S2, S1, and S3, but were proceeding contemporaneously to some extent. The stopping S2 does not appear to have been essential to the proposed change. Shortly before the stopping S1 was completed, except for its canvass covering, the doors at 4 and 5 were opened wide and propped back, the doors 6 and 7 on the back dip were gradually opened, and the course of the air was then as follows :— the air came down the engine and back dips, uniting into one current near the doors 6 and 7; part of it passed to the right over the air crossing near and the remainder passed to the left along the return to the nip out, where it was joined by the reduced current (caused by closing the regulator) from the district to the west of the shaft level. This combined current passed through the nip out and dividing, one part of it passed up Hogg's brow, through the third thirl from the face, and then round the workings on the south side of Gilmour's brow to the engine dip, where it would meet the other part or air that scaled past the canvass door on Hogg's brow below the return through the nip out; these combined currents then ascended the engine dip and passed by the road below the stopping S1, passed the opened doors 4 and 5, and so to the upcast shaft. About the time the air was changed James Morrison was directed by Mr. Davison, the under-manager, to open the regulators he had closed in the morning. He went, accompanied by G. Wright, a shiftman, and about 7.30 p.m. opened the regulator near the three air crossings regulating the current on the east side of the shaft level, and was proceeding to the regulator on the west side of the shaft level when the explosion took place. Neither Morrison nor Wright were injured. They lost their lights by the movement of air, but came out in the dark to the shaft. Joseph Morrison, the overman, notwithstanding the shock he must have received, remained for some hours in the pit after the explosion, assisting in the recovery of the survivors and bodies of the victims.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print